MENGENAI EPISOD INI

Bahasa Inggeris
Amerika Syarikat

TRANSKRIP 🔗

CARI EPISOD LEPAS

Cari episod lepas bagi Data Center Infrastructure Podcast.

EPISOD LAIN DALAM PODCAST INI

A nuclear reactor that fits in a shipping container, built on an assembly line, and sold out through 2035. Recording on the road at the Future Bridge High Density Power Conference, Eric and Lance sit down with Richard Gaut, CFO of Deployable Energy, maker of a one megawatt microreactor. Eric ...
Texas hit pause on the biggest data center buildout in history, and this episode explains why. Lance and Eric welcome their first remote guest, Del Hilber of Atlas Energy Solutions, who brings 25 years in energy markets, from the Constellation trading floor in the Enron era to running one of the ...
When Gary Wojtaszek got into data centers, 10 megawatts was enormous. Now he builds gigawatt digital factories. Eric and Lance sit down with Gary "Wojo" Wojtaszek, Executive Chairman of Pure Data Centres Group and former CEO of CyrusOne, which he took public and scaled into one of the ...
The line for grid power in Texas has grown past 400 gigawatts. Jake Corley decided to skip the line entirely.In episode three of the Data Center Infrastructure Podcast, Lance Teel and Eric Sonner sit down with Jake Corley, Marine Corps veteran and founder of Corley Energy, who is building off gr ...
Penafian: Podcast dan karya seni yang dibenamkan pada halaman ini adalah daripada Data Airflow, yang merupakan hak milik pemiliknya dan tidak bergabung dengan atau disokong oleh Listen Notes, Inc.