00:00:00.000 --> 00:00:03.322
What do you really want people to take away from this, conversation?
00:00:03.633 --> 00:00:12.516
Have as much of your detail and your design done prior to having your contractor bid or start the job.
00:00:12.635 --> 00:00:20.705
Building is a messy job the more that you can have everything done in advance, before we even start the process, the better.
00:00:21.765 --> 00:00:27.326
Welcome to Stuff Interior Designers Need to Know, the podcast where the title says it all.
00:00:27.576 --> 00:00:38.106
If you're a residential interior designer this is the place to find out the stuff you need to know to succeed in business in the short and long term and create a business that makes you seriously happy.
00:00:38.886 --> 00:00:49.426
Today I'm chatting with Chris and Lisa of Rain Cap Construction in Seattle, Washington, about what they wish interior designers knew about what to put in their design files.
00:00:50.091 --> 00:01:03.691
From floor plan drawings to elevation details, this is the stuff you need to know if you want your contractor to become not only a great trade partner, but also one of your biggest fans and best referral partners.
00:01:04.620 --> 00:01:07.930
A little context and a confession before we dive in.
00:01:08.400 --> 00:01:12.971
I worked closely with Rain Cap Construction for nearly 20 years.
00:01:13.430 --> 00:01:23.230
While they weren't the only contractor who implemented our remodel designs at Seriously Happy Homes, they were, without a doubt, one of our best and favorite contractors.
00:01:23.840 --> 00:01:30.870
In fact, if I hadn't been married to a contractor, they would have been the ones I would have hired for my own remodels for four reasons.
00:01:30.870 --> 00:01:39.340
First, before starting rain cap construction, Chris was an electrical engineer, making him unsurprisingly impeccable with details.
00:01:39.811 --> 00:01:44.471
His projects are well built and his job sites are kept clean and tidy.
00:01:45.131 --> 00:01:58.740
For anyone who's worked with a messy contractor, you know how easy it is for expensive fixtures to get misplaced or areas not under construction to get damaged, and those things never happen on a rain cap job site.
00:01:59.506 --> 00:02:05.706
Second, before starting RainCap Construction, he also spent a number of years flipping investment houses.
00:02:06.225 --> 00:02:18.756
That makes him and his team really good at value engineering, meaning that he helped our mutual clients spend their money effectively and not spend any money they didn't have to.
00:02:19.936 --> 00:02:25.186
Third reason I loved him is that he limits his remodeling territory to North Seattle.
00:02:25.716 --> 00:02:36.786
And while that meant I couldn't use him on projects elsewhere, it made him a reliable expert on craftsman remodeling, which is the main thing that we did in North Seattle.
00:02:37.520 --> 00:02:52.450
Thanks to having remodeled so many North Seattle homes, it was like he had x ray vision and could anticipate costs and hidden problems so early that I rarely had to make design revisions when he was involved on a project from the start.
00:02:53.520 --> 00:03:00.670
I say all of this because the relationship a designer has with their contractor is the ingredient that makes it possible.
00:03:01.270 --> 00:03:13.741
Or not possible for our designs to not only get built, but be built on time and on budget leading to happy clients and awesome referrals and great after photos.
00:03:13.991 --> 00:03:16.241
But that relationship is a two-way street.
00:03:16.300 --> 00:03:22.450
And what we provide to the contractors has everything to do with how well they can deliver for us.
00:03:23.381 --> 00:03:36.411
So without any further ado, let's dive into this conversation and learn just exactly what a general contractor needs from their designer in order to become their biggest fan and best referral partner.
00:03:37.911 --> 00:03:39.020
Hi, Chris and Lisa.
00:03:39.061 --> 00:03:41.270
I'm so excited to have you on the show today.
00:03:41.270 --> 00:03:42.441
Thank you for having us.
00:03:42.501 --> 00:03:43.121
Hi, Rebecca.
00:03:43.200 --> 00:03:46.871
We have known each other for going on two decades.
00:03:46.920 --> 00:03:51.872
You were one of the primary contractors that we partnered with a seriously happy home.
00:03:51.872 --> 00:03:53.181
So we go way back.
00:03:53.508 --> 00:03:59.118
The purpose of our conversation today is to talk about the files that I used to hand off to you guys.
00:03:59.618 --> 00:04:11.598
What was good in those files and what you really wish other interior designers would do so that they're providing the information you need to give clients the results we want them to have.
00:04:12.050 --> 00:04:15.599
I want to talk big picture about the format of our files.
00:04:16.100 --> 00:04:22.158
Our files had a cover sheet, floor plans, which would include like lighting plans and stuff.
00:04:22.687 --> 00:04:23.538
Elevations.
00:04:24.257 --> 00:04:30.848
Pictures of all of the materials that were going to be included, and then a materials list.
00:04:31.858 --> 00:04:38.898
What is it that you guys liked so much about our files and how were they different from what you see from a lot of other interior designers?
00:04:40.687 --> 00:04:41.850
I'm actually holding up.
00:04:41.850 --> 00:04:45.711
The last seriously happy homes project that we work on.
00:04:46.000 --> 00:04:48.600
This 1 came out of your office in August of 2020.
00:04:48.740 --> 00:04:51.100
For a client of ours in Seattle.
00:04:51.196 --> 00:04:52.526
we finished the basement.
00:04:52.555 --> 00:04:54.505
Now we're doing the main and the upper floor.
00:04:54.855 --> 00:04:59.665
I spent a good portion of yesterday going through your documentation and, writing an estimate from it.
00:05:00.165 --> 00:05:05.855
It starts there where I'm sitting down and trying to figure out what everything's going to cost and pulling numbers out.
00:05:06.355 --> 00:05:26.814
At this point, I don't have to care too much about the pictures that show what the mirror's going to look like and that sort of thing, but I, do end up spending a lot of time in your specification section where wonderfully you have links that I can click on that will take me straight to the website where I can see the price I can plug that into our material allowances and everything is there for me to write an estimate.
00:05:27.314 --> 00:05:37.535
I would jump in and say that through the estimating process it is so helpful to have all of the details because the devil really is in the details and so is the cost.
00:05:37.880 --> 00:05:41.841
when we're working with other designers, sometimes the.
00:05:42.021 --> 00:05:49.685
Concept is fleshed out, but all of the details haven't been completely decided on by the client or by the designer.
00:05:49.735 --> 00:05:54.144
And that makes it much more difficult for us to have an accurate price.
00:05:54.535 --> 00:05:59.375
Remodeling, especially in the Seattle metro area is extremely expensive.
00:05:59.709 --> 00:06:04.269
we strive hard as a company to have an accurate.
00:06:04.351 --> 00:06:09.302
Estimate and then meet that accurate estimate when we actually do the work.
00:06:09.735 --> 00:06:24.259
having all of these details helps Chris create a much more accurate estimate that then when we go through and do the building, we can say, Oh, we're meeting these targets for our costs because we had all the information that we needed when we started.
00:06:24.495 --> 00:06:28.035
I'm actually would love to ask two questions that are related.
00:06:28.035 --> 00:06:29.964
So one is about allowances.
00:06:29.964 --> 00:06:33.435
I think we should talk about allowances and what they look like a lot of times.
00:06:33.904 --> 00:06:41.134
but first I'd like to ask I know what I mean when I say details, what details come to your mind where you're like, oh cool.
00:06:41.134 --> 00:06:42.584
Those are all accounted for.
00:06:42.584 --> 00:06:44.475
How fine grained are we talking?
00:06:45.048 --> 00:06:52.747
I would say it's all of the specifics about For example how all of the details of the tile is going to work together.
00:06:52.788 --> 00:06:59.083
That oftentimes on other designs is left fairly ambiguous.
00:06:59.483 --> 00:07:05.213
It might not even be documented how all of the details of the different tiles are going to work together.
00:07:05.713 --> 00:07:09.853
You always had fabulous tile designs that were fairly complicated.
00:07:09.872 --> 00:07:19.072
You showed exactly how the tile was to be laid out, how it was going to transition into, say, another tile, what kind of transition.
00:07:19.317 --> 00:07:22.908
Are we going to use between one surface and the next?
00:07:23.858 --> 00:07:40.927
All of those details are super important and that allows our tile installer to have an accurate price on his install because it varies widely depending on the type of tile you're going to choose and the transitions between one surface and the next.
00:07:41.327 --> 00:07:43.658
That's one example, Chris, maybe you have another.
00:07:44.182 --> 00:07:50.232
One part I always liked is, just even like, the light switches would be laid out and located on the elevation.
00:07:50.232 --> 00:07:56.612
And then you'd have a blow up of that light switch saying this switch is going to control these lights and this switch is going to control this fan.
00:07:57.281 --> 00:08:08.461
Our field guys really, really like being able to just move efficiently on the job site not having to constantly stop and, circle back to our clients to clarify all these little details.
00:08:08.641 --> 00:08:10.632
And they don't want to guess because they don't want to be wrong.
