INFORMAZIONI SU QUESTO EPISODIO
Unlock the secrets to revolutionizing your construction projects with Building Information Modeling (BIM) in our latest episode featuring Mark Oden, CEO of BIM Design. Dive deep into the world of BIM, likened to a highly accurate version of Minecraft, where Mark shares how this intelligent 3D model-based process enhances planning, design, construction, and management of building projects. From laser scanning technology to facilities management, Mark’s insights reveal the power of BIM in preventing litigation through effective communication and documentation.
Discover how high-quality BIM models and rigorous training of union journeymen can lead to successful project execution. Mark discusses a collaborative renovation of a training center in Arizona, showcasing the importance of precision and avoiding construction clashes. We also explore the core values driving BIM Design, including quality performance, trust, and community engagement. Learn how these principles have guided the company through financial challenges and expansion, even during the COVID-19 pandemic.
In our engaging conversation, Mark delves into the benefits of BIM, from reducing rework and controlling costs to shortening project lifecycles and enhancing collaboration. Real-world testimonials and case studies illustrate how proactive communication with subcontractors can lead to no-cost settlements and mitigate risks. Tune in to grasp how Building Information Modeling can transform your construction projects, improve safety, reduce defects, and ultimately save time and money.
Contact the Future Construct Podcast Produced by BIM Designs, Inc!
- BIM Designs, Inc.: minority-owned, US-based, union-signatory preconstruction technology firm, offering turnkey BIM modeling, laser scanning, coordination management, and other VDC solutions to the AEC industry.
- Schedule a free consultation: sales@bimdesigns.net.
- Subscribe to our weekly blog and our Future Construct Podcast
- Suggest a podcast guest
MOSTRA NOTE 🔗
TRASCRIZIONE 🔗
00:00:22.576 --> 00:00:27.001
The CEO of BIM Design, and BIM is Building Information Modeling.
00:00:27.001 --> 00:00:41.548
It's an intelligent 3D model-based process that gives architects, engineering and construction professionals the insight and tools to more efficiently plan, design, construct and manage building and infrastructure.
00:00:41.548 --> 00:00:54.536
Mark, prior to being a design mark, had 10 years of experience working in Silicon Valley, in tech companies, in product management, business development, mergers and acquisitions, and in C-suite roles.
00:00:54.536 --> 00:00:58.304
Mark leads the growth strategy and execution of the company.
00:00:58.304 --> 00:01:00.283
His acute ability to develop and implement strategic processes that of the company.
00:01:00.283 --> 00:01:11.317
His acute ability to develop and implement strategic processes that scale the company capabilities drive efficiency services delivery increases client satisfaction, as we all know, causes claims that we don't.
00:01:11.819 --> 00:01:15.436
and his cross-functional team I introduce to you Mark Oden.
00:01:24.330 --> 00:01:25.704
Does this work for everyone, or would you like to use a microphone?
00:01:25.704 --> 00:01:26.228
Does this volume work?
00:01:26.228 --> 00:01:29.906
Yes, okay, let me know if that changes at any point.
00:01:29.906 --> 00:01:33.907
Thank you so much, linda, for the kind introduction and for inviting me here to this conference.
00:01:33.907 --> 00:01:39.282
I'm really truly honored, and I thank you to David, who will be hosting the panel.
00:01:39.282 --> 00:01:42.443
This is the panel for the next session, so thanks for that.
00:01:43.812 --> 00:01:46.580
As Linda mentioned, this is a little bit about me.
00:01:46.580 --> 00:01:49.169
Well, first I wanted to tell you more about what we're going to talk about today.
00:01:49.169 --> 00:01:54.121
We're going to be talking about how BIM, or Building Information Modeling, can help prevent litigation.
00:01:54.121 --> 00:01:57.633
In order to explain that to you, I'm going to take on a little journey.
00:01:57.633 --> 00:02:01.115
A little bit about me, a little bit about what is building information modeling.
00:02:01.115 --> 00:02:22.337
If that's new to you, I'll explain that I have some ways to relate and several different ways to relate the concept to you, and then we'll talk about what has been designed what is my company and what's the history of my company and what services we offer together in terms of how we probably help prevent litigation.
00:02:22.358 --> 00:02:24.250
How does building information model in the process in general help with litigation?
00:02:25.031 --> 00:02:35.663
At the very end I have two case studies real-world case studies of where we situations we've encountered over the last few years on how we help avoid litigation through good communication and documentation.
00:02:35.663 --> 00:02:40.417
I just remember the very first conversation I had with Linda over a year ago.
00:02:40.417 --> 00:02:46.030
She mentioned the two major avoidances of litigation are communication and documentation.
00:02:46.030 --> 00:02:54.336
I've sung that from the mountaintops within my company for the year after that Great, great education that Linda offered me.
00:02:54.336 --> 00:02:56.756
So I really appreciate her so much for that.
00:02:58.250 --> 00:03:00.518
So with that just a little bit about this.
00:03:00.518 --> 00:03:04.020
As Linda mentioned, I am the CEO of InDesigns.
00:03:04.020 --> 00:03:19.317
Prior to that, I had 10 years of experience in corporate America working for Cisco Systems, started my career as a network engineer, moved into product management, then moved into business development, mergers and acquisitions and strategy and planning.
00:03:19.317 --> 00:03:23.881
Business development was the final chapter of my time at Cisco.
00:03:23.881 --> 00:03:30.495
But I'd like to say that I don't have them on paper, but through working at Cisco I got the equivalent of three MBAs.
00:03:30.495 --> 00:03:33.514
It was a great company, worked hard and I learned a tremendous amount.
00:03:33.514 --> 00:03:43.977
Prior to Cisco, I went to the University of Florida and got my Master's of Electrical and Computer Science engineering degrees and several different minors in my undergrad.
00:03:43.977 --> 00:03:47.560
So that's a little bit about me.
00:03:48.030 --> 00:03:51.158
Now I'd like to introduce what is building information modeling?
00:03:51.158 --> 00:04:00.813
Building information modeling, in essence, is the realization of what you want to build in physical space.
00:04:00.813 --> 00:04:08.299
So this room that we're in, this building that we're in, is a great building that should probably was modeled in three dimensions.
00:04:08.299 --> 00:04:14.067
So you're taking what you want to physically build and you're modeling that in three dimensions, almost like you're building a video game.
00:04:14.067 --> 00:04:25.239
But instead of building a video game or watching Avatar on a big screen, you're actually building a real world implementation down to an infinite accurate accuracy model to what you will build.
