00:00:07.073Hello and welcome to Inside Modular, the podcast of commercial modular construction brought to you by the Modular Building Institute.
00:00:07.073 -->
00:00:10.342Welcome everyone.
00:00:10.342 -->
00:00:11.606My name is John McMullen.
00:00:11.606 -->
00:00:13.412I'm the marketing director here at MBI.
00:00:13.412 -->
00:00:18.251Today I'm joined by Rory Rubin, founder and CEO at SI Container Builds.
00:00:18.251 -->
00:00:27.312Rory is here to talk about her company's latest container-based projects and how states, cities and municipalities can get started with their own container-based projects.
00:00:27.312 -->
00:00:28.713Roy, welcome.
00:00:29.474 -->
00:00:30.054Hi John.
00:00:30.094 -->
00:00:30.942Thanks for having me.
00:00:30.942 -->
00:00:32.207It's my pleasure.
00:00:32.207 -->
00:00:32.950It's my pleasure.
00:00:32.950 -->
00:00:38.006Tell me about yourself, roy, what's your background and what's the story behind SI Container Builds.
00:00:38.768 -->
00:00:42.746Well, my background and the story are very mutually exclusive.
00:00:42.746 -->
00:00:43.790They're very different.
00:00:43.790 -->
00:00:46.262I started off as a clinical social worker.
00:00:46.262 -->
00:00:57.863I did work within Alzheimer's disease research and in clinical practice, and so people are like, well, that's very weird, like how could you ever do what you're doing now, which is run a modular factory?
00:00:57.863 -->
00:01:02.701And I said it's actually not that different because ultimately I'm working with people.
00:01:02.701 -->
00:01:08.307So working with people kind of transfers from social work right to this business model.
00:01:09.028 -->
00:01:16.412I started SI Container Builds about six and a half years ago because I really wanted to do something a little different in my career.
00:01:17.079 -->
00:01:25.983I came from a family of architects and construction people and I always thought that was fabulous and cool and I wanted to live more sustainably.
00:01:25.983 -->
00:01:31.906And ultimately I fell in love with the shipping container and I turned to my husband one day and I said you know what?
00:01:31.906 -->
00:01:35.201Been a management consultant for a long time, I really want to start a business.
00:01:35.201 -->
00:01:41.783And he thought it was a little crazy and he said, okay, let's just dig in and see where this takes us.
00:01:41.783 -->
00:01:46.433And so six and a half years ago I founded SI Container Builds.
00:01:46.433 -->
00:01:50.531And the SI actually stands for sustainable imprints, so people don't always know that.
00:01:50.531 -->
00:02:11.181And then over the last three years, got into our factory here outside of the Chicago area so that we could start being scalable and doing things that were even more sustainable and eco-friendly inside the factory, and that kind of wound us up here and working with MBI and in you guys, and so it's been really a cool experience, a great journey.
00:02:11.743 -->
00:02:12.445Well, that's awesome.
00:02:12.445 -->
00:02:13.508I like that story.
00:02:13.508 -->
00:02:17.766I think it takes a little bit of crazy to start a business, so good for you.
00:02:18.367 -->
00:02:20.832Thank you, I think it's still a little crazy.
00:02:20.832 -->
00:02:23.425There's never a dull moment, that's for sure.
00:02:24.367 -->
00:02:26.926So tell me about some of the projects you're working on now.
00:02:26.926 -->
00:02:28.855You mentioned being around Chicago.
00:02:28.855 -->
00:02:33.629I know you have a couple of larger scale container projects in and around Chicago.
00:02:33.629 -->
00:02:34.893What are the stories behind those?
00:02:35.439 -->
00:02:37.125Yeah, it's really, really cool.
00:02:37.125 -->
00:03:10.455So over the last year things have just kind of exploded and taken off in directions we could not have anticipated so literally, as I speak the second floor to the two-floor building that's going to go down to Navy Pier and whoever has been to Chicago knows Navy Pier, it's got the big Ferris wheel right downtown we are doing the first ever boaters amenity building that's going to be attached to the brand new marina down there that Navy Pier Marina Group is building as the developers.
00:03:10.455 -->
00:03:13.242It's the first transient marina Chicago has ever seen.