00:08:11.132 --> 00:08:25.601
I find that a lot of designers keep a lot of these things in their head thinking, Oh, I'll just show up on site and tell people where to install it that day, which I'm assuming leads to constant miscommunications and delays.
00:08:25.641 --> 00:08:26.281
Am I right?
00:08:27.362 --> 00:08:29.901
yeah, and a lot of time spent in meetings.
00:08:30.401 --> 00:08:38.981
We used to work with one designer who we finally had to quit working with because she would insist on a weekly meeting where she would come out to the job site.
00:08:39.701 --> 00:08:41.042
She wanted me there as the owner.
00:08:41.042 --> 00:08:42.841
She wanted our project manager there.
00:08:43.162 --> 00:08:48.642
And then if, if we had a field staff on site, which we almost always did, that they all had to stop.
00:08:49.371 --> 00:08:52.711
So there might be two other guys standing around listening.
00:08:52.721 --> 00:08:54.371
And then you had the owner.
00:08:54.601 --> 00:08:57.312
And these meetings would drag on for at least three hours.
00:08:58.861 --> 00:09:07.458
While she sat and kind of figured out all the little trim details and kind of worked out everything on site as a team.
00:09:07.668 --> 00:09:14.399
I think she thought that her method was good and maybe for some people it was, but that's expensive.
00:09:14.438 --> 00:09:17.599
When you have all those people standing around, not working.
00:09:17.908 --> 00:09:21.688
Those meetings can cost a thousand bucks, 2, 000.
00:09:22.229 --> 00:09:28.908
That's expensive for our client to do that once a week, instead of just having everything fleshed out in her documentation.
00:09:28.960 --> 00:09:32.360
Before we began or preferably before I wrote my estimate.
00:09:33.009 --> 00:09:43.145
And that was a cost that we couldn't that weekly we were going to have these three hour meetings And the cost of that quickly ballooned.
00:09:43.535 --> 00:09:51.003
It really slowed down Our schedule, which is another one of our milestones that we really try to keep track with.
00:09:51.052 --> 00:10:00.432
After we get our project going we have the schedule, which in residential contracting constantly changes, but we're really trying to meet those timelines.
00:10:00.802 --> 00:10:04.102
Oftentimes our homeowners, They might be renting a place.
00:10:04.342 --> 00:10:07.182
They might be living in, in the house while we're remodeling it.
00:10:07.403 --> 00:10:12.893
There might be some sort of a deadline that they're trying to meet and we're trying to meet that with them.
00:10:13.192 --> 00:10:31.552
But if we have these constant weekly slowdowns where our staff has to literally put down their hammers, our trade partner has to put down their tools and we're all standing around while the designer thinks through details that you already when you do your process, you've already done all that work.
00:10:31.562 --> 00:10:32.062
It's done.
00:10:32.062 --> 00:10:33.283
It's in our piece of paper.
00:10:33.482 --> 00:10:38.263
And our guys are so happy because they can literally just keep moving along.
00:10:39.482 --> 00:10:41.133
It's a completely different experience.
00:10:41.345 --> 00:10:43.875
My brain is going a million different places right now.
00:10:44.634 --> 00:10:47.044
I still want to circle back to allowances in a second.
00:10:47.085 --> 00:10:57.159
But first, I'm curious I'm sure it was different with different designers, but these designers who are Saving these details for onsite meetings.
00:10:58.090 --> 00:11:02.659
Are they at least documenting them well, or is it all staying verbal?
00:11:03.365 --> 00:11:07.086
That is the problem is that oftentimes they stay verbal.
00:11:07.586 --> 00:11:15.551
A million details verbally communicated, doesn't get written down, isn't on plans, That's our trickiest situation.
00:11:15.610 --> 00:11:28.240
Because we have got into problems where we get to the end of the project and the homeowner or the designer says, wait a second there was supposed to be an outlet for the microwave here and there isn't one.
00:11:28.260 --> 00:11:29.120
What happened?
00:11:29.211 --> 00:11:29.451
Yeah.
00:11:29.451 --> 00:11:32.150
And I, and I told Bob that, you know.
00:11:32.740 --> 00:11:33.880
During that one meeting.
00:11:34.081 --> 00:11:36.138
Bob can't remember anybody telling him that.
00:11:36.138 --> 00:11:39.008
In the three hour meeting where he glazed over, right?
00:11:40.118 --> 00:11:41.368
After the second hour.
00:11:41.447 --> 00:11:41.538
Right.
00:11:42.038 --> 00:11:42.847
That's right.
00:11:42.857 --> 00:11:44.807
That's, that is such a big problem.
00:11:45.097 --> 00:11:48.398
Verbal instruction is such a big problem because it's open to interpretation.
00:11:48.398 --> 00:11:50.217
Our guys get nervous because.
00:11:50.508 --> 00:11:52.398
They're not sure if they remember it properly.
00:11:52.398 --> 00:11:59.998
And when there are a lot of meetings, like Lisa said, people start to lose the ability to hang in there after a while, especially in this industry.
00:11:59.998 --> 00:12:02.288
Most people are ADHD like myself.
00:12:02.482 --> 00:12:04.562
you're working with your hands for a reason.
00:12:04.638 --> 00:12:05.847
might miss a couple of things.
00:12:05.847 --> 00:12:06.038
Yeah,
00:12:07.712 --> 00:12:12.472
So you, you gave the example of how something might have been asked for and then missed.
00:12:12.572 --> 00:12:18.298
I also have had clients come to me and say, My project went so over budget
00:12:18.407 --> 00:12:20.030
Call
00:12:20.097 --> 00:12:22.217
was telling me how much more that was going to cost.
00:12:22.217 --> 00:12:26.057
And by the time the project was over, I'm like, where did all this money go?
00:12:26.457 --> 00:12:32.427
And if you don't have a record of them saying, yes, I agree to this 2, 000 new idea.
00:12:32.447 --> 00:12:39.557
And to this upgrade on this light fixture, that's going to add another 1, 500 that adds up really quickly.
00:12:40.148 --> 00:12:43.778
And then at the end, you've got all that finger pointing who's responsible?
00:12:44.082 --> 00:12:46.852
for these cost overruns and time overruns.
00:12:47.552 --> 00:12:58.940
To your point, once the project's rolling, it really is like, rolling rock or as people say, the plane going down the runway, and you don't want to build it as the plane is going down the runway.
00:12:59.190 --> 00:13:06.399
To try to create an estimate for all of the details that come along while we're actually trying to build it.
00:13:06.980 --> 00:13:14.370
It's not practical After we have that meeting where everyone's standing around for their three hours, the guys are just ready with their hammers to get going.
00:13:14.529 --> 00:13:33.774
So it doesn't provide us the time to create a thoughtful estimate of how much this is going to cost to do those details that the designer just told us about, because she is expecting our staff to implement those changes for her right as she's talking or that design idea, like, okay, I just told you, now you're going to go ahead and do it.
00:13:34.054 --> 00:13:42.075
There's no time in there for us to say, that's going to be an extra 5, 000, 15, 000, 50, 000 change.
00:13:42.404 --> 00:13:46.205
She's just thinking okay, you're going to implement my vision now.
00:13:46.434 --> 00:13:48.485
And it is going to be what it's going to be.
00:13:48.544 --> 00:13:48.934
Yeah.
00:13:49.754 --> 00:13:53.065
So that takes us back to the estimating process.
00:13:53.065 --> 00:13:58.294
And it's funny, we're 20 minutes into this conversation and we're still at the beginning where we've got to get our pricing right.
00:13:58.735 --> 00:14:00.105
I'm curious about two things.
00:14:00.215 --> 00:14:01.634
One is allowances.
00:14:01.654 --> 00:14:08.875
When a contractor doesn't start with a design, then frequently they will put allowances into an estimate.
00:14:09.434 --> 00:14:16.125
Designers frequently complain that those allowances are unreasonably small.
00:14:16.745 --> 00:14:18.504
Would you like to speak to that?
00:14:19.764 --> 00:14:22.534
Well yeah yeah, that's true.
00:14:22.634 --> 00:14:32.205
You know, with your documentation you know, it's, it's all spelled out It takes a little bit more time to go through because I need to pull all that stuff out of it, but it's there and then we have it and it's a tight estimate.
00:14:32.445 --> 00:14:37.164
If it's not there, like it usually is not, or a I'm writing a price off schematic design.
00:14:37.549 --> 00:14:40.929
Which is kind of normal construction process.
00:14:40.929 --> 00:14:46.769
During schematic design everybody's still flying at 30, 000 feet and you know, we know where the walls are.
00:14:46.769 --> 00:14:48.299
We don't know what the tiles going to look like.
00:14:48.299 --> 00:14:50.350
We just know that there is tile on that wall.
00:14:51.139 --> 00:15:18.894
So, yeah, I will, I'll lean back on my experience and try to gauge with the client what sort of level of finishes they're looking for, we have a questionnaire that we issued to our clients before the first meeting with them, where we asked them to kind of spell some of that out a little bit with their priorities are and then I'll, I'll come up with something and you know, hopefully I do a good job.