00:04:25.769 --> 00:04:28.098
That's often called the pre-construction process.
00:04:28.098 --> 00:04:32.000
So the process of running that is either called BIM or the pre-construction process.
00:04:32.000 --> 00:04:40.696
It's an integrated structure, multidisciplinary data to produce the digital representation of the asset across the life cycle.
00:04:40.696 --> 00:04:45.847
The life cycle, again, is the shift from the planning to the construction and into operations.
00:04:45.847 --> 00:04:47.836
So you might also hear about facilities management.
00:04:47.836 --> 00:04:50.604
So facilities management can leverage the 3D model.
00:04:50.831 --> 00:05:10.878
Late post-construction 10, 20, 30 years after construction they might have a breakdown, a systemic breakdown inside of the building and rather than tear apart the walls and figure out where the systems and parts are, they can look at the 3D models, superimpose that of what's physically there and then maybe only cut a section of the wall out rather than a whole big section of the wall out too, playing a lot less grind the needle in the haystack.
00:05:10.878 --> 00:05:18.002
So it enables virtual information to be shared by the design team.
00:05:18.002 --> 00:05:27.196
The design team is the architects, the engineers, the civil engineers, structural engineers, et cetera, the detailers and other key roles in the pre-construction process.
00:05:27.196 --> 00:05:33.140
They can share the information on that team amongst the main contractor, the subcontractor, the general contractor and the owner.
00:05:33.140 --> 00:05:43.508
And then, as I mentioned, the use of BIM goes beyond planning and design phase into the building lifecycle of maintenance of buildings, maintenance of the building.
00:05:45.013 --> 00:05:48.221
So I know that was maybe a new concept for a lot of you.
00:05:48.221 --> 00:05:55.355
So just to raise your hands, who has kids who can relate to Minecraft?
00:05:55.355 --> 00:05:59.362
Maybe they've played it, maybe they have kids that have played Minecraft.
00:05:59.362 --> 00:06:03.741
So building information modeling is a lot like Minecraft.
00:06:03.741 --> 00:06:14.230
In Minecraft you're trying to build a potentially realistic implementation of the world in a 3D model.
00:06:14.230 --> 00:06:20.088
There's a little bit of an accuracy difference between Minecraft and building information modeling, but besides, that there's a lot of similarities.
00:06:20.069 --> 00:06:22.651
bit of an accuracy difference between Minecraft and building information modeling, but just so I know there's a lot of similarities.
00:06:22.651 --> 00:06:28.612
Just a little side story that I thought I'd share with you this summer.
00:06:28.612 --> 00:06:35.746
Just two, three weeks ago I completed a summer's long road show around the country we're a nationwide company at this point.
00:06:35.746 --> 00:06:45.700
In each city I stopped for about a week or two weeks and stopped in cities all around the southern and midwest area of the country.
00:06:45.700 --> 00:06:51.250
I spent two weeks in South Carolina to meet with my head of project controls, ashley Calkins.
00:06:51.250 --> 00:06:57.987
She's 10 plus years working for Ford, which is one of the top general contractors in the country, and she came in and joined our leadership team.
00:06:58.831 --> 00:07:03.072
I'm so honored to have that in a remote collaborative space that we work in.
00:07:03.072 --> 00:07:12.913
After not almost nine months of working together, this was the first time I was meeting her in person for the first time Because it was summer.
00:07:12.913 --> 00:07:27.448
She had her daughter and she had two nieces that were in town, I think from Wisconsin, that were visiting just for summer vacation and having a lot of fun with her daughter, and the three of them have been able to bond over the years because of Minecraft.
00:07:27.448 --> 00:07:50.741
So they all have their tablets, they all have their phones, they all have their ways of playing and collaborating together building Minecraft, and the nephew his name is Baba and I really were able to connect at a pretty deep level Throughout the whole two weeks I was there, all the kids were talking about Minecraft this and Minecraft that and things that would fill, things that would destroy and all the stories that came to it.
00:07:52.473 --> 00:08:00.198
And one night after dinner Bubba pulled me aside and said I want to show you, I want to show you my craft.
00:08:00.198 --> 00:08:06.340
And he opens up his tablet and he goes into that world and the parents that maybe didn't relate to this would know what I'm talking about.
00:08:07.112 --> 00:08:19.979
But he shows me in his game all of the different nooks and crannies, and crevices and secret hiding places and tops and bottoms and levers and just everything that kids spent hours concocting.
00:08:19.979 --> 00:08:32.634
In essence, bobo was the architect, he was the visionary, he was the engineer, he was the model in place, the design in place, and he was the detailer.
00:08:32.634 --> 00:08:33.577
He was the modeler.
00:08:33.577 --> 00:08:37.250
He had actually built the components to build that entire vision onto reality.
00:08:37.250 --> 00:08:39.958
I'm very touched by that story.
00:08:39.958 --> 00:08:41.182
I'm glad I get to share that with you.
00:08:41.182 --> 00:08:46.189
But that's just a maybe a through world relatable experience of building information.
00:08:46.189 --> 00:08:54.454
Along the ends, we as the detailers, we build all those books and crannies and premises and letters that would.
00:08:54.454 --> 00:08:58.469
We build out a virtual space, a 3D space that would be now surrounding us.
00:08:58.469 --> 00:09:02.896
It would be the space ceiling, space in between here, the attic space, the crawl space, all of that.
00:09:02.896 --> 00:09:04.819
So I hope that helps.
00:09:05.560 --> 00:09:28.820
We also have a short video, two more video that is a fly-through of a building that explains visually, show you both the 3D representation of the building, so it will see that in different colors and you'll see black and white blocks which actually look a lot like Minecraft.
00:09:28.820 --> 00:09:30.363
And that's from a laser scan.
00:09:30.363 --> 00:09:36.502
I'll talk about laser scanning a little bit later in the presentation and laser scanning can help produce litigation.
00:09:36.502 --> 00:09:39.799
But imagine if I was going to change the space.
00:09:39.799 --> 00:09:41.064
This existing space would be called tenant improvement.
00:09:41.064 --> 00:09:41.605
So I was going to change the space.
00:09:41.605 --> 00:09:42.689
This is an existing space, which we call tenant improvements.
00:09:42.689 --> 00:09:45.519
I was going to construct something into this physical space.
00:09:45.519 --> 00:09:53.217
I would want to know where those fixtures are and how to avoid those fixtures in real time and down to high level accuracy.
