MENGENAI EPISOD INI

Bahasa Inggeris
Amerika Syarikat

Tunjukkan NOTA 🔗

TRANSKRIP 🔗

CARI EPISOD LEPAS

Cari episod lepas bagi The Data Center Daily.

EPISOD LAIN DALAM PODCAST INI

Oracle proposes absorbing about $300 million of rising Point Beach nuclear costs for its Port Washington campus, while Spain's draft decree would make data centers prove hour-by-hour renewable backing or lose their grid permits. Plus Crusoe-linked filings with no tenant, Memphis's moratorium vot ...
The New York Times reports Meta has claimed billions in research tax credits by treating its AI data centers as experimental pilot models. Plus Michigan's conditional approval of DTE's Google contracts, MISO's 120-day study for paired large loads and generation, TeraWulf's 1 GW Muskie contract, ...
Blue Energy filed ERCOT's first small modular reactor interconnection request, planning up to 1.5 GW of GE Vernova Hitachi BWRX-300s for a Crusoe data center. Meanwhile, Amazon is pledging $1 billion to data center communities, and Taylor, Texas, votes on annexing a 500 MW campus. In this episod ...
A bipartisan Senate permitting package would make data centers pay both incremental and embedded transmission costs, while OpenAI takes a 20-year, roughly 8-gigawatt lease at SB Energy's Ohio campus backed by more than 9 gigawatts of planned gas. Plus TVA's Clinch River SMR permit and two fights ...
Black Hills signs on to serve Google's Cheyenne campus with a 2.7 GW resource stack built largely on undisclosed third-party supply, and Indiana County's posted filing names AWS for 36 buildings at the Homer City gas campus. Also: Oracle's Wisconsin transmission line restarts review, Firmus and ...
Penafian: Podcast dan karya seni yang dibenamkan pada halaman ini adalah daripada The Data Center Daily — Lantern Podcasts, yang merupakan hak milik pemiliknya dan tidak bergabung dengan atau disokong oleh Listen Notes, Inc.