00:15:19.125 --> 00:15:21.274
I've been getting killed on plumbing fixtures lately.
00:15:21.284 --> 00:15:29.210
My goodness, where it used to just be like a, you know, A shower valve and a shower head, like 400 or something.
00:15:29.519 --> 00:15:33.500
And now I'm seeing basement bathrooms with 1, 700 shower sets.
00:15:33.940 --> 00:15:45.190
I'm not really doing my customer a service when I go in for an initial estimate and then the price ends up going up so much as we go through the pre construction process, but it is kind of hard to know.
00:15:45.190 --> 00:15:47.639
And it's hard to keep up with what's in the industry.
00:15:47.690 --> 00:15:56.299
I'm sure I've left some designers frustrated sometimes where they've come back later and said, my God, your contractor put in 400 dollars for the shower valve shower set.
00:15:56.340 --> 00:16:00.529
And that's going to get us something at Home Depot, but that's not going to do it in today's market.
00:16:01.669 --> 00:16:07.720
So I do the best I can to gauge the situation and put in numbers that hopefully will work.
00:16:08.600 --> 00:16:26.461
I would also say that if a designer is wanting to have some competitive bidding between their contractors You want to be able to compare apples to apples, so if you do not have all of the details of the fixture and as a contractor, we know we're in a competitive bidding situation.
00:16:26.691 --> 00:16:35.551
It isn't to our benefit to say, I'm going to put in 2000 fixtures for your bathroom when.
00:16:36.020 --> 00:17:04.049
you know, my competitor might be putting in 400 and then if you as a homeowner or a designer are looking at the bottom line of, say, three different bids that you have and they vary widely, you aren't able to compare apples to apples because they're having to basically guess at the fixtures and the price point, which varies by Hugely because every client and designer has a different idea and we deal with all different types.
00:17:04.789 --> 00:17:12.063
Some people might be doing something very economical and some people might be doing something that is on the other spectrum of that.
00:17:12.303 --> 00:17:26.451
If you're trying to go through a competitive bidding process as a designer or a homeowner, to not have that detail you're not doing yourself a service because you're, won't be able to accurately compare those estimates against one another.
00:17:26.790 --> 00:17:30.421
That's exactly right, and that's what I wanted to get to with this allowance thing.
00:17:30.471 --> 00:17:41.131
It's a guess based on so many assumptions about what quality level the client wants, and just a bunch of things that the client may not have even thought about by the time they're talking with you.
00:17:41.941 --> 00:17:53.996
So, if we get the opportunity as designers to pre design and get a proper estimate, The more detail we provide, the more everybody's going to be happy at the end.
00:17:54.445 --> 00:18:03.645
Even though this episode is about what we designers can do better with our files, we have to remember that not every contractor is as detailed as the two of you guys.
00:18:04.185 --> 00:18:09.415
And estimates may not be clear when you're trying to compare apples to apples.
00:18:09.415 --> 00:18:19.096
So the Only way to feel confident that you're comparing like to like is to provide a detailed design that says this is what you're pricing.
00:18:19.705 --> 00:18:21.066
All the details are worked out.
00:18:21.076 --> 00:18:22.165
There's no questions.
00:18:22.695 --> 00:18:23.576
So here you go.
00:18:23.901 --> 00:18:25.132
and
00:18:25.215 --> 00:18:26.705
So we're at the estimating phase.
00:18:26.736 --> 00:18:28.546
You're looking at my materials list.
00:18:28.806 --> 00:18:34.826
When designers don't include links, are they at least giving you pricing or are they just kind of letting you guess?
00:18:35.310 --> 00:18:35.661
Okay,
00:18:35.732 --> 00:18:38.442
and yours is so nice cause you even put the price in there too.
00:18:39.532 --> 00:18:41.827
So I can, I can just plug in the number.
00:18:41.827 --> 00:18:43.307
I don't even have to hit the link.
00:18:43.367 --> 00:18:48.107
What we normally will get if they're pretty clear, it'll be a set of drawings.
00:18:48.502 --> 00:18:52.893
And then it's oftentimes an Excel spreadsheet that has, you know, here's your kitchen faucet.
00:18:53.222 --> 00:19:10.482
Usually it's just a name, you know, it's a X branded, whatever model sometimes when it's early phase when you're working off schematics or design development type documents they might say, we haven't selected the tile yet, but we want you to put in 25 a square foot for the.
00:19:10.782 --> 00:19:20.472
For the wall tile in the shower, 15 a square foot for the floor tile backsplash, you know, X so sometimes people will actually just tell us.
00:19:20.962 --> 00:19:27.073
What dollar allowances to use prior to doing a full specification, which is kind of a nice way to go.
00:19:27.557 --> 00:19:31.538
so there are some alternatives that will still let you do your estimating job well.
00:19:32.752 --> 00:19:33.222
that's right.
00:19:33.252 --> 00:19:49.948
Because the reality is typically today, our customers are choosing their contractor at the early part of the design process so that the contractor can be involved throughout the design and make sure that you have A scope and a budget that are harmonious.
00:19:50.357 --> 00:19:53.548
And then as well, the contractor can be there through pre construction where that.
00:19:54.178 --> 00:19:59.248
Where the architect or owner can circle back and say Boy, we'd like to move that window.
00:19:59.258 --> 00:20:00.938
How big of a deal is that going to be?
00:20:01.357 --> 00:20:04.327
Or is it possible to vault the ceiling in this area?
00:20:04.327 --> 00:20:06.018
And if so, what would that cost?
00:20:06.228 --> 00:20:10.218
So it's a big advantage of having the contractor there throughout the process.
00:20:10.218 --> 00:20:17.903
But it also means that they're going to have to potentially do competitive bidding with drawings that are not fully cooked at
00:20:17.942 --> 00:20:21.212
Yeah, and it is a little bit of a chicken and an egg kind of an industry.
00:20:21.212 --> 00:20:23.932
It's hard to know which thing to do first.
00:20:24.932 --> 00:20:31.472
Okay, so fast forward now, you've estimated the project, you've got the project, it's time to actually start the project.
00:20:32.472 --> 00:20:33.272
Floor plans.
00:20:33.623 --> 00:20:35.803
What do you love about what we provide?
00:20:35.813 --> 00:20:37.853
What do you wish designers would provide?
00:20:38.363 --> 00:20:40.222
Just lots and lots of details.
00:20:40.232 --> 00:20:41.583
The devil's in the details.
00:20:42.212 --> 00:20:45.883
And most designers don't really fully know what that means.
00:20:45.942 --> 00:20:57.343
One of the things you taught me in early days was that you needed an existing floor plan as well as the new floor plan because you need the existing floor plan in order to pull permits
00:20:57.432 --> 00:20:57.863
correct.
00:20:57.913 --> 00:20:58.373
Yeah.
00:20:58.432 --> 00:21:01.573
And it's really helpful when writing our estimate as well.
00:21:01.883 --> 00:21:04.232
So you can see where the changes are, big picture.
00:21:04.472 --> 00:21:04.982
that's right.
00:21:05.252 --> 00:21:05.782
Mm hmm.
00:21:05.976 --> 00:21:31.959
Another silly thing but it kind of gets us sometimes is Making sure the details are legible and large enough on your plans., it sounds like such a basic thing, but in the field the guys are working and if you have it written in like eight point font or six point font on a piece of paper, you know, they're literally in the field, with the plans up to their eyes, just trying to think what, does this say?
00:21:31.969 --> 00:21:41.699
And we've actually had our field staff sometimes call the office and say, Hey, can you look on the computer below this up and tell me what does this actually say?
00:21:41.959 --> 00:21:50.034
And then we'll write it in, you know, below the, microscopic type font that's on the plans
00:21:50.298 --> 00:21:51.469
So legible is good.
00:21:52.749 --> 00:22:00.489
Yeah, you know, one or two of our field guys are a little long in the tooth and they probably need readers, but they're not doing construction with their readers on.
00:22:00.538 --> 00:22:01.828
So they can't read the drawings.
00:22:02.138 --> 00:22:03.318
So yeah, that happens.
00:22:03.378 --> 00:22:11.019
Speaking of sizes architectural documents are frequently two feet by three feet, those giant rolls of paper that are on site.
00:22:11.558 --> 00:22:17.459
The documents that we tended to provide we made them so they could be printed on eight and a half by 11 paper.
00:22:17.459 --> 00:22:18.398
That was the intention.
00:22:18.778 --> 00:22:21.769
I never asked you guys, would you have preferred that they were larger?
00:22:21.769 --> 00:22:23.098
What would you like from designers?
00:22:23.743 --> 00:22:27.163
I think that our field staff prefers it in a larger format.
00:22:27.163 --> 00:22:38.834
One of our project managers actually prints everything on 11 by 17 paper for the field staff regardless of what size anyone made it.
00:22:39.084 --> 00:22:40.534
And he just blows it up.