00:09:54.529 --> 00:10:08.264
So to help avoid clashes that may happen on a job site, I could take a piece of equipment that's called a laser scanner or a reality capture, and I can scan at a medium accuracy of 30 million laser scans.
00:10:08.264 --> 00:10:10.491
Think of it as a concept of sonar.
00:10:10.913 --> 00:10:16.137
Like dolphins, they send an audio sound and it pings back and they know the distance.
00:10:16.257 --> 00:10:24.286
So laser scanning is the same visual indicators and lasers and it does that across millions and millions and millions of points and then those points are all measurable to each other.
00:10:24.286 --> 00:10:39.918
So now I can take this wall and that wall and the distance between the two and I can take the space that we're in right now and scan it in a matter of 10 minutes or less, put that now into my virtual space and I can then design what will future be built in that to the accuracy of knowing where it is.
00:10:39.918 --> 00:10:46.029
So we partnered with a local union in Arizona, with the Joint Apprenticeship Training Center.
00:10:46.029 --> 00:10:49.564
They had recently bought a building that they called JATC building 9.
00:10:49.564 --> 00:10:51.695
They renovated that building.
00:10:51.716 --> 00:11:04.557
They wanted to renovate that building and they asked us to say hey, here's an existing structure, can you scan it and you then improve that structure to allow our, our apprentices, our journeymen, to go in there and practice?
00:11:04.557 --> 00:11:09.968
You know, with piping practice, plumbing practice for service, so you'll see toilets and things in there.
00:11:09.968 --> 00:11:11.871
That why are there so many toilets in one area?
00:11:11.871 --> 00:11:13.014
That's because these are for service.
00:11:13.014 --> 00:11:17.379
So we'll just play that video and do the background here.
00:11:17.379 --> 00:11:27.169
So let's see if that looks like a good idea.
00:11:37.650 --> 00:11:51.573
So from the outside, the gray area is the laser scan, the red area is the laser scan, the red area is the structural steel, the green is piping, plumbing and piping, and the red mechanical equipment that we're all being tested with and equipment pumps.
00:11:51.573 --> 00:11:54.140
So those are the example pumps that they might service.
00:11:54.140 --> 00:11:57.149
This is a second level story that they wanted to add that didn't exist before.
00:11:57.149 --> 00:11:59.217
It didn't look before.
00:11:59.217 --> 00:12:07.925
In the building, on a sub-level that second level they have toilets and sinks that are serviceable and you see the plumbing and the piping through the walls.
00:12:07.925 --> 00:12:23.543
So you just want to access all of that, whether in the draining process and we even show sub-floors in a moment it will navigate lower, it will show below the ground so you can see the piping also runs below the ground.
00:12:23.543 --> 00:12:25.663
So more surface areas and meters.
00:12:25.663 --> 00:12:29.766
If you look closely, there are a bunch of people's hollers there.
00:12:29.766 --> 00:12:31.112
Water heaters.
00:12:38.370 --> 00:12:38.953
You can see.
00:12:38.953 --> 00:12:39.216
That's all.
00:12:39.216 --> 00:12:44.217
Plumbing is resisting equipment, every area is, and existing equipment Every area is existing mechanical equipment.
00:12:44.217 --> 00:12:52.028
That is very much a service that everything is used and then outside are very large water storage tanks to help offset service to the water storage.
00:12:52.028 --> 00:12:56.745
So this whole building is currently in progress of being built.
00:12:56.745 --> 00:13:04.105
Now it's being sent to the city and if we helped we could have effectively donated our time.
00:13:04.105 --> 00:13:10.444
I've loaded a box to hold this code and scan this model.
00:13:10.444 --> 00:13:26.097
So that's just.
00:13:26.097 --> 00:13:37.004
That's Minecraft, and React.
00:13:37.283 --> 00:13:43.987
So I hope that was a reasonable explanation of building information, modeling and engaging.
00:13:43.987 --> 00:13:47.858
Enough, alright, so what?
00:13:47.858 --> 00:13:49.442
Are some of the pain points and solutions.
00:13:49.482 --> 00:13:52.048
Why does the industry choose to use building information modeling?
00:13:52.048 --> 00:13:58.237
Or, more specifically, why would they want to use a company like Finansat, companies like BIM Design?
00:13:58.237 --> 00:14:08.360
So one is one pain point is poor quality BIM models for constructability issues and value engineering issues related to BIM modeling.
00:14:08.360 --> 00:14:11.894
So anybody can model a Minecraft.
00:14:11.894 --> 00:14:15.101
Can anybody model something that's down to an eighth of an inch accuracy?
00:14:15.101 --> 00:14:25.132
So that's the chasm that existed between the two In our company we've chosen to work with union trained journeymen and tradesmen.
00:14:26.055 --> 00:14:31.754
To become a tradesman in a union, to become a journeyman you must go through a five year apprenticeship.
00:14:31.754 --> 00:14:44.766
The apprenticeship is five years of in-field work, so working in the field and then night school classes at night and passing certain classes and criteria and then eventually getting local licenses.
00:14:44.766 --> 00:14:48.576
Eventually they call it turning off and graduating into the journeyman.
00:14:48.576 --> 00:15:01.309
So by the time you become a journeyman you have touched the equipment, you've welded, you've cut the equipment, you've shifted, you've fitted, you've probably worked in the fab shop, you've done all sorts of different things to get to that point five years later.
00:15:01.309 --> 00:15:04.639
So you are effectively an expert at constructing.
00:15:05.469 --> 00:15:11.182
What we do at FIM Designs is we hire the trained journeyman.
00:15:11.182 --> 00:15:23.122
They typically at that point already know, or people help them learn, the software, which is typically Autodesk or Autopad and Revit, and they will take what they've learned in the physical space and apply that in the virtual space.
00:15:23.122 --> 00:15:38.241
So a lot of times with companies outside of the design, you might not have a fully-constructed model because the person building that model isn't fully experienced in building the structure that you've been constructing.
00:15:38.241 --> 00:15:56.099
And then value engineering comes into play because as you're designing that, you can think about areas to save materials, save space, save vents, save anything and the more material you save on the job site, the more safe that job site is, because you're sending less material there and you're installing less.
00:15:58.552 --> 00:16:03.161
So litigation and reducing risk is the less time you can spend on the job site the more safe.
00:16:03.161 --> 00:16:09.036
The job site is Another thing that we've been respecting for bailing wage regulations.
00:16:09.557 --> 00:16:18.856
So if you think about federal work, like a fee day in hospitals or schools or other areas that would require prevailing wage on the job site.
