ABOUT THIS EPISODE

English
United States

SHOW NOTES 🔗

TRANSCRIPT 🔗

SEARCH PAST EPISODES

Search past episodes of The Data Center Daily.

OTHER EPISODES IN THIS PODCAST

The New York Times reports Meta has claimed billions in research tax credits by treating its AI data centers as experimental pilot models. Plus Michigan's conditional approval of DTE's Google contracts, MISO's 120-day study for paired large loads and generation, TeraWulf's 1 GW Muskie contract, and…
Oracle proposes absorbing about $300 million of rising Point Beach nuclear costs for its Port Washington campus, while Spain's draft decree would make data centers prove hour-by-hour renewable backing or lose their grid permits. Plus Crusoe-linked filings with no tenant, Memphis's moratorium vote, …
A bipartisan Senate permitting package would make data centers pay both incremental and embedded transmission costs, while OpenAI takes a 20-year, roughly 8-gigawatt lease at SB Energy's Ohio campus backed by more than 9 gigawatts of planned gas. Plus TVA's Clinch River SMR permit and two fights ov…
Michigan regulators approved DTE's 20-year power contracts for Google's 1 GW Van Buren Township campus with some of the toughest ratepayer protections yet, while Amazon signed a 690 MW Calvert Cliffs nuclear deal and, per the FT, is pitching investors an $8 billion Grace Blackwell sale-leaseback. P…
Pennsylvania regulators propose interrupting new large loads that haven't brought their own capacity before anyone else during PJM grid events, while a $60 billion debt package forms behind Broadcom's compute for Anthropic. Plus Colossus's 90-day leases, a Microsoft-linked New Jersey site's year of…
Disclaimer: The podcast and artwork embedded on this page are from The Data Center Daily — Lantern Podcasts, which is the property of its owner and not affiliated with or endorsed by Listen Notes, Inc.