00:22:40.854 --> 00:22:41.854
So for us.
00:22:42.298 --> 00:22:43.368
It's larger is better.
00:22:43.378 --> 00:22:48.868
It's just easier to see all of the type fonts, the little details, things like that.
00:22:49.534 --> 00:22:51.513
And harder to lose on a big job site.
00:22:51.513 --> 00:22:52.253
Correct.
00:22:52.953 --> 00:22:54.923
And full size printing is expensive too.
00:22:55.084 --> 00:23:02.903
We've had projects, just little residential construction remodeling where we can spend 300 on printing full size drawing packages.
00:23:03.173 --> 00:23:03.713
Or more.
00:23:03.723 --> 00:23:12.834
It's really expensive and usually we need a permit set and then there's construction documents and we need, You know, one or two or three copies of the set.
00:23:12.834 --> 00:23:15.364
So the project manager has one and the field guys have one.
00:23:15.364 --> 00:23:19.824
And then we've got an extra one for when somebody takes off with the drawings in their truck.
00:23:20.824 --> 00:23:23.273
So floor plans, we need our existing floor plan.
00:23:23.273 --> 00:23:24.574
We need our new floor plan.
00:23:24.864 --> 00:23:27.453
Let's get to the juicy stuff, the elevations.
00:23:27.453 --> 00:23:30.973
What do you want to see on there and what's often missing?
00:23:32.663 --> 00:23:37.673
Well, dimensions you'd think that'd be pretty obvious, but a lot of times we, we don't have any dimensions.
00:23:38.689 --> 00:23:53.419
The designer will be very proud of the picture that they show and it looks really nice, but we can't build it if we don't know exactly where the soap niche is going to be, and how high to put the towel bar, and where should we set the thermostat, and you know, your drawings spell out all of that.
00:23:53.449 --> 00:23:58.808
What, the height of every shelf, where to put that art tile inlay it's all there.
00:23:58.858 --> 00:24:01.999
Again, our guys don't want to, they don't want to guess.
00:24:02.739 --> 00:24:05.788
They don't want to make mistakes and they don't like to have to stop to ask questions.
00:24:05.788 --> 00:24:07.888
And most of them don't like meetings either.
00:24:08.608 --> 00:24:09.348
They just want to build.
00:24:09.558 --> 00:24:15.338
And it's in everybody's best interest for them to just be able to build efficiently and not have to stop and ask questions.
00:24:16.044 --> 00:24:29.291
To have this information available at the rough in phase where we're doing our blocking the blocking that we try to provide behind all of these things so that eventually you're You know, toilet paper holder isn't ripped off the wall by your kid.
00:24:29.602 --> 00:24:31.432
You know, we try to help blocking behind all of that.
00:24:31.432 --> 00:24:37.112
If the plumber is standing there and saying, lady, how high do you want your shower handle and how high do you want your showerhead?
00:24:38.041 --> 00:24:43.481
The homeowner is just like, I, I don't know, you know, like what do you do?
00:24:43.731 --> 00:24:44.951
The plumber has to say.
00:24:45.196 --> 00:24:48.586
Well, under normal circumstances, this is what we do.
00:24:48.997 --> 00:24:52.636
It happens so often that those heights aren't shown.
00:24:52.836 --> 00:24:59.227
The heights for light switches, for example how far apart sconces are going to be things like that.
00:24:59.267 --> 00:25:00.527
We need that information.
00:25:00.527 --> 00:25:04.277
When our plumbers doing their rough in, When we start the project, basically.
00:25:05.221 --> 00:25:21.432
mean, you know, you're preaching to the choir right here and designers, this is also to your benefit because when things are left to the electrician's decision about where the thermostat should go, I guarantee you it's going to go right where you planned to place a piece of art.
00:25:21.692 --> 00:25:23.241
Like, it's just Murphy's law.
00:25:23.821 --> 00:25:35.442
I don't know what plumbers and electricians think is standard, but it's not what I think is standard you're just leaving everything to chance when you don't get detailed.
00:25:35.451 --> 00:25:37.201
And that's when you end up with things like.
00:25:37.826 --> 00:25:42.797
Light switches that are half in the tile backsplash, half out of the tile backsplash.
00:25:43.267 --> 00:25:49.156
And those are the kinds of details that people deserve to get right because they invested in a designer in the first place.
00:25:50.751 --> 00:25:56.395
I uh, project manages one of the designs that you created it was a kitchen remodel and an upstairs bathroom.
00:25:56.695 --> 00:26:05.976
And I remember going into the upstairs bathroom after our electrician had been there and the thermostat for the floor heat wasn't in the spot that you had spec'd it.
00:26:06.425 --> 00:26:10.972
I remember asking the electrician, like, why, why did you do this?
00:26:10.982 --> 00:26:14.462
So it's written in the plans to be not as you did it.
00:26:14.462 --> 00:26:19.032
And he said, Oh, well I just thought it worked out better the other way.
00:26:20.012 --> 00:26:22.623
And I was just like, are you kidding me?
00:26:23.143 --> 00:26:26.762
I was like, no, the client wants it as Rebecca laid it out.
00:26:27.032 --> 00:26:28.153
Please fix it.
00:26:28.423 --> 00:26:30.609
It was just such a head scratcher, right?
00:26:31.442 --> 00:26:37.303
But seriously if you leave it up to the electrician, you just don't know what you're gonna get.
00:26:37.303 --> 00:26:45.583
Whatever this person thinks is, is the best thing is they're just gonna do it that way and it might be the strangest thing you've ever seen.
00:26:45.673 --> 00:26:52.242
And I'm so glad you said that because what we just said there was, we, we did document it.
00:26:52.252 --> 00:26:53.663
We did decide it.
00:26:53.732 --> 00:26:57.857
And then a rogue the sub decided, I liked it better over here.
00:26:58.268 --> 00:27:06.587
If it's not documented, then you get that finger pointing who's now responsible for the time and money to make it right.
00:27:06.617 --> 00:27:11.057
And in this case, you were able to say to your sub dude, that's on you.
00:27:11.087 --> 00:27:11.708
Go fix it
00:27:13.113 --> 00:27:16.893
And we were able to fix it in the rough in phase before we got
00:27:17.127 --> 00:27:18.127
when it's cheap.
00:27:19.313 --> 00:27:19.633
right?
00:27:20.262 --> 00:27:20.623
right?
00:27:20.762 --> 00:27:26.323
I mean, it's horrible to have discovered these problems after the entire bathroom's done.
00:27:26.593 --> 00:27:30.242
Your client walks in to like change the floor heat and they're like, what the heck?
00:27:30.262 --> 00:27:33.343
Why is the floor heat thermostat in this location?
00:27:33.393 --> 00:27:53.603
And then you have to fix it when your beautiful bathroom has been completely finished and all of a sudden you're opening sheetrock, removing tile, changing things, then it's so easy in the rough in phase and your documentation allowed me to ask my, my electrician, why in the world is it this way?
00:27:53.903 --> 00:28:01.212
And I could easily see that as I went through and checked after rough in that something wasn't in the right location.
00:28:01.347 --> 00:28:01.867
I love it.
00:28:01.867 --> 00:28:02.998
Chris, did you want to add something?
00:28:04.032 --> 00:28:17.462
Yeah, the other part of that I was going to say is that when we're having to stop a lot and ask our clients for clarification or decisions is they start to suffer from decision fatigue and that builds as the project goes along.
00:28:17.962 --> 00:28:24.913
They're already tired because they're living in half their basement and everything's dirty and they're writing checks constantly.
00:28:25.461 --> 00:28:30.768
If they also are having to make decisions throughout the project that that really adds to their fatigue.
00:28:31.018 --> 00:28:32.847
Ideally we see the decisions coming.
00:28:33.292 --> 00:28:41.383
You know, by next Wednesday, we need to get your blessing on the lighting layout, or, where we're going to put the sconce, but a lot of times we don't see those coming.
00:28:41.643 --> 00:28:44.512
So it's like, stop, stop what you're doing.
00:28:44.512 --> 00:28:45.972
We got to ask the client real quick.
00:28:46.593 --> 00:28:51.083
Thankfully now in the post COVID world, a lot of times our clients are home.
00:28:51.083 --> 00:29:06.093
So it's, it is easier now, but eventually our clients start to kind of just wear out on making what can feel like really critical decisions that they're not necessarily feeling like they're qualified to make especially during utility rough in where we're.
00:29:06.377 --> 00:29:15.198
Getting all of that stuff into the wall before we put up sheet rock, and it's your last chance to get anything in the right place easily.
00:29:15.458 --> 00:29:26.648
So I always tell our clients in advance of project starts like this is utility rough and tends to be the time of the project where you're really are going to be pretty worn out, but less so in your projects, because they just don't have to.
00:29:26.648 --> 00:29:28.067
They don't have to make all those decisions because generally everything's already spelled out in the drawings.