00:03:13.242 -->
00:03:23.122So the very first time in history, people are going to be able to enjoy downtown Chicago for an hour or a day or a week, where they never were able to do that by boat before.
00:03:23.182 -->
00:03:28.549And so this building that we're building out of shipping containers is just under 3,000 square feet.
00:03:28.549 -->
00:03:44.572It's all containers, it's going to have a ship store, it's going to have laundry and it's going to have bathrooms and showers and people lounge space for the boaters that are renting the slips, and so it's just this wonderful legacy project for right downtown Chicago.
00:03:44.572 -->
00:03:59.396In the same breath, we are completely approved for a permit in hand, working with HODC and Shelter Inc to provide the very first group home for girls who've been trafficked in the suburbs of Chicago.
00:03:59.396 -->
00:04:09.806It's going to be a 6400 square foot group home and girls as young as 12 years old that have not had a safe home to go to, that have come off the streets.
00:04:09.806 -->
00:04:19.841They are now going to be supported in this house, and so we have two very cool, very different type of projects supporting community here in Chicago going on right now.
00:04:20.403 -->
00:04:23.769What inspired the use of shipping containers for these projects?
00:04:23.769 -->
00:04:26.673Was it the cost, the speed, the aesthetic or something else?
00:04:27.420 -->
00:04:34.261Yeah, I mean you of all people understand modular, which is really, I mean, not everybody does so.
00:04:34.261 -->
00:04:41.834From a speed perspective, the modular piece is why we have decided to utilize containers.
00:04:41.834 -->
00:04:45.451We are brokering these containers from all over the country.
00:04:45.451 -->
00:04:54.709We are very purpose-driven of what kind of containers we use, and actually I have a blog that helps people understand what they're picking out.
00:04:54.709 -->
00:04:59.105When people say, oh, I can just build with a container, any old container, it's really not true.
00:04:59.687 -->
00:05:13.072Since the early 2000s, containers had to go through a very rigorous process to even be able to come into this country and then to be able to repurpose legally has been in the ICC code since 2018.
00:05:13.072 -->
00:05:30.850And so I fell in love with the ship container because I found out that there are more than 26 million of them sitting around because we do not ship them back, and so this is, in my opinion, an environmental crisis, and so at that point, I realized well, other countries have been doing this for decades.
00:05:30.850 -->
00:05:39.822I do know there are people in the states that have been successfully doing this for a little while, but there's not a ton of people in the Midwest and certainly not in Illinois.
00:05:39.822 -->
00:05:54.995Let's repurpose this and do something really great, and architects and engineers that come on board with us have truly been able to create wonderful spaces, built to code and doing it all correctly, right here in our factory.
00:05:54.995 -->
00:06:01.446But I just wanted to do something and get these out of the container graveyards that they're all sitting in right now.
00:06:02.526 -->
00:06:06.012How would you describe the design of these projects?
00:06:06.012 -->
00:06:11.721How are these containers being tailored for these two very distinct uses?
00:06:12.803 -->
00:06:44.906Yeah, you know, we are maybe a little bit different because everybody that work with us are licensed and certified, and so that means from our architects to our civil and structural engineers, all the people that are around us are creating a building structure, a building envelope, just using a steel frame, and so they look at the containers themselves as a steel frame, stackable like Legos, modular piece, and that they can create something pretty much anything you want.
00:06:44.906 -->
00:06:55.322I mean, I've seen architects do just incredible things all over the world with these, and when you see the Navy Pier building and the Shelter Inc building, you'll see that they're very, very different.
00:06:55.322 -->
00:06:59.165One has exposed container steel on the outside.
00:06:59.165 -->
00:07:09.240One is completely cladded so that they love the structural integrity of the steel but they want it to blend into their community a little bit better, and so there's all kinds of uses for that.
00:07:09.240 -->
00:07:18.168But ultimately it's done correctly so that the architects and engineers on board are pretty much the starting point of how we build with our clients.
00:07:19.035 -->
00:07:25.523So walk me through the development process, you know, from initial concept to construction which is going on now.
00:07:25.523 -->
00:07:33.516You know for one of these projects and you can pick what were the major milestones and who are the key players at each stage.