00:16:18.856 --> 00:16:24.538
There's also public contracts that require auditing proof that you are respecting these prevailing wages.
00:16:24.538 --> 00:16:36.058
We have them designed to get more union Unions are always prevailing wage, so there's never an issue of working with a union provider because it's always been respected for prevailing wage.
00:16:36.058 --> 00:16:41.000
And then, absolutely predicting and predict and estimate BIM costs.
00:16:41.000 --> 00:16:46.911
A lot of times a package to do building information modeling will be put together at the beginning of a bigger.
00:16:46.911 --> 00:16:52.199
You know how do I build the entire building and BIM is a portion of that overall thing, that overall bid.
00:16:52.199 --> 00:17:00.603
So it might be a $10 million project and maybe a $500,000 to $1 million BIM project.
00:17:01.812 --> 00:17:11.031
So at the beginning of the project clients are often licking their finger, putting their hand up, seeing which way the wind is blowing and saying I think it's gonna be a million dollars of BIM cost.
00:17:11.031 --> 00:17:16.904
But I actually wanna win this bid because they're taking the lowest cost bid, so I'm gonna make it $500,000.
00:17:16.904 --> 00:17:22.141
And we're gonna see if we can cut the VIM budget short so that we can win this project.
00:17:22.141 --> 00:17:49.644
So we can come in and say well, let's look at the 2D plans, let's look at what the architect wants, let's look at what the engineer wants and let's give you a bid that will be realistic and obtainable.
00:17:49.644 --> 00:18:01.766
Because if it's truly a million dollar project but I put $500,000 in my bid to win it, I'm going to have problems for the next, or the contractor that did that is going to have problems for the next three years because they're trying to fight to win that $500,000.
00:18:01.766 --> 00:18:02.649
Does that make sense?
00:18:05.779 --> 00:18:12.451
Furthermore, some pain points would be dynamic demand so this is access to resources and consistent access to labor.
00:18:12.451 --> 00:18:16.269
So the labor construction we all know ebbs and flows.
00:18:16.269 --> 00:18:17.523
Oftentimes in the winter it ebbs.
00:18:17.523 --> 00:18:20.535
Election we all know ebbs and flows, often times in the winter the ebbs, electioneers, the ebbs that go through all of this.
00:18:20.535 --> 00:18:20.876
It's true.
00:18:20.876 --> 00:18:27.252
What clients want is an ability to access that labor at a very steady state.
00:18:27.252 --> 00:18:37.051
They invest a lot of money to hire and train individuals and then when those ebbs happen, they have to let those individuals go and they have training knowledge that goes to other companies.
00:18:37.051 --> 00:18:46.394
Once they're let go, companies that have been designed can provide to them access to the steady state flow of labor so it stabilizes their workforce.
00:18:46.394 --> 00:18:59.236
We utilize domestic workers Okay, I got sidetracked there, but dynamic bit of demand, not enough detailers.
00:18:59.820 --> 00:19:03.307
We can also help them scale their teams when they don't have enough detailers on their staff.
00:19:03.559 --> 00:19:05.651
Or maybe they don't have any detailers at all on their staff.
00:19:06.240 --> 00:19:11.567
Maybe they have very aggressive schedules that they committed to and they're realizing that they're understaffed for those aggressive schedules.
00:19:11.567 --> 00:19:16.524
So we can help them meet that Lack of experience or poor communication with subs.
00:19:16.524 --> 00:19:23.403
For us, we focus on embracing technology, so I take all those 10 years that I worked at Cisco.
00:19:23.403 --> 00:19:32.544
Back in 2008, I was using one of those JetSense phones where you have a video phone and you pick up the handset, you dial the phone number and you see the person's video on it.
00:19:32.544 --> 00:19:40.932
That evolved into telepresence, which is these big screens of real world talking to each other, and that eventually evolved into WebEx and Zoom, where we are in today's world.
00:19:40.932 --> 00:19:47.492
So we try to embrace all of the tools that allow us for remote communication and collaboration.
00:19:48.299 --> 00:20:03.105
We are effectively an entirely remote company, so it's impossible in today's day and world to bring all of the members of a pre-construction design team together in the same room at the same time to work on the same project, Especially in today's day and age.
00:20:03.105 --> 00:20:04.549
It just doesn't exist anymore.
00:20:04.549 --> 00:20:17.069
So we really pride ourselves in utilizing the newest and greatest technology to help create collaborative, cohesive teams, and we also provide education, training and consultation.
00:20:17.069 --> 00:20:29.621
Being the experts in the field, we can then expose that expertise out to our clients, whether that be the subcontractors, the general contractors, the engineers or the architects Also.
00:20:29.641 --> 00:20:52.964
I want to thank Larry because he extended my brain today at lunch, realizing that we can actually be expert witnesses too when it comes to these types of claims, because we have the expertise to fly the model as we showed the video of that and realize where the constructability issues might be, realize what should have been done during that time that shouldn't have made it to the final product, for example.
00:20:52.964 --> 00:20:56.776
So we went that way.
00:20:56.776 --> 00:21:00.431
So that's a little bit about building information, modeling the pain points.
00:21:00.431 --> 00:21:01.858
I'd like to introduce us as a company.
00:21:01.858 --> 00:21:05.429
We were founded in 2016 in San Francisco.
00:21:05.429 --> 00:21:07.966
We just celebrated our five year anniversary.
00:21:07.966 --> 00:21:12.119
That's a milestone for any business and I'm very proud of that.
00:21:12.119 --> 00:21:13.493
I'm happy that we accomplished that.
00:21:13.493 --> 00:21:22.548
I took ownership of the company partial ownership in 2018, and I purchased the company outright in 2019.
00:21:22.548 --> 00:21:33.226
This year was the first year that we submitted ourselves for and we were nominated to the EAP 5000 fastest growing company list Of 5000 companies that submitted.
00:21:33.226 --> 00:21:36.544
Of many companies that submitted, 5000 made it to the list.
00:21:36.544 --> 00:21:38.558
We were number 148 in that submitted.
00:21:38.520 --> 00:21:39.919
Many companies that submitted 5,000 made it to the list.
00:21:39.919 --> 00:21:43.407
We were number 148 in that list and number six I think five in Arizona.
00:21:44.359 --> 00:21:48.002
Either number five in Arizona or number six in construction, or those are reversed.
00:21:48.002 --> 00:22:01.199
But those two metrics are there for the EAT 5000 list and we're also one of the only or one of the few combination certified minority owned businesses and union companies nationwide.