00:29:28.067 --> 00:29:33.048
So I always tell our clients in advance of project starts like this is utility rough and tends to be the time of the project where you're really are going to be pretty worn out, but less so in your projects, because generally everything's already spelled out in the drawings.
00:29:33.048 --> 00:29:45.528
That was a big part of why we made our files as detailed as we did, because we don't want the client trying to figure out what cabinet hardware they want right when they're exhausted by the process.
00:29:45.617 --> 00:29:56.567
Designers if you want your clients to make bolder decisions that cost a little bit more money, The time not to do that is when they're bleeding money in the middle of the project.
00:29:56.567 --> 00:30:00.258
You want to do that up front when they're still excited about things.
00:30:01.048 --> 00:30:03.678
If you wait, they're going to be like, what's cheap?
00:30:03.708 --> 00:30:04.617
What's available?
00:30:04.617 --> 00:30:05.488
I don't care.
00:30:05.528 --> 00:30:11.127
Even if later they're going to look back and be like, I wish I'd given that a little bit more time and thought,
00:30:11.288 --> 00:30:12.847
check fatigue is a real thing.
00:30:13.219 --> 00:30:25.978
As we get to the end of our projects and someone has written us 450, 000 of checks and then we're at the last 10%, it's time to install those beautiful finishes.
00:30:26.298 --> 00:30:28.508
And they're like, Oh my God, are you kidding me?
00:30:28.508 --> 00:30:33.877
You want me to install a, you know, 5, 000 light fixture?
00:30:33.978 --> 00:30:34.998
No way.
00:30:34.998 --> 00:30:41.087
I have just written 450, 000 dollars worth of checks and I am done.
00:30:41.407 --> 00:30:50.998
And we see that literally almost on every project we work on because it is really expensive and check fatigue, it happens to almost everybody.
00:30:51.413 --> 00:30:52.623
Really good points.
00:30:52.873 --> 00:30:53.173
Okay.
00:30:53.173 --> 00:30:55.593
So we've got our floor plans.
00:30:55.633 --> 00:30:57.393
We've got our elevations.
00:30:57.423 --> 00:30:59.133
Anything else you want to say about elevations?
00:31:00.077 --> 00:31:08.117
I think that they're one of the most important and left out pieces of most designers documentation.
00:31:08.468 --> 00:31:18.028
And where you think it might be overkill as a designer, it's not overkill for example bathrooms are very complicated.
00:31:18.048 --> 00:31:21.678
A lot of clients don't realize how complicated a bathroom is.
00:31:22.077 --> 00:31:26.637
Owners come to us without a designer and say, well, I'm just installing a bathroom.
00:31:26.688 --> 00:31:28.157
I just want a bathroom.
00:31:28.167 --> 00:31:29.488
How hard could that be?
00:31:29.667 --> 00:31:35.228
And we actually tell them, this is actually the most difficult project because there are so many details in it.
00:31:35.798 --> 00:32:00.248
The more information that you can provide as far as measurements go, as far as your tile layout, like how is that going to look like, what are those transition elements between different pieces, you know, are you going to have bullnose, are you going to use jolly schluder, I mean, what are your transitions, how is one piece going to work with the next are you going to have an elaborate glass shower door that has a lot of different components?
00:32:00.498 --> 00:32:08.657
That all needs to be figured out before we order the shower door because once it has been ordered and manufactured, you basically cannot change it.
00:32:09.077 --> 00:32:11.367
So all of those elevations.
00:32:11.903 --> 00:32:17.833
Help our builders build the right thing and have our clients get what they expected.
00:32:19.238 --> 00:32:21.067
Yes, exactly.
00:32:21.587 --> 00:32:30.958
Now one of the things I tried to do, and I'm curious if it mattered to you guys, I tried to avoid on the elevations, paragraphs of text.
00:32:31.038 --> 00:32:36.087
I'm assuming that that is important because I have found contractors don't like to read
00:32:37.022 --> 00:32:39.093
That goes back to the ADHD thing a little bit.
00:32:39.343 --> 00:32:43.323
Exactly like you're saying nobody on site is wanting to read a paragraph.
00:32:43.353 --> 00:32:47.962
They're wanting to quickly reference the plans and then go back to building.
00:32:48.242 --> 00:32:52.073
Especially if your design changes as you are going along.
00:32:52.492 --> 00:32:57.173
Calling out note to contractor in bold type and then you have a note.
00:32:57.913 --> 00:33:09.542
Maybe you released an updated set of drawings and you've called out components that are different somehow highlight those with a bubble or whatever you're going to choose so that the builder can see.
00:33:09.823 --> 00:33:14.563
Oh, this is a design change from what we had previously.
00:33:14.752 --> 00:33:16.972
Let's pay attention to these important elements.
00:33:17.192 --> 00:33:19.032
Make it as scannable as possible.
00:33:19.913 --> 00:33:24.643
Okay, now the next thing I always included, I included more for the homeowners.
00:33:24.682 --> 00:33:30.982
I don't know if you actually liked having it, which is the 3D renderings, and then all of the pictures.
00:33:31.022 --> 00:33:31.863
Yes, exactly.
00:33:31.863 --> 00:33:33.492
He's pointing at one right now on the screen.
00:33:33.903 --> 00:33:39.603
So all the renderings of the room were separate from the pictures of the objects and materials.
00:33:39.613 --> 00:33:43.123
How did you guys feel about having those 3D renderings as the contractor?
00:33:43.853 --> 00:33:47.163
I don't know that the guys pay too much attention to those.
00:33:47.873 --> 00:33:53.522
They get all the information that they need to build off the floor plans, the elevations, and the specs.
00:33:53.853 --> 00:34:03.843
As you said, the renderings are really there for the homeowner to be able to see what it's actually going to look like it's hard to get the vibe of the space from the floor plan and the elevations.
00:34:04.123 --> 00:34:05.153
It's the recipe.
00:34:05.232 --> 00:34:10.032
It tells you how to make the cake, but it doesn't really let you know what it's going to taste like.
00:34:10.202 --> 00:34:11.842
That's what the renderings do.
00:34:11.922 --> 00:34:13.143
They can actually really see it.
00:34:13.463 --> 00:34:27.432
If we were to skip something from the contractor's perspective, never skip the floor plans, never skip the elevations, the renderings could be seen as optional, but the renderings will never be a substitute.
00:34:27.882 --> 00:34:29.922
For floor plans and elevations.
00:34:30.103 --> 00:34:30.753
Is that correct?
00:34:32.108 --> 00:34:32.768
That's correct.
00:34:32.788 --> 00:34:33.228
Yeah,
00:34:33.626 --> 00:34:35.806
Now, what about those material images?
00:34:35.806 --> 00:34:40.795
We tried to have pictures of the tile, pictures of the faucets, pictures of the cabinets.
00:34:40.846 --> 00:34:42.385
Was that important for you guys?
00:34:43.800 --> 00:34:58.420
Yes, that's very important because as we are working with our trade partners or subcontractors or material providers we are able to show them exactly what is going to be installed.
00:34:58.780 --> 00:35:03.590
And so they're able to give us more accurate estimates before we start the project.
00:35:03.681 --> 00:35:08.400
And they're able to get a sense of where we're going sometimes.
00:35:09.460 --> 00:35:20.960
Like for example, this project that Chris is working on that you developed back in 2020, the materials may not be available any longer, but we can say, Oh, okay, well, this is what we're going after, right?
00:35:21.420 --> 00:35:29.481
We're going to have black hex tile in this size, so we can find a substitute or work with the homeowner to find a substitute.
00:35:29.771 --> 00:35:33.731
This type of flooring might not exactly be available anymore, but no problem.
00:35:33.931 --> 00:35:40.251
You know, we're going to be able to find something that looks very similar to that and make a substitution.
00:35:40.490 --> 00:35:43.431
I hadn't even thought about that as a benefit, because you're right.
00:35:43.751 --> 00:35:49.061
Frequently, projects end up being You know, being priced out at more than a client expected.
00:35:49.061 --> 00:35:51.010
They need to save up for a little bit longer.
00:35:51.280 --> 00:35:53.481
Things will absolutely go out of stock.
00:35:53.840 --> 00:35:56.391
And so those pictures aren't just there for reference.
00:35:56.630 --> 00:36:01.121
The reason they're there is so that if somebody gets a box of tile, it should look like the picture.
00:36:01.621 --> 00:36:11.231
It just verify, but there's that added benefit of if things have gone out of stock, they're easier to resource and keep the integrity of the design.
00:36:11.951 --> 00:36:12.751
Absolutely,
00:36:13.262 --> 00:36:15.172
well, that leads us to the part that.
00:36:15.876 --> 00:36:16.556
Well, okay.
00:36:16.887 --> 00:36:29.347
As a designer, I'm not sure if the elevations or the materials specification list took longer to get right, because that's where all the details are is on the elevations and then on the specification list.
00:36:29.416 --> 00:36:32.677
The specification list for us, we call it the materials list.