00:07:34.218 -->
00:07:43.095Yeah, you know it's a little different, and yet it's similar to if you're doing anything on site, because we still have to follow the same kind of process.
00:07:43.095 -->
00:07:47.387The advantage that we have is that we truly can build a lot faster.
00:07:47.387 -->
00:07:49.843So in my factory we're building all year round.
00:07:49.843 -->
00:07:52.764We don't have to deal with the weather that is outside.
00:07:52.764 -->
00:08:01.932So when a client comes to us and specifically we work with a B2B environment, we are not working direct-to-consumer anymore, we work with a B2B environment.
00:08:01.932 -->
00:08:03.254We are not working direct to consumer anymore.
00:08:03.254 -->
00:08:34.586So we'll work with a developer or a nonprofit or a commercial entity and they'll come to us and say I need a concession stand or I need a yoga studio or I need a multifamily unit, and we'll sit with them and usually the developer that we've been working with has a good understanding of what they're trying to do and a performa that is maybe not complete because they need some numbers, but they have a general idea of the building, what it's going to look like, and so we'll sit with them, with our architects and engineers, and then we'll be able to get the numbers in.
00:08:34.586 -->
00:08:37.738And they're coming to us for a couple of reasons.
00:08:37.738 -->
00:08:54.256One is they love the sustainability factor of the containers, and that's really a great cool factor, but also the fact that we can build so much faster than if we build on site and we are typically saving between 8% to 10% on our bills, just in general, to a developer.
00:08:54.256 -->
00:08:58.748So that's why they're coming to us and it just makes life a lot less complicated.
00:08:58.835 -->
00:09:03.780So after the design is complete, we go through the same process as any other new construction.
00:09:03.780 -->
00:09:16.563We are sitting down with municipalities so that everybody on their building team inspectors to the fire department they're all on board to what we're doing, because most of the time they've never seen this kind of construction before.
00:09:16.563 -->
00:09:22.298So there's a lot of questions, a lot of education, and so we spend a lot of time with them around that.
00:09:22.298 -->
00:09:29.566And then we go through the same permitting process that anybody else would have to go through and in my opinion I always say the building part is the easiest part.
00:09:29.566 -->
00:09:30.678I can do that.
00:09:30.678 -->
00:09:33.149I know exactly how much and how long that's going to take.
00:09:33.149 -->
00:09:36.340It's the other pieces and parts that wind up getting in the way.
00:09:36.340 -->
00:09:38.907That can often take a very long time.
00:09:42.554 -->
00:09:46.443How did you first initiate your conversations with the city of Chicago or the state of Illinois for these projects?
00:09:46.443 -->
00:09:48.206Was it a public call?
00:09:48.206 -->
00:09:50.179Was it a pitch directly to you?
00:09:50.179 -->
00:09:51.202How did that start?
00:09:52.225 -->
00:10:10.606Yeah, so, especially for Navy Pier, we really had a very tight timeline and when you work with any major city, you're always worried about what's going to happen and how many people are going to be needing to be a part of this decision-making process, and so, from that standpoint, the developer was involved.
00:10:10.667 -->
00:10:22.168We had an expediter that was involved because we have such a tight timeline, but it was me reaching out directly to the building department and to all of Chicago's credit, and I really feel this way.
00:10:22.168 -->
00:10:53.696People were responsive, people got on a call with us, people were excited and engaged, and so, when we were ready for rough inspection, they actually sent an entire task force of inspectors up to our factory, which I know that Chicago has done this in the past, but they don't typically leave the city proper, and so this was really awesome that they were doing this for us and people were excited and I saw a lot of hope in that, because I know that people struggle, just in general, with modular construction across the country.
00:10:53.696 -->
00:11:07.027Not every city is that gracious about it, and so far Chicago really has been, and I give them that credit because I believe that this is going to be the first of a long-term relationship with the city.
00:11:07.615 -->
00:11:08.376Well, that's very encouraging.
00:11:08.376 -->
00:11:08.898That's awesome.
00:11:08.898 -->
00:11:18.937What questions did they come with, or concerns, or what information did they need from you during that meeting and along the way to sort of get them on board with this project?