00:22:01.199 --> 00:22:06.846
So we have a few things going for us in our growth and I'll have a chart of that in a moment.
00:22:08.580 --> 00:22:17.405
So, as I mentioned, we are experienced domestic engineers and tradesmen within an ever growing market for building information, modeling and pre-construction virtual design.
00:22:17.405 --> 00:22:24.116
In 2018, we had three employees operating in Los Angeles at the time of 2018.
00:22:24.116 --> 00:22:27.847
In 2019, we had at the end of that growth.
00:22:28.309 --> 00:22:48.230
At the end of 2019, we had nearly 40 fully remote employees operating in 10 different states, across 17 different local unions and two offices with a headquarters in Phoenix, arizona, and we fast forward to today, which I reflect back on it like a blink of an eye going through it, maybe not so much at times.
00:22:48.230 --> 00:23:00.340
We're at nearly 70 employees in 22 states nationwide, with 20 union locals and two more offices added to New England, california and New York.
00:23:00.340 --> 00:23:02.183
We work on nearly 100 projects to date.
00:23:02.183 --> 00:23:10.226
As part of operating the company, I believe in eight different core values.
00:23:10.226 --> 00:23:12.234
These core values are very important to us.
00:23:12.394 --> 00:23:14.643
I represent them every day.
00:23:14.643 --> 00:23:16.888
I work with my leadership team to represent them every day.
00:23:16.888 --> 00:23:18.636
Who works with the management team?
00:23:18.636 --> 00:23:22.485
Who works with individual contributors to institute our core values?
00:23:22.485 --> 00:23:23.147
Every single day?
00:23:23.147 --> 00:23:30.663
And every Monday we have an operations huddle where we meet with everybody on the operations team and we pick one of the core values Other than any topics.
00:23:30.663 --> 00:23:33.144
We always pick one core value to talk about that week as well.
00:23:33.144 --> 00:23:39.130
So other core values of quality performance as union tradesmen.
00:23:39.130 --> 00:23:46.908
The team takes pride in the work product that they produce and so important that it is high quality so that it can be constructed.
00:23:48.433 --> 00:23:52.511
Trust and ethics we hold ourselves to the highest standards when it comes to trust and ethics.
00:23:52.511 --> 00:24:08.746
We must be transparent with ourselves and with clients and if an employee ever feels that they've been compromised, they're encouraged, they're trained, to bring that to management, which ultimately comes to me, and I work through managing any trust and ethics issues personally.
00:24:08.746 --> 00:24:16.473
We are solutions driven, which means we aim to solve the problem and speaking to the needs of the problem.
00:24:16.473 --> 00:24:23.788
So we work within our internal team and within our clients to speak to our needs so that the solution comes true.
00:24:24.500 --> 00:24:29.489
We don't just operate in silos, we don't just accept what is we work together to try and solve the problem.
00:24:31.759 --> 00:24:33.669
And innovation is a big one.
00:24:33.669 --> 00:24:40.539
It's a very big one for me, again, coming from the technology sector, I do consider them designs a very big one for me, again, coming from the technology sector, I do consider them a technology first construction company.
00:24:40.539 --> 00:24:48.038
So we're constantly looking at how do we introduce innovation and how do we better the overall environment for all companies.
00:24:48.038 --> 00:24:58.850
So I actually have a head of business development and innovation dedicated to how are we changing the world?
00:24:58.850 --> 00:25:00.612
Teamwork is another core value.
00:25:00.612 --> 00:25:02.095
So how do we all work together?
00:25:02.095 --> 00:25:03.695
How do we work through any barriers?
00:25:03.695 --> 00:25:09.704
Again, how do we address it or speak to our needs?
00:25:09.764 --> 00:25:13.269
Community engagement we really focus on bettering our community, as I'm bettering our soul in the end.
00:25:13.269 --> 00:25:16.353
So we have a large focus on self-care and community care.
00:25:16.353 --> 00:25:21.949
In our company we have ownership of commitments, which is another core value.
00:25:21.949 --> 00:25:30.050
We're committed to helping each other solve their needs and we're committed to speaking to our needs and we're committed to owning true to our commitments.
00:25:30.050 --> 00:25:42.885
When I own true to my commitment, that either means I give you a date and time that I give you something and I deliver it by then, or before that date and time, I let you know what has come up that has blocked me from delivering true to that commitment.
00:25:42.885 --> 00:25:51.270
We know that when you're working with clients and many clients that go up to construction staff one commitment can lead to 10 different commitments per whole monthly dishwasher.
00:25:51.270 --> 00:25:56.089
So we're very, very careful in how we explain our commitments to our clients.
00:25:56.089 --> 00:26:00.519
And last but not least is diversity and inclusion.
00:26:01.182 --> 00:26:16.545
Diversity and inclusion is of utmost importance to us, having no bias against gender, age, race, ethnicity or religion, and we believe it actually makes a stronger community, a stronger company by being as diverse as we can.
00:26:16.545 --> 00:26:27.771
Thank you for letting me share that One of the services that we offer as a company.
00:26:27.771 --> 00:26:30.984
So we offer design, build or plan spec pre-construction processes.
00:26:30.984 --> 00:26:35.943
Mepf is short for mechanical, electrical, plumbing and fire protection.
00:26:35.943 --> 00:26:41.240
So we do that, build those trades, we specialize in those trades for building information, modeling.
00:26:41.240 --> 00:26:45.098
We are looking at expanding into architecture and engineering.
00:26:45.098 --> 00:26:48.476
So those are easy extensions for us now at this point and in the growth of our firm.
00:26:48.476 --> 00:26:51.205
But our core was MAPS.
00:26:51.205 --> 00:26:53.110
We can also do free construction consulting.
00:26:53.110 --> 00:26:59.029
So if you look at the general contractor, that fullltry construction phase we could in theory effectively run
00:26:59.069 --> 00:27:02.235
that phase on behalf of the general contractor.
00:27:02.235 --> 00:27:07.692
And then laser scanning we chatted about and we shared the video on laser scanning as a service.
00:27:07.692 --> 00:27:10.962
So this is a growth chart.
00:27:10.962 --> 00:27:12.927
Over time it's split up.
00:27:12.927 --> 00:27:18.312
It's not evenly spread over months, but you'll see in 2016 and 2017.
00:27:18.312 --> 00:27:19.679
That was the original founder of Great Vision.
00:27:19.679 --> 00:27:24.893
It was a three-person, a two-person company up until I joined in 2018.