00:36:33.007 --> 00:36:42.867
It's the item we're sourcing, like a faucet, kitchen faucet, and then it will be the description of that faucet, brand, finish, size, quantity, if it's more than one.
00:36:43.492 --> 00:37:07.811
We always included our link because we never purchased anything for our clients, so we were always happy to share the purchasing information and we always shared the retail cost, which our intent was that that would mean that the client would know what they would spend if they bought it themselves or the contractor would know that they can still get their discount and that the client should expect that to be MSRP.
00:37:08.967 --> 00:37:10.327
So that was our way of going about it.
00:37:10.367 --> 00:37:16.036
I know that specification lists can look very, very different across designers.
00:37:17.306 --> 00:37:19.117
us your thoughts on specification lists.
00:37:20.277 --> 00:37:34.005
Well, me, as a project manager on your projects, I really appreciated having the list while we were actually building because I wanted to make sure that We had on hand all of the materials before we got to that scope of work.
00:37:34.295 --> 00:37:53.572
So, I would use your list to checkmark, like, okay, yes, we do have the faucet, we do have the drain, we do have the, kitchen knobs It was super handy to have this list available and to make sure that we had all the products that we needed as we were getting to that phase of the scope.
00:37:54.056 --> 00:37:57.067
And how does it compare to what you get from other designers?
00:37:57.067 --> 00:38:02.106
Is this a fairly consistent thing that you're given or are you frequently missing important information?
00:38:02.246 --> 00:38:02.347
I
00:38:04.731 --> 00:38:07.802
It's, it's never as clear and detailed as this.
00:38:07.802 --> 00:38:12.711
I also just like that it's attached to the drawing set so that you always know that you're working on the correct one.
00:38:12.916 --> 00:38:14.492
I want to call that out for a second.
00:38:14.543 --> 00:38:16.072
Our files were one.
00:38:16.682 --> 00:38:18.333
Very long pdf.
00:38:18.983 --> 00:38:30.592
We very purposefully found a way to make sure that every single piece of information would be in one document to avoid confusion about, which specification list went with which document.
00:38:30.862 --> 00:38:32.472
Which floor plans.
00:38:32.552 --> 00:38:35.893
That's how you lead to those miscommunications that we're trying to avoid.
00:38:36.652 --> 00:38:40.373
Yeah, yeah, where you're working off the wrong list this makes it really clear.
00:38:40.373 --> 00:38:43.603
And then within that list, you have it broken down by room.
00:38:44.643 --> 00:38:56.253
Which is really nice, and you know, when I'm doing, when I'm writing my estimates it's wonderful because, as Lisa was saying, during construction where she can go through and check everything off, I do the same thing on my estimates.
00:38:56.753 --> 00:39:04.722
I scribble all over this, and some of it is rugs and sofas, and I don't have to worry about that, but you really did a good job capturing everything.
00:39:05.603 --> 00:39:08.663
Even capturing out the stuff that is contractor cost.
00:39:08.793 --> 00:39:22.242
We're gonna have a custom cabinet in this corner over here, and that's gonna come out of the contractor's custom shop, and you as the designer don't know what that's gonna cost, but you've indicated that on here, and now I know that that's something that I need to go after.
00:39:22.353 --> 00:39:23.503
So yeah.
00:39:24.313 --> 00:39:27.768
Having it all in one place, on one document, It's so nice.
00:39:28.134 --> 00:39:31.313
I would follow that up by saying for us at rain cap.
00:39:31.353 --> 00:39:38.722
We work on multiple projects at the same time that means that each project might have a different designer or architect on it.
00:39:38.936 --> 00:39:50.193
when everybody does something a little bit differently As the project manager or the builder on site, you have to think to yourself, now, where does this designer put their specs?
00:39:50.503 --> 00:39:51.612
Where, where are those?
00:39:51.672 --> 00:39:54.802
Is that in Google Sheets or did they email it to me?
00:39:54.813 --> 00:39:58.992
Ideally like make this as foolproof for your builder as possible.
00:39:59.152 --> 00:40:03.193
You don't want your builder to be like, Oh, my gosh, where do I find that again?
00:40:03.362 --> 00:40:05.032
Where was that thing?
00:40:05.543 --> 00:40:06.333
Oh, I can't.
00:40:06.413 --> 00:40:07.293
I can't remember.
00:40:07.293 --> 00:40:08.103
Never mind.
00:40:08.603 --> 00:40:15.523
When you're working on multiple projects at the same time, and everybody does something a little bit differently trying to figure out, like, where do I go to find this?
00:40:15.722 --> 00:40:19.326
Can sometimes feel like a big hurdle in the building process.
00:40:19.492 --> 00:40:20.041
Of course.
00:40:20.315 --> 00:40:23.186
Yeah, when you have full size drawings on the on the job site.
00:40:23.766 --> 00:40:27.585
Oftentimes that Excel spreadsheet isn't going to end up out there, too.
00:40:27.655 --> 00:40:31.826
Or if it does, it's going to end up lost in a stack of permits or something else.
00:40:32.235 --> 00:40:32.585
Yeah.
00:40:33.436 --> 00:40:37.099
So that brings us to the end of the file, but not to the end of the process.
00:40:37.920 --> 00:40:50.530
After the build is done, I've been really surprised over the years at how many times clients have referenced back to those files because they had a warranty issue and they needed to figure out, which maker was the maker of something.
00:40:51.030 --> 00:41:01.181
I have a client that I'm working with right now who doesn't have any documentation for her home from her designer, and it's really put her into a pickle with some things she needs to fix.
00:41:01.181 --> 00:41:08.400
My question is, have you guys, over 17 years of working together, have you referenced back to these files?
00:41:08.420 --> 00:41:13.411
Is that something that's also happening within your side or is it pretty much closed when the project's done?
00:41:14.440 --> 00:41:18.021
From the builder point of view Warranty things happen.
00:41:18.061 --> 00:41:19.570
That's part of the process.
00:41:20.027 --> 00:41:22.367
Stuff just isn't built like it used to.
00:41:23.056 --> 00:41:36.148
They sell these lighting fixtures where they integrate the bulbs into the fixtures with the Idea that they're gonna last a certain amount of lighting hours and it might be like 5, 000 lighting hours, right?
00:41:36.518 --> 00:41:39.798
Well, unfortunately, is actually not the bulb itself.
00:41:40.148 --> 00:41:43.088
It's the electrical components that have issues.
00:41:43.358 --> 00:41:45.509
One of the projects that we worked with you on.
00:41:45.648 --> 00:41:50.648
Just recently, one of their lights had a manufacturing flaw.
00:41:50.648 --> 00:41:51.489
It just stopped working.
00:41:51.768 --> 00:41:53.838
So we did reference your files.
00:41:53.838 --> 00:41:54.789
We ordered a new one.
00:41:55.369 --> 00:41:55.998
And then.
00:41:56.353 --> 00:42:00.983
Wouldn't you know, three months later, the other sconce also stopped working.
00:42:02.123 --> 00:42:06.324
Yeah, so yes, we did use that for a warranty item.
00:42:06.570 --> 00:42:10.998
Things go wrong, things have to get fixed, it's super important to have documentation.
00:42:11.217 --> 00:42:12.157
Absolutely.
00:42:12.583 --> 00:42:13.833
Anything you want to add to that, Chris?
00:42:14.293 --> 00:42:15.447
No, I think she covered it.
00:42:16.487 --> 00:42:22.557
So big picture, what do you really want people to take away from this conversation?
00:42:23.257 --> 00:42:32.141
Have as much of your detail and your design done prior to having your contractor bid or start the job.
00:42:32.260 --> 00:42:35.807
Building is a messy job it can be very complicated.
00:42:36.027 --> 00:42:41.311
We've started building when the design wasn't completely thought through or fleshed out.
00:42:41.320 --> 00:42:47.552
Those projects are inevitably not as successful from a cost perspective, from a process perspective.
00:42:47.762 --> 00:42:53.490
The more you can have everything done in advance, before we even start the process, the better.
00:42:53.920 --> 00:43:09.331
In my experience, it's actually even more true on the smaller projects because good documentation and having chosen everything, ordered everything, having it all on site, can be the difference between a three week bathroom remodel and a three month bathroom remodel.
00:43:09.690 --> 00:43:29.530
So projects that don't have to take a long time will, if you don't do this work and then the big projects, it's so hard to get your hands around how much that big project is going to cost leaving all of the details loose just makes it thousand times more impossible.
00:43:29.530 --> 00:43:30.760
That's such a great point.
00:43:31.067 --> 00:43:36.117
The smaller projects, those are the ones where you have to have everything dialed in in advance.
00:43:36.726 --> 00:43:38.217
Do you have to have the materials on site?
00:43:38.217 --> 00:43:39.876
You have to have your plumber scheduled.
00:43:39.936 --> 00:43:44.693
You have to have all that stuff figured out before it starts because it's going to go quickly.
00:43:45.353 --> 00:43:53.088
When we're doing a big addition or building a a new house, it's We're going to be in dirt and concrete for, possibly months.