00:11:19.458 -->
00:11:22.788Yeah, I would say that none of the questions that they had were surprising.
00:11:22.788 -->
00:11:29.168They were all extremely typical of what I get when I talk to any municipality, large or small.
00:11:29.168 -->
00:11:32.465People are concerned with the container themselves.
00:11:32.465 -->
00:11:34.201They think of it as a rusty old box.
00:11:34.201 -->
00:11:42.104They think of it as having could it have had hazardous materials come over, like what do we do about stuff like that?
00:11:42.104 -->
00:11:50.900They also are concerned with the concept of mold and mildew, because containers have a bad rap with that kind of piece and what do we do for all of that?
00:11:51.423 -->
00:12:11.591And it's reassuring that the way we build and how we build and where we get things and how we sign off on things, and so that it's a comfort level for them, because things just really have changed in the last decade and not everybody realizes that there's still a lot of old mantra and a lot of old tape in people's heads and I understand that.
00:12:11.913 -->
00:12:15.282And so it's getting them comfortable that we're not so weird and it's not so unique.
00:12:15.282 -->
00:12:28.625And I think when the inspectors came here on the outside they could see this two-story container building because we actually built it out in our factory, completed, and then when they were inside they're like oh, the electric's exactly the same.
00:12:28.625 -->
00:12:32.259The plumbing's the same, the spray foam's the same, the drywall's the same.
00:12:32.259 -->
00:12:40.178This is not any different than any new construction, and so for them it was just a comfort level and it made a lot more sense.
00:12:40.178 -->
00:12:48.582So I would imagine for next time it's not going to be so weird to say I'm doing a container multifamily building and this is what it's going to be.
00:12:48.582 -->
00:12:56.743Okay, we get it, you're going to follow what we need you to follow and we'll see what we need to see, and that kind of communication was awesome.
00:12:57.465 -->
00:13:03.479You mentioned the city's willingness to sort of step outside of the city limits and come give you a visit.
00:13:03.479 -->
00:13:05.528Were there any particular champions?
00:13:05.528 -->
00:13:11.058You know individuals or groups or departments within the city that helped move things forward?
00:13:12.024 -->
00:13:16.990So I would say that there were probably a couple individuals I don't know if they would want me to say that we don't have to name names.
00:13:17.966 -->
00:13:18.888In the building department.
00:13:18.888 -->
00:13:37.100There were a couple of people that I was, you know, really great grateful for and a couple of commissioners that were really a part of the whole process, and I would say, overall, working with the city of Chicago was easier than sometimes a couple of the smaller municipalities that we've had to work with in Illinois.
00:13:37.100 -->
00:13:44.845They were a little bit more difficult and really just had a mindset that anti-container and Chicago is a lot more open.
00:13:44.845 -->
00:14:02.913Maybe the time has come that they realize we are not an only solution, but we are a solution to do things faster, a little less expensive and make things in the city really pretty, and so I'm really I was encouraged by that.
00:14:02.955 -->
00:14:06.288You never know and you hear, you know big, big municipalities.
00:14:06.288 -->
00:14:09.118You get lost in the shuffle, you get sidetracked.
00:14:09.118 -->
00:14:10.385People don't want to listen.
00:14:10.385 -->
00:14:17.745We had such a great experience so far that I really want to do kudos to the city of Chicago.
00:14:18.508 -->
00:14:31.212So, based on these experiences that you've had, particularly with the city, what's the best starting point for a municipality interested in launching its first modular?
00:14:31.253 -->
00:14:31.894or container-based project.
00:14:31.894 -->
00:14:32.636How should they start?
00:14:32.636 -->
00:14:36.388Yeah, to me I think, starting with A a phone conversation and B.
00:14:36.388 -->
00:14:38.072Come to the factory, come visit.
00:14:38.072 -->
00:14:40.918We're always open to do that kind of tour.
00:14:40.918 -->
00:14:59.918So we've had a whole group of people in building departments for a single municipality come in, from a fire chief down to an inspector, to everyone in between, and honestly, that makes a big difference because once you can feel it and see it and touch it and they can wrap their heads around it, it's not such an unusual concept.
00:14:59.918 -->
00:15:02.120So for me it's about communication.