00:27:24.893 --> 00:27:35.842
In August of 2018, I was presented with the opportunity to take over a team of detailers that were moving Phoenix Arizona, so it was a bigger company.
00:27:35.842 --> 00:27:38.108
It was a construction company that did installations.
00:27:38.108 --> 00:27:44.607
They're Texas-based, they had an Arizona division and, for business reasons, they decided to shut down the Arizona division.
00:27:44.607 --> 00:27:46.447
So inside of that division.
00:27:46.639 --> 00:27:57.418
They had a smaller team of 20 detailers which is what we do and they had a conference not much different than this conference, and they said we would love for our detailing team to go to a good home.
00:27:57.418 --> 00:28:04.970
So, rather than them all going to different companies, they invested their time and their effort building the team and we had that manager and that team go to a good home.
00:28:04.970 --> 00:28:19.925
It wasn't long after that I sold every single stock of mine to Two Houses that I had undergird to take on payroll for this company for this team and it was.
00:28:19.925 --> 00:28:21.369
I had nine weeks of payroll.
00:28:22.079 --> 00:28:34.787
Six weeks in we had not secured enough business to maintain that team, so I went into the manager's office that became our VP of operations, has since left the AUU for a time.
00:28:34.787 --> 00:28:46.110
Our VP of operations and I said we have three weeks left and this whole experiment has given away my entire life's work and I'll have to start over.
00:28:46.110 --> 00:28:47.724
So what can we do?
00:28:47.724 --> 00:28:59.012
We were very fortunate to win a very large baseball stadium in Arlington, texas that carried us for the next nine months and that saved the company.
00:28:59.012 --> 00:29:08.534
So from there we continued to grow very rapidly very fortuitously into the beginning of COVID.
00:29:11.079 --> 00:29:17.242
Prior to COVID, we were anticipating year-over-year growth of at least doubling year-over-year, if not more than that.
00:29:17.242 --> 00:29:32.772
We actually continued that growth into COVID because, once COVID struck, a lot of companies de-risked a lot of larger construction companies de-risked so they actually scaled down their teams, including their detailing teams, and they hired firms like us to take on that risk.
00:29:32.772 --> 00:29:43.339
So there was a growth spurt, but you'll see that dip in March 2021, where companies have figured out like, hey, it's been 18 months, it's been 16 months, this is not going anywhere.
00:29:43.339 --> 00:29:46.327
We need to figure out what our day-to-day operations are again.
00:29:46.327 --> 00:29:51.650
So they started to re-risk back up and we weren't pre-pick forecast that.
00:29:51.650 --> 00:29:52.372
We didn't predict it.
00:29:52.372 --> 00:29:56.245
So we had a dip, but we've since corrected from that and maintained our goal.
00:29:56.245 --> 00:30:06.269
So, as I mentioned, we're a nationwide company and we are union based, so we work with 25 different.
00:30:06.269 --> 00:30:07.533
We work with 25 different locals around the country.
00:30:07.533 --> 00:30:08.203
Those are locals that we hire out of.
00:30:08.203 --> 00:30:20.490
So those are locals that have the training centers that I spoke about earlier that go through that, train the apprentices for five years to turn in the tournament and they turn out detailers, and so those detailers work remotely all over the country through those different levels.
00:30:20.490 --> 00:30:24.830
These are some notable projects that we've worked on.
00:30:24.830 --> 00:30:30.982
We've worked on a number of commercial projects, primarily in the tech sector space, so, for example, there's Google Out that Place.
00:30:30.982 --> 00:30:33.466
We've also worked on YouTube and Facebook buildings, for example.
00:30:33.466 --> 00:30:38.458
We work across all industries and spectrums.
00:30:41.773 --> 00:30:51.981
So this is a quote from a very dear friend, a very dear partner of ours, a business manager of local 469 in Arizona, aaron Butler.
00:30:51.981 --> 00:31:00.063
So he speaks to the value of why should entities want to work with union detailers?
00:31:00.063 --> 00:31:10.235
They go through 10,000 hours of training and they know their local city state construction codes to be able to interpret the plans and blueprints of all disciplines.
00:31:10.235 --> 00:31:13.875
They have the years of experience actually doing it in the field.
00:31:13.875 --> 00:31:16.597
So he reaffirms some of my statements I said earlier.
00:31:16.597 --> 00:31:18.432
We have a blog.
00:31:18.432 --> 00:31:30.015
We try to publish one a week, and so this was a quote that I had participated in and I had worked on this article Five Reasons why you Should Hire Human Detailers.
00:31:30.015 --> 00:31:34.128
Here's another nationwide map of US-based projects.
00:31:34.128 --> 00:31:36.698
You can see a large West Coast focus.
00:31:36.718 --> 00:31:42.399
That is where we started in the West Coast, where we are shifting to take on projects nationwide.
00:31:42.721 --> 00:31:48.022
You can see one dot there all the way to the east in New Jersey, so we're starting to pick up in the Midwest and East Coast.
00:31:48.022 --> 00:31:59.558
Definitely, building information modeling is a technology-driven process so that actually is adopted in the West a little bit faster than other areas of the country.
00:31:59.558 --> 00:32:05.309
That actually is adopted in the West a little bit faster than other areas of the country.
00:32:05.309 --> 00:32:09.018
Another quote that I want to share with you is from one of our clients.
00:32:09.018 --> 00:32:09.922
This is actually from a general contractor.
00:32:09.961 --> 00:32:44.499
So we were at the time working for a sub and he was the general contractor managing the entire thin process, or the reconstruction process, and so he had mentioned that we have a G++ team on this project and we are collectively a well-oiled BBC machine Now he was the manager of this entire process of maybe a little biased he said biased or not probably the best group assembled that he has had the pleasure of working with and he thanks us and I thank him for the opportunity of working with them and the opportunity of receiving that wonderful faculty of working with them and the opportunity of receiving that wonderful faculty.
00:32:44.499 --> 00:32:45.579
So that's a lot of information about building.
00:32:45.579 --> 00:32:53.471
Sorry, that's a lot of information about their designs and I've introduced them.
00:32:53.471 --> 00:32:54.953
Now, why is the industry using them?
00:32:54.953 --> 00:32:58.619
How do we segue this into what your clients you know?
00:32:58.619 --> 00:33:01.304
Why is this interesting to them and why is this interesting to?
00:33:01.304 --> 00:33:01.464
You.
00:33:02.590 --> 00:33:09.589
So building information modeling does many things, not just these six items here, but it avoids clashes between elements.