00:43:53.768 --> 00:43:56.724
In the meantime, someone can be figuring out what the tile is.
00:43:56.724 --> 00:44:03.740
We don't have to worry about that yet, but if it's a bathroom model we need to know everything before, before we get going so we can get it all scheduled
00:44:03.840 --> 00:44:04.231
Yeah.
00:44:05.141 --> 00:44:13.550
On those bigger projects, the big things are of course, deciding the windows and the doors, because those will have a four to five month lead time.
00:44:13.831 --> 00:44:18.400
And there's so many aesthetic choices that have to be made for the doors and windows.
00:44:19.221 --> 00:44:25.891
So to me, I'm like, how could I even make those decisions without having fleshed out to the design, at least some part of the way.
00:44:26.550 --> 00:44:39.840
I'm curious, given that this is such a newbie mistake, how often are you still seeing when you get to the rough in phase that you don't have valves chosen for the bathroom fixtures?
00:44:39.940 --> 00:44:48.150
Things have gotten so complicated with showers because it's not just a handle and a shower head anymore.
00:44:48.590 --> 00:44:53.490
We have problems with the specs not actually working together.
00:44:53.510 --> 00:44:56.231
I would say this happens about 25 percent of the time.
00:44:56.481 --> 00:45:06.130
Our plumber gets on site and he says, Hey, this valve, it's like a, a one way valve, or it's not going to support your wand and your, shower head.
00:45:06.416 --> 00:45:09.175
Plus the other things that you might have going on.
00:45:09.445 --> 00:45:12.666
You have your plumber standing there and he says, lady, Hey, I'm leaving.
00:45:13.085 --> 00:45:15.255
I'll come back with my next opening.
00:45:15.505 --> 00:45:18.335
We don't want our plumber to walk off the job site, right?
00:45:18.335 --> 00:45:21.195
Because he might not have an opening for a couple of weeks.
00:45:21.655 --> 00:45:28.126
So, making sure that you have the products that actually all work together.
00:45:28.155 --> 00:45:32.556
And this happens a lot with shower valves more than any other area.
00:45:33.425 --> 00:45:35.806
Just because everything's gotten so much more complicated.
00:45:35.806 --> 00:45:37.706
There's so many more components that work together.
00:45:37.951 --> 00:45:56.396
Yeah, and that plumber going off site isn't just the plumber that has a ripple effect on all of the other schedules because no other sub can do their work until he's done his and that actually takes us back to the elevations to if you've got these complicated plumbing systems, which is Seems to be the standard now for most remodels.
00:45:57.556 --> 00:46:00.666
You can't, for example, run a pipe through a shower niche.
00:46:00.686 --> 00:46:04.115
You've got to think about where are the fixtures going to be placed?
00:46:04.146 --> 00:46:05.996
Where's the niche going to be framed in?
00:46:06.396 --> 00:46:08.016
Where are the valves going to be placed?
00:46:08.036 --> 00:46:09.076
The on And off valves?
00:46:09.576 --> 00:46:16.306
Because even that can be really personalized because you might not want to reach around into this massive shower to turn on the water.
00:46:16.306 --> 00:46:17.456
Then you get drenched.
00:46:18.045 --> 00:46:22.255
But moving it to the entry of the shower is not normal.
00:46:22.670 --> 00:46:24.771
Your plumber is not going to think to do that.
00:46:24.791 --> 00:46:27.650
It has to be on elevations.
00:46:28.976 --> 00:46:41.675
A completely different subject that comes to mind is the designer and the client don't seem to have a clear understanding of what type of support is going to happen during building.
00:46:41.996 --> 00:46:56.273
We do remodels of old houses and so often when we open the walls, surprise! Things are crazy in the walls they might have been remodeled horribly at one time, or the structure inside the walls isn't to modern building code.
00:46:56.543 --> 00:47:09.588
The design might have to change based on the existing conditions, we have it happen where The owner is sometimes surprised that onsite support during building isn't a part of their contract.
00:47:09.925 --> 00:47:26.152
We've done our demo, we're looking at the walls and we need to have a bit of a design change based on what we've actually run into and the designer says, well, you didn't contract with me to do on site building support.
00:47:26.663 --> 00:47:32.492
Now as the homeowner and the builder, we're standing there going, oh, okay, well, I guess we're going to figure this out ourselves.
00:47:32.911 --> 00:47:37.931
It affects the project going down the road where we might make changes that affect different things.
00:47:37.992 --> 00:47:46.121
All of a sudden, there's a cascading series of changes that happen because we had to just figure it out on our own.
00:47:46.152 --> 00:47:50.532
And that's not our area of expertise, nor the homeowner's area of expertise.
00:47:50.597 --> 00:47:53.567
Not all contractors are going to be thoughtful.
00:47:54.311 --> 00:47:57.601
About the change that they're making on your behalf.
00:47:57.661 --> 00:48:01.601
And even if they are trying to be thoughtful, this isn't their area of expertise.
00:48:02.302 --> 00:48:04.811
I think it was actually in a project I did with you guys.
00:48:05.822 --> 00:48:10.822
The sewer stack was exactly where the door to the bathroom was supposed to go.
00:48:11.371 --> 00:48:16.547
And for people who are listening, you don't know, our designs were always sold as design only.
00:48:16.567 --> 00:48:18.246
We did not do any ordering.
00:48:18.536 --> 00:48:21.967
We did not do any on site project management or anything.
00:48:22.297 --> 00:48:31.427
But when I got that call, I do consider it my professional responsibility to have provided a design that can be executed.
00:48:32.177 --> 00:48:34.447
Obviously, every situation is a little bit different.
00:48:34.456 --> 00:48:41.597
But in that particular one, of course, I got in my car, I showed up on site, I reworked the design, and the day was saved.
00:48:41.686 --> 00:48:44.137
I do see that as our job as designers.
00:48:44.186 --> 00:48:50.356
And if that's happening a lot for you as a designer, number one, Are you doing enough planning in the first place?
00:48:50.896 --> 00:48:56.516
And number two, look at your pricing, just price it in so that you aren't leaving your clients hanging.
00:48:57.106 --> 00:49:09.067
The third part is, I was always really clear on my files is on the cover sheet that if y'all need to make changes, I'm not the kind of designer who gets mad, like you don't need my permission.
00:49:09.626 --> 00:49:14.166
A lot of designers are very specific and strict.
00:49:14.416 --> 00:49:18.697
Any change must go through them, which is totally fine.
00:49:18.706 --> 00:49:25.387
You know, that helps keep the integrity of the design, but it goes back to the fact that we do not have any standards in our industry.
00:49:25.891 --> 00:49:31.972
And so it's extremely important to make it clear, if this happens, then what happens?
00:49:32.251 --> 00:49:34.211
Who's responsible for what?
00:49:34.612 --> 00:49:39.731
So that there aren't questions when you're in the middle of that stressful situation.
00:49:40.547 --> 00:49:41.876
And no one's perfect.
00:49:42.117 --> 00:49:46.786
Not any designer is going to foresee every single possibility.
00:49:46.996 --> 00:49:50.077
The builders aren't going to be perfect and the homeowners aren't perfect.
00:49:50.086 --> 00:50:08.641
So I appreciated Rebecca when I worked with you, how responsive you were when we got to Situations where we had, say, a complicated outlet coming out of very unusual tile with an unusual profile that didn't make it easy for us to,
00:50:08.862 --> 00:50:09.942
I remember that one.
00:50:10.302 --> 00:50:10.652
right.
00:50:10.751 --> 00:50:14.431
We couldn't just put the outlet on the wall because the tile had a very unusual profile.
00:50:14.552 --> 00:50:15.652
interesting relief.
00:50:16.001 --> 00:50:21.711
And you worked with me to come up with an idea that we actually had to have manufactured.
00:50:22.322 --> 00:50:34.402
I really appreciated how responsive you were and how we worked together to come up with a solution that worked really well for this unusual circumstance that none of us had foreseen.
00:50:35.762 --> 00:50:36.992
to relationships.
00:50:37.041 --> 00:50:40.961
You know, I'm all for making sure that we are paid for our time.
00:50:41.561 --> 00:50:46.911
But it's You guys and I, we worked together for almost 20 years.
00:50:47.431 --> 00:50:50.862
Some of those choices that I made weren't made on the client's behalf.
00:50:50.882 --> 00:50:56.782
They were made for our relationship to try and make your job go well, make the project go well.
00:50:57.032 --> 00:51:00.215
So sometimes Technically there is some lost money.
00:51:00.244 --> 00:51:04.855
In these situations, but you've got to keep an eye on what the long game is.
00:51:05.485 --> 00:51:09.965
You know, I created these very detailed files for the benefit of myself and for the clients.
00:51:10.414 --> 00:51:14.255
I didn't want the stress of feeling like I'd missed a detail.
00:51:15.135 --> 00:51:24.855
I was surprised to find contractors like yourselves appreciated them so much that ultimately my best referral source was my contractors.