00:15:02.120 -->
00:15:04.109It's about working directly, one-on-one.
00:15:04.109 -->
00:15:24.049So if a developer comes to us and says we have an idea but we're worried about it, my absolute next first step is calling the municipality directly and having that initial conversation with them so that we can engage them right away, so everybody can be a part of this team to make sure that you know people are, the comfort level is there.
00:15:24.913 -->
00:15:33.323Now, from the municipality or governments, local governments point of view, what are the main advantages that modular and containers offer to them?
00:15:33.323 -->
00:15:35.288You know, is it financials or logistical?
00:15:35.288 -->
00:15:35.809Is it social?
00:15:35.809 -->
00:15:37.534Is it all the above or are there?
00:15:37.534 -->
00:15:38.397Did I miss anything?
00:15:39.105 -->
00:15:40.349Well, I think there's you.
00:15:40.349 -->
00:15:43.076I think there's a few specifics.
00:15:43.076 -->
00:15:44.971One is from a developer standpoint.
00:15:44.971 -->
00:15:46.731Their ROI is certainly a lot faster.
00:15:46.731 -->
00:15:53.091Meaning, I'm going to get you housing, and I don't know a single area in this country that is not desperate.
00:15:53.445 -->
00:15:54.811We are in a housing crisis.
00:15:54.811 -->
00:15:56.730Everybody understands that.
00:15:56.730 -->
00:16:06.256I am a solution to the housing crisis when they can finally wrap their head around what this is, not being so unique and different, but I can do it a lot faster.
00:16:06.256 -->
00:16:10.817It's a really cool, cool thing for me to be able to boast about.
00:16:10.817 -->
00:16:22.900So, ultimately, that is something that's great Less expensive, a little bit less expensive, and being able to do it in the factory so people can come and see as it's being done.
00:16:22.900 -->
00:16:29.153The site work can get done at the same time as the build process, and so we don't have to wait from one to the other.
00:16:29.153 -->
00:16:32.173I mean, modular has been around for a long time.
00:16:32.173 -->
00:16:33.470I know you know that.
00:16:33.470 -->
00:16:48.758That's why there's the whole institute around that, but at the end of the day, I feel like there's just so much need for it still as a solution base to all kinds of things, housing included, that I can't talk about it enough.
00:16:48.758 -->
00:16:50.994I'm sure you can't talk about it either.
00:16:52.206 -->
00:16:53.945What's a flip side of that coin?
00:16:53.945 -->
00:17:01.721What are some of the biggest obstacles and misunderstandings that public officials have when it comes to modular and container construction?
00:17:01.721 -->
00:17:06.498If you had to boil it down to one or two things, I think there's a fear factor.
00:17:06.818 -->
00:17:14.824I would say the fear of the unknown for people is what drives people to say no right away instead of digging in and seeing.
00:17:14.824 -->
00:17:15.925It's not so different.
00:17:15.925 -->
00:17:20.974I have the steel frame structure that I'm using.
00:17:20.974 -->
00:17:34.096So if you really boil it down to the fact that it is just a core 10 steel frame and I know exactly what that steel frame is and it's engineered correctly and the architect does the plans correctly, it doesn't matter that it's a container.
00:17:34.096 -->
00:17:38.201But then there's tax incentives that people can use to do things.
00:17:38.201 -->
00:17:58.794That for the sustainability piece, because I'm recycling something that otherwise would not be recycling or recycled or repurposed, and so it's really just managing an old tape, an old dialogue in people's heads that it's not a rusty old box, that this is something that's built to code, that has been legally allowed to be repurposed for decades.
00:17:58.794 -->
00:18:04.788And ultimately you know we are, we're doing things correctly, and so it's a communication.
00:18:05.551 -->
00:18:13.433Have there been lessons learned from Chicago or the state of Illinois that could help other cities or states initiate projects similar to these?
00:18:14.215 -->
00:18:14.797I hope so.
00:18:14.797 -->
00:18:24.237I mean stay tuned right, like once we get these up and running and people can do walkthroughs and really appreciate and see the end result.
00:18:24.237 -->
00:18:27.516I'm really hoping that the comfort level is shared.