00:33:09.589 --> 00:33:24.322
So as I'm building in between the walls that I can't see here, I might not have enough space for the HVAC work and the plumbing and the pipe and the electrical and the pipe protection, the HVAC work and the plumbing and the piping and the electrical and the pipe protection.
00:33:24.322 --> 00:33:27.547
So as I conceptualize that as an architect, I might not see there's not enough space.
00:33:31.169 --> 00:33:34.849
But even as an engineer I can say, hey, we want the occupancy of this to be so many hundreds of people, so I need this much water to run through the pipes.
00:33:34.849 --> 00:33:37.759
Well, if the pipes are so large, they take up space.
00:33:37.759 --> 00:33:51.269
If I put all that space together, I might find that there's actually a clash of equipment because of either space constraints or other system constraints, so you can actually visualize those clashes and that's often called coordination.
00:33:51.870 --> 00:33:57.534
It's identifying those clashes and then working across all the different trades to coordinate, resolving those clashes.
00:33:57.534 --> 00:34:00.974
It allows you to capture reality accurately.
00:34:00.974 --> 00:34:08.574
So look at reality in a 3D sense, but in a perfect sense, and get a perfect presentation of the building.
00:34:08.574 --> 00:34:40.958
So imagine you had a $10 million budget and you were building this building that we're in today and you had a vision as the owner, as the developer, to build this building and you've got a lot of amazing things and maybe you were detailed enough to think about the exact picture, the exact when I walk into the guest room, I want it to be this type of sink, and then the building gets built and you walk in to that room, you physically walk into the room as you walk into the many hotel rooms, and you look as the owner, the person who invested a lot of money into this building, and said I don't like that sink.
00:34:40.958 --> 00:34:47.145
It would cost a lot, it would be doable, but it would cost a lot to take that sink out of all of the rooms and throw it away.
00:34:55.431 --> 00:35:00.067
So imagine in today's world, where we live is we can model that and we can put on virtual reality headsets and we can walk through that building, having paid for the model but not paid for the construction.
00:35:00.067 --> 00:35:02.655
I can now say I don't like this.
00:35:02.655 --> 00:35:14.420
Or, as a doctor, I can say I don't think I'm going to get my journey around that corner and we need to think about you know the size of that besides that corner or any other any other implications that you can think of.
00:35:14.420 --> 00:35:21.570
If you can actually 3d conceptualize the model, it'll improve collaboration across your business.
00:35:21.570 --> 00:35:25.121
It forces all of those stakeholders to talk to each other.
00:35:25.121 --> 00:35:32.380
It forces them to think about what's going to happen on the site before the project even starts.
00:35:32.440 --> 00:35:42.232
You can understand the sequence and the steps of the building process, bring that value over the years back when it comes to scheduling and you can visualize the elements of the building.
00:35:42.232 --> 00:35:45.559
So there was a.
00:35:45.559 --> 00:35:58.322
We have some sources here, some surveys that were done and a recent survey of BIM usage by construction professionals show that 89% of them have used BIM on some of their projects.
00:35:58.322 --> 00:36:01.590
That's a huge adoption of BIM in the construction space.
00:36:02.813 --> 00:36:11.032
At least half of their projects are actively using BIM 47% say that and we're only seeing this trend continue to increase.
00:36:11.032 --> 00:36:15.762
We're also seeing ADC professionals say that.
00:36:15.762 --> 00:36:18.675
76% of them say that it reduces rework.
00:36:18.675 --> 00:36:24.398
Reducing rework saves time, saves money and saves on potential litigation.
00:36:24.398 --> 00:36:29.206
66% say that it improves budget and cost controls.
00:36:29.206 --> 00:36:47.942
If I stay within budget and I maintain and I control my cost, I'm also reducing litigation because I'm staying within the framework of the contract and 55% say that it shortens the project lifecycle time, which creates an opportunity to produce more, produce more work now and in the future.
00:36:49.853 --> 00:36:56.134
And it's been proven that the return on investment increase with high-end engagement is 40% of that project.
00:36:56.134 --> 00:36:59.246
So if you look at that $10 million project and you had been to it, you could potentially save 40% on it.
00:36:59.246 --> 00:37:03.259
So if you look at that $10 million project and you add BIM to it, you could potentially save 40% on it.
00:37:03.259 --> 00:37:05.018
It would be $4 million.
00:37:05.018 --> 00:37:10.177
That's a huge chunk of change that you can save by thinking and conceptualizing everything like that.
00:37:10.177 --> 00:37:31.699
So some other benefits to using BIM would be visualizing actual building elements in 3D, eliminating costly mistakes during construction, replacing thousands of printed drawings so you can have something visually represented and overall, enhance construction safety management.
00:37:31.699 --> 00:37:37.603
I want to talk about that in practice.
00:37:37.603 --> 00:37:47.020
So I said earlier in the presentation, if you reduce the amount of hours, in the field you're reducing the number of accidents that could occur in your overall improving safety.
00:37:47.949 --> 00:38:04.583
So the entire BIM you know BIM is not just for the 3D representation what we do is we create the IKEA set of instructions for construction and we take that IKEA instruction set and we hand it over to what's called prefabrication.
00:38:05.490 --> 00:38:37.329
Prefabrication is a warehouse with shop tools that are in a physical space, not on the job site, that probably have half or less of the required people to buy the material in bulk, run it through machinery that cuts that piping down to size per spec of what we designed, with far less human involvement human engagement than if we were doing that on the job site with manual tools and again removes them from the site.
00:38:37.329 --> 00:38:43.382
So it moves a lot of the work that could otherwise happen on the job site to that pre-propercation stage.
00:38:43.382 --> 00:38:53.221
If you optimize and perfect that pre-propercation stage, then you ship it to the job site and you're simply and you can even pressure, test it and inspect it pre-installation.
00:38:53.221 --> 00:38:56.880
So you're passing inspection before you even got it to the job site.
00:38:56.880 --> 00:39:08.460
You ship it then to the job site and then you just in theory attached a few bolts and now you've got the whole assembly installed and you haven't spent eight hours or two weeks assembling out the job site.
00:39:08.460 --> 00:39:12.918
You've taken that all off the job site and you've been greasing and minimizing the risk of litigation.
00:39:14.369 --> 00:39:19.757
So 75% of companies that have adopted them report a positive return on investment.
00:39:19.757 --> 00:39:26.000
I'd like to say that I'm sure that we can help the remaining 25% see that return on investment.
00:39:26.000 --> 00:39:34.199
So, talking about laser scanning, I had introduced that concept before.
