ဤအပိုင်းအကြောင်း
During the Apollo era, North American-Downey built the Apollo Command & Service Module. After each completed spacecraft, Nasa conducted formal reviews of the build paper work before each vehicle was accepted for flight.
အင်္ဂလိပ်
အမေရိကန်ပြည်ထောင်စု
ကူးယူချက် 🔗
Are you the producer of this podcast?
Add a podcast transcript
Need Audio-to-Text?
Transcribe with Listen411 in Just 60 Seconds
ပြီးခဲ့သည့် အပိုင်းများကို ရှာဖွေပါ
Space Rocket History Archive ၏ ယခင်အပိုင်းများကို ရှာဖွေပါ
ဤ PODCAST တွင် အခြားသော အပိုင်းများ
Lovell completed four space flights and is one of only three men to travel to the Moon twice. Lovell accrued over 715 hours spent in space, and he saw a total of 269 sunrises from space on his Gemini and Apollo flights.
Homepage with pictures.
As Lovell prepared for the thruster adjustments, Haise finished closing down the LEM and drifted through the tunnel back toward the command module and Swigert threw the switch to stir all 4 cryogenic tanks.
Homepage with Pictures
Milt Windier’s team at mission control quickly reviewed the status of the remaining four engines, ran the computations for the new engine cutoff times, and passed them to the crew.
Homepage with Pictures
By the time Flight Director Kranz heard Lovell’s report, of “Houston, we’ve had a problem. ” three controllers had reported related problems. Kranz was wondering which problem Lovell was reporting, as he started relaying the long list of warning indications from the spacecraft displays.
Homepage w…
မသက်ဆိုင်ကြောင်းရှင်းလင်းချက်: ဤစာမျက်နှာပေါ်တွင် ထည့်သွင်းထားသော ပေါ့တ်ကာစ်နှင့် အနုပညာလက်ရာများသည် ၎င်း၏ပိုင်ရှင်၏ပိုင်ဆိုင်မှုဖြစ်သည့် Michael Annis မှဖြစ်ပြီး Listen Notes, Inc နှင့် ဆက်နွှယ်ခြင်း သို့မဟုတ် ထောက်ခံထားခြင်းမရှိပါ။
ပြင်ဆင်ပါ
ပေါ့ဒ်ကတ်စ် ဒေတာဘေ့စ်ကို နောက်ဆုံးပေါ်အချိန်နှင့်တပြေးညီဖြစ်စေရန် ကူညီပေးသည့်အတွက် ကျေးဇူးတင်ပါသည်။