00:18:27.516 -->
00:18:43.179So when I do a presentation, I often add in pictures of like multifamily and other commercial builds that people have done and companies have done in other parts of the country and I can say I wish I made this up Like this is super unique.
00:18:43.179 -->
00:18:57.224However, san Diego, los Angeles, nashville, north Carolina, new York places have done this and so when they see that and they can say, oh, you know, that's really cool and it's not so weird and unique.
00:18:57.224 -->
00:19:01.594And maybe Chicago, there's room for us here and not just the city, but you know, all throughout the Chicago.
00:19:01.594 -->
00:19:03.184There's room for us here and not just the city, but all throughout the state.
00:19:03.184 -->
00:19:06.095There's a lot of different ways to be able to repurpose them.
00:19:06.924 -->
00:19:17.300You alluded to this a little bit before, but how do you see container construction fitting into the broader future of urban development and affordable and special use buildings?
00:19:17.300 -->
00:19:20.012What's the future look like for containers?
00:19:21.244 -->
00:19:22.349Oh, I hope it keeps growing.
00:19:22.349 -->
00:19:38.135I mean, truly, there are so many containers just sitting around not being used, and I know that there are a few other companies like mine and a couple of them I got to meet at world of modular, which I was really excited because they've been doing this a little bit longer than than we have.
00:19:38.135 -->
00:19:48.738You know, a shout out to to my counterparts and colleagues out there that have been really digging in longer than I have, because I do believe that there is a purpose for this long term.
00:19:48.738 -->
00:19:59.276I think that why not use something that is truly not going to be used for anything else, since we have the technology, we have the knowledge to do that?
00:19:59.276 -->
00:20:02.049So I do believe it will just continue to grow.
00:20:02.450 -->
00:20:14.048The difficulty is, in my opinion, because you had asked this before there's a challenge that I fight all the time, and that's with the internet.
00:20:14.048 -->
00:20:17.740There's a lot of misinformation, so people think I can just buy any old container and anything that I see and I can just repurpose it myself.
00:20:17.740 -->
00:20:22.674You have skills because you have construction skills and you know what you're buying.
00:20:22.674 -->
00:20:32.769That's fine, but we have actually had to fix multiple mistakes when that has happened, because it's still construction, and when it's done correctly.
00:20:32.769 -->
00:20:37.269It takes a skill set to do it, and so I fight the Internet an awful lot.
00:20:38.712 -->
00:20:39.213Don't we all?
00:20:39.213 -->
00:20:49.817Last question, I'll let you go what advice would you give to container builders who are looking to break into the public sector?
00:20:49.837 -->
00:20:50.984or civic projects Talk to each other.
00:20:50.984 -->
00:21:07.012I would say the one thing I really loved most about World of Modular for me is the ability to meet people that are in the space, and so I do have people that call me from other parts of the country and ask questions, and I'm super open to that.
00:21:07.012 -->
00:21:09.887I think sometimes people think, well, they're competitors.
00:21:09.887 -->
00:21:17.335You know you really, you're what's your intellectual property, you're giving that away, but at the end of the day, there's so much need out there.
00:21:17.335 -->
00:21:24.009Let's figure out these challenges together, and if something didn't't work, I want you to know that we tried this and this is what didn't work.
00:21:24.009 -->
00:21:26.556Don't make the same mistake I did, you know.
00:21:26.556 -->
00:21:27.217Try to you know.
00:21:27.217 -->
00:21:28.287Make sure that we have a.
00:21:28.287 -->
00:21:34.790We build this together so we build it correctly together and we can get good reputations by doing that.
00:21:34.790 -->
00:21:37.701So that would be my advice well, thank you, uh.
00:21:37.862 -->
00:21:38.463So much, rory.
00:21:38.463 -->
00:21:39.609I really appreciate your time.
00:21:39.609 -->
00:21:43.386It was great finally meeting you at World of Modular last month.
00:21:43.386 -->
00:21:48.198I can't wait to see these projects conclude and your next projects after that.
00:21:48.785 -->
00:21:50.412Thanks so much, john, appreciate you.
00:21:51.154 -->
00:21:57.074My name is John McMullen and this has been another episode of Inside Modular, the podcast of commercial modular construction.