00:51:25.835 --> 00:51:26.985
Not even my clients.
00:51:26.985 --> 00:51:35.067
They were great, but it's the contractors that really Kept my business going, and that's all because of the things we're talking about right here.
00:51:36.041 --> 00:51:36.742
It's a great point.
00:51:37.192 --> 00:51:41.177
Lot of the time these projects start with with a phone call to us.
00:51:41.746 --> 00:51:43.927
you remodeled my colleague's bathroom.
00:51:44.146 --> 00:51:45.567
They said you did a great job.
00:51:45.577 --> 00:51:47.047
Can you come take a look at mine?
00:51:47.347 --> 00:51:48.217
Yeah, sure.
00:51:48.246 --> 00:51:48.847
I can do that.
00:51:48.896 --> 00:51:49.686
Do you have a design?
00:51:49.706 --> 00:51:50.496
Do you have drawings?
00:51:50.496 --> 00:51:55.661
Do you have a No, no, we're just kind of the first thing I want to do is, get a design.
00:51:55.661 --> 00:52:00.922
So then we're recommending designers or architects depending on the situation.
00:52:00.922 --> 00:52:01.601
So you bet.
00:52:01.652 --> 00:52:01.952
Yeah.
00:52:01.952 --> 00:52:03.722
We sent a ton of projects your way.
00:52:04.132 --> 00:52:05.992
And you sent a ton of projects our way.
00:52:05.992 --> 00:52:08.391
It was a, it was a great relationship that way.
00:52:08.536 --> 00:52:08.876
Yeah.
00:52:09.123 --> 00:52:15.733
You want as a designer to have a successful project for your homeowner and for your builder.
00:52:15.943 --> 00:52:39.893
If you aren't responsive to your builder or your homeowner, once the project has actually started, whether or not you have contracted to have that level of support in the project, as a builder, if you feel like your designer has left you hanging out to dry, we have lots of people who come to us and need a designer and we would do tons of referrals.
00:52:41.099 --> 00:52:57.489
If we don't get good support from our designer, that person isn't going to be tops on our list for referrals when we're on the job site having to do the head scratching and figure out this design isn't executable because we've ran into this problem now we have to figure it out on our own.
00:52:57.818 --> 00:53:00.248
It seems like from a business owner perspective.
00:53:00.838 --> 00:53:02.469
That's kind of a silly choice, right?
00:53:02.469 --> 00:53:03.768
You're not playing the long game.
00:53:03.768 --> 00:53:12.009
As you said, it may be a project that you are unable to photograph because it is no longer something that represents your design vision.
00:53:12.418 --> 00:53:14.829
Maybe your client isn't going to give you a referral.
00:53:14.829 --> 00:53:17.559
Your builder isn't going to give you a referral.
00:53:17.858 --> 00:53:18.469
so yeah.
00:53:18.898 --> 00:53:23.778
Don't cut off your nose to spite your face when you are already so invested.
00:53:24.079 --> 00:53:32.159
This client has paid you a substantial amount of money and then the very last interaction with your client is going to be a bad taste in their mouth.
00:53:32.739 --> 00:53:34.478
That seems like a foolish choice to make.
00:53:34.539 --> 00:53:40.759
I'm so glad you said it that way too, because when anybody thinks of interior design, they almost always think of the prettiness, right?
00:53:41.009 --> 00:53:42.688
Oh, the room will be pretty when it's done.
00:53:43.523 --> 00:53:46.503
It does not matter how pretty that room is.
00:53:46.784 --> 00:53:59.293
If the experience of getting there was miserable, people will hate that space for ever because of the baggage that was given to them as part of the remodel.
00:53:59.864 --> 00:54:10.143
So it is, more important to hone your process and hone your documents and support your clients than it is to give them some sort of.
00:54:11.099 --> 00:54:12.818
wow factor design.
00:54:12.829 --> 00:54:15.108
Most people don't even need wow factor.
00:54:15.358 --> 00:54:23.989
They need a reliable way to get from where they are to where they want to be without spending any more time, stress or money than they have to.
00:54:24.239 --> 00:54:25.458
That's what our job is.
00:54:25.838 --> 00:54:32.509
And how we execute our job results in whether or not they got the good experience or the bad experience.
00:54:32.949 --> 00:54:33.509
Well said.
00:54:34.429 --> 00:54:45.139
So Chris and Lisa, this is your moment is there anything else that you really wish interior designers knew about working with contractors to make everybody's job better?
00:54:46.559 --> 00:54:49.748
Dimensions and details are important to builders.
00:54:50.188 --> 00:54:57.958
And the more details and dimensions that you can provide to your builder, the more successful your project is going to be.
00:54:58.858 --> 00:54:59.268
Yeah.
00:54:59.708 --> 00:55:00.668
Documentation.
00:55:01.242 --> 00:55:09.324
Get it all in there and have it ready before construction starts so that not only it can be built properly, but it can be estimated.
00:55:09.329 --> 00:55:10.668
properly as well.
00:55:11.168 --> 00:55:13.489
When the details are loose, it's hard to put numbers on them.
00:55:14.239 --> 00:55:25.119
Perfect summary well, with that, if anybody's happens to be an interior designer or homeowner in the North Seattle area, I cannot recommend Rain Cap, Chris and Lisa.
00:55:25.523 --> 00:55:26.514
enough.
00:55:29.228 --> 00:55:29.449
No.
00:55:29.449 --> 00:55:31.889
Truly you always value engineered.
00:55:32.583 --> 00:55:37.684
You are always looking for the way we can accomplish this without spending unnecessary money.
00:55:38.414 --> 00:55:50.568
You always had a can do attitude, whatever struggle came up, and you always took such good care of client homes.
00:55:50.588 --> 00:55:51.728
They were tidy.
00:55:52.128 --> 00:55:53.909
They were locked at night.
00:55:54.489 --> 00:55:56.088
You cared about the kids.
00:55:56.119 --> 00:55:57.648
You care about the pets.
00:55:57.958 --> 00:56:01.889
I'm saying it all past tense because I'm not doing the projects anymore, but you still do all these things.
00:56:02.659 --> 00:56:10.764
And to me, that is the bar that every contractor should be striving to meet because that's when we create Beautiful symbiotic relationship.
00:56:10.853 --> 00:56:15.623
So if there are any designers or homeowners in Seattle, yes.
00:56:15.634 --> 00:56:17.264
Reach out to rain cap.
00:56:17.733 --> 00:56:22.583
Now you guys are mostly doing what size of projects these days.
00:56:23.483 --> 00:56:24.623
There's a lot of variety.
00:56:24.623 --> 00:56:32.036
We try not to do smaller bathroom type projects but larger scale, nicer bathroom remodels kitchen remodels.
00:56:32.237 --> 00:56:33.586
We do a lot of basements.
00:56:34.086 --> 00:56:40.847
For as not glamorous as basements can seem, they are the most transformative spaces that we work on.
00:56:41.097 --> 00:56:47.876
They go from being big, weird cobwebby spaces and open framing to all of a sudden you have a whole other floor in your home.
00:56:48.686 --> 00:56:50.856
So we, we like those a lot.
00:56:51.447 --> 00:56:55.086
We do a lot of smaller and middle scale additions.
00:56:55.601 --> 00:57:04.282
And now more and more in Seattle, we're doing backyard cottages, daddoos spaces that people can put on Airbnb and make a little money on them.
00:57:04.661 --> 00:57:06.692
So all of those and everything in between.
00:57:07.882 --> 00:57:14.461
Thank you guys so much for your very valuable time today and talking about what we should be putting into our design files.
00:57:15.492 --> 00:57:19.657
You guys are a gem in the constellation of contractors
00:57:20.083 --> 00:57:21.353
thank you so much, Rebecca.
00:57:21.373 --> 00:57:22.563
We miss working with you.
00:57:24.438 --> 00:57:40.217
Well, my friends, I hope you enjoyed my conversation with Chris and Lisa of Rain Cap Construction and that it gives you some insight into what to include in your design files to be a great partner to your contractors and get the construction results you expect and deserve.
00:57:40.838 --> 00:57:48.943
If you're curious to see one of the files that we created at Seriously Happy Homes, I am an open book in my one to one coaching calls.
00:57:49.242 --> 00:57:52.313
You can sign up for an hour with me over at seriouslyhappy.
00:57:52.342 --> 00:58:07.652
com, and I'll be happy to not only pull back the curtain on our design files, but I can also give you feedback on your files too, so that you know whether or not you're meeting the expectations and standards of a reliable and reputable contractor.
00:58:08.512 --> 00:58:12.353
And if you just want to be friends, come find me on Instagram at beseriouslyhappy.
00:58:12.353 --> 00:58:16.208
That's B spelled out, beseriously happy.
00:58:16.867 --> 00:58:22.887
And let's be friends and celebrate all the things that we're doing together to succeed as entrepreneurs and interior designers.
00:58:23.297 --> 00:58:24.088
Bye for now.