이 에피소드에 관해
Hear our experts Fabian Hippe (from Menck, Acteon’s Marine Foundations business line) and Ben Andrew (from 2H, Acteon’s Engineering Consultancy) discuss how to manage installation risks for offshore wind foundations, from common challenges to practical solutions that keep projects safe, efficient, and on schedule.
영어
영국
전사 🔗
Are you the producer of this podcast?
Add a podcast transcript
Need Audio-to-Text?
Transcribe with Listen411 in Just 60 Seconds
이 팟캐스트의 다른 에피소드
Offshore projects generate terabytes of survey and inspection data - but is it ready for AI? In this episode, Tim Eyles, VP at Acteon, alongside Christopher Hillier, Head of Sales and Commercial and Greg Hammond, EA Digital Lead at UTEC, Acteon’s Geo-services business line, discuss how better data …
Permanent mooring is one of those offshore operations where small decisions made early can have massive consequences over the life of a field. In this episode, Brian Boutkan, Director of Commerce at Jumbo Offshore, and Martin Kobiela, Value & Performance Authority at Intermoor, unpack why moori…
Mooring integrity management can be seen as an afterthought. Yet, the risks and costs associated with a mooring line failure can be catastrophic. In this episode, Tom Fulton, Global Director, Strategic Mooring Solutions and Kent Longridge, Senior Principal Engineer at Intermoor dive into a topic th…
Offshore geotechnical engineering is a world of deep water, shifting soil and evolving technology. In this episode, Guste Kelly (née Cesnuleviciute), Marketing Campaign Lead at Acteon, sits down with Justin Carpenter, Sales and Business Development Director at UTEC, Acteon’s Geo-services business l…
면책 조항: 이 페이지에 포함된 팟캐스트와 작품은 Acteon에서 가져온 것입니다. 이 팟캐스트는 소유자의 재산이며 Listen Notes, Inc.와 제휴하거나 보증하지 않습니다.