ABOUT THIS EPISODE

English
United States

TRANSCRIPT 🔗

SEARCH PAST EPISODES

Search past episodes of ENR Critical Path Podcast.

OTHER EPISODES IN THIS PODCAST

Alquist 3D Chariman and Founder Zach Mannheimer talks to ENR Senior Editor Jeff Yoders about housing, the journey of 3D printing concrete homes and commercial products and how his company made additive manufacturerd Wal-Mart Supercenters.
Polysiloxane coatings are redefining long-term protection for water storage and treatment assets. In this episode, learn how these advanced systems outperform traditional epoxy and polyurethane coatings with superior UV resistance, durability and reduced maintenance needs. Explore how the smooth, n…
What does it take to build a lasting career in construction? Three senior women leaders from J.E. Dunn, Austin Industries, and Findorff share hard-won perspectives on resilience, navigating burnout, and earning a seat at the table. Sponsored by: CMiC
In a multimedia podcast, the CEO of GISI Consulting Group discusses how the collective utilizes a roster of A-list firms under one platform, with 10,000+ employees advising on megaprojects across the globe.
When construction abruptly stopped at the former Pfizer headquarters redevelopment in Midtown Manhattan after workers discovered buckled steel columns and floor sagging, public attention quickly turned to one question: What happened? But before investigators can determine why a structural failure …
Disclaimer: The podcast and artwork embedded on this page are from www.enr.com, which is the property of its owner and not affiliated with or endorsed by Listen Notes, Inc.