BU BÖLÜM HAKKINDA
In the third episode of Design Exchange, host Mohammed Ul-Haq, head of healthcare at HLM Architects, is joined by Morys Loveluck, director at Loveluck Architecture and Jeremy Holifield, responsible officer for Prince Charles Hospital Construction Programme, to explore the redevelopment of Prince Charles Hospital in Merthyr Tydfil.
The hospital required significant upgrades to diagnostics, theatres, therapies and dental services, but with limited space on site and an ageing infrastructure that couldn’t support modern plant requirements, the challenge was clear: how do you expand and modernise within a fully operational hospital?
ingilizce
Birleşik Krallık
TRANSKRİPT 🔗
Are you the producer of this podcast?
Add a podcast transcript
Need Audio-to-Text?
Transcribe with Listen411 in Just 60 Seconds
SON BÖLÜMLERİ ARA
Design Exchange with HLM Architects için geçmiş bölümleri ara.
BU PODCAST'IN DİĞER BÖLÜMLERİ
In the second episode of Design Exchange, host Richard O'Neill, Strategic Director at HLM Architects, is joined by Olivia Jackson and Martyn Saunders to tackle one of the most persistent challenges in the built environment around viability.
With rising costs, skills shortages, planning delays and a…
In the first episode of Design Exchange, host Olivia Jackson, Head of Regeneration at HLM Architects, is joined by Richard O'Neill, Strategic Director at HLM Architects, and Martyn Saunders to unpack one of the most significant shifts in UK public sector structure in a generation.
With 131 councils…
Feragatname: Bu sayfaya yerleştirilmiş podcast ve sanat eserleri, sahibinin mülkiyetinde olan ve Listen Notes, Inc.'e bağlı olmayan veya tarafından onaylanmayan HLM Architects'e aittir.
DÜZENLE
Podcast veritabanını güncel tutmaya yardımcı olduğunuz için teşekkür ederiz.