00:39:34.199 --> 00:39:36.223
It's also known as reality capture.
00:39:36.223 --> 00:39:38.634
It's the same space, same name.
00:39:38.634 --> 00:39:53.940
It uses lasers to measure and create 3D space through the model and it's a growing segment of the construction due to efficiency, sophistication, portability of equipment and again, helps reduce overall potential litigation.
00:39:54.211 --> 00:39:57.436
I actually have a case study that specifically talks about laser scanning.
00:39:57.436 --> 00:40:10.194
But again, imagine you're trying to make this physical space change but you didn't have a real world understanding of what was here and you shipped stuff to the job site and you went to install it and you said, oh shoot, that's in the way.
00:40:10.194 --> 00:40:11.699
We have to start from scratch.
00:40:11.699 --> 00:40:13.976
Well, there's a whole cost structure to that.
00:40:13.976 --> 00:40:18.114
Because of that, there's chain orders and somebody's got to pay for that change somewhere along the way.
00:40:18.114 --> 00:40:25.500
So if you can actually capture this in reality and then plan for what you're going to build, you're going to save a lot in that sense.
00:40:27.311 --> 00:40:38.424
So laser scanning contractors receive tremendous value on both renovation and new projects, and it allows for modelers to all work on that and collaborate remotely together.
00:40:38.424 --> 00:40:45.826
Okay, so this is the fun part to all work on that and collaborate remotely together.
00:40:45.826 --> 00:40:46.788
Okay, so this is the fun part.
00:40:46.788 --> 00:40:53.389
How can BID help reduce litigation in construction?
00:40:53.389 --> 00:40:54.572
So a couple more data points.
00:40:54.592 --> 00:41:01.056
Us Bureau of Labor Statistics rates the construction industry as the riskiest environment for work injuries and fatalities across all other industries.
00:41:01.056 --> 00:41:02.373
Construction tops them.
00:41:02.373 --> 00:41:03.898
I don't know if that's a good thing or a bad thing.
00:41:03.898 --> 00:41:05.380
In a sense I think it's a bad thing.
00:41:05.380 --> 00:41:13.139
So utilizing building information modeling, construction companies can enhance safety management through other ways that I've talked about.
00:41:13.139 --> 00:41:23.447
You can bring labor off the field but have that be a pre-found shop, pre-planned, pre-produced, all of that material before you install.
00:41:23.447 --> 00:41:27.978
You can produce again the Ikea instruction set of instructions.
00:41:27.978 --> 00:41:46.134
So you're centralizing the thought process of that design to an individual or group of individuals that all approve that design, rather than decentralize it to each individual job site and let those individual choices be made at that site.
00:41:46.134 --> 00:41:56.739
The more you can decentralize the thought model, the more you can de-risk that thought model Based on research we've done.
00:41:56.759 --> 00:42:07.500
The top four reasons for construction litigation include construction defect claims, construction delay lawsuits, water, mold and built-in damage claims, and theme and breach of contract claims.
00:42:07.500 --> 00:42:12.561
So building information modeling can actually help with each one of these items.
00:42:12.561 --> 00:42:16.695
In terms of construction defect claims we can.
00:42:16.695 --> 00:42:33.052
In the design process, whether we have the engineer level or the detailer level, they can look for what is the specific design of that component all the way up to the manufacturer so they can make sure that that part that's going in is appropriate for that moment in time.
00:42:33.052 --> 00:42:41.240
So that should avoid future defects Construction delay lawsuits we saw earlier in the statistics that it improves.
00:42:41.730 --> 00:42:43.194
I think it was 40 something percent.
00:42:43.194 --> 00:42:48.137
Said that it improved 44 percent, if I remember improved project schedules.
00:42:48.137 --> 00:43:13.501
So hopefully it actually adjusts the schedule for the better and avoids the lawsuits that good construction delays water and mold claims would come from good, good plumbing design and good plumbing installation good installation of the IKEA instruction set and then lean and contract breach claims would be reduced by keeping the cost down.
00:43:13.561 --> 00:43:23.130
As we talked about, there's a cost reduction in the building information model and usability information model.
00:43:23.130 --> 00:43:26.335
There's also risks to construction and having a lack of a document strategy and documentation strategy.
00:43:26.335 --> 00:43:43.061
Having a lack of a documentation strategy allows for heavy rework or costly rework, lost productivity for hunting down documents, schedule overruns for blown budgets and disputes between contractors and clients and that difficulty in responding to litigation demands.
00:43:43.061 --> 00:43:56.040
The good news about building information modeling is that if you have this centralized team that's spread out around the country, it forces this concept of how do we collaborate, how do we document.
00:43:56.040 --> 00:43:59.797
So the BIP execution plan is the starting point for that.
00:43:59.797 --> 00:44:07.139
It lays out what's your digital footprint of this project and it forces building information modeling and it forces a healthy documentation strategy.
00:44:10.029 --> 00:44:11.976
How do we work with GCs and A&E firms?
00:44:11.976 --> 00:44:16.295
We help visualize the ultimate vision of the architect and the engineer.
00:44:16.295 --> 00:44:22.951
We work directly with the owner, the GC and the CEL to interpret their vision down to an each of an interactor team.
00:44:22.951 --> 00:44:26.157
We also can lead coordination.
00:44:26.157 --> 00:44:29.744
I talked about coordination earlier in the pre-construction process for general contractors.
00:44:29.744 --> 00:44:39.483
We can work across multiple subs and run that entire process for all of the subs, or we can work for one side of the energy network collaboratively with the enterprise.
00:44:41.054 --> 00:44:48.250
We can train major firms and receives on coordination, class detection, project management, new tools and software like Revit.
00:44:48.250 --> 00:44:59.273
We can run class reports for them, we can assign classes, we can educate on project management, fiscal responsibility and then run code refresher courses.
00:44:59.273 --> 00:45:02.317
And we're starting a training line of business with them.
00:45:02.317 --> 00:45:06.643
So here's a video.
00:45:06.643 --> 00:45:10.173
I just got a time indicator.
00:45:10.173 --> 00:45:16.773
Yeah, so if there's time for this, I'll share it, but effectively, this is our detailers at play.
00:45:17.815 --> 00:45:21.601
So these are our guys that are on their computer detailing.
00:45:21.601 --> 00:45:29.282
Maybe it'll be at the end of my presentation just to kind of transition between one segment to another.
00:45:29.282 --> 00:45:34.132
So case study time is.
00:45:34.132 --> 00:45:36.295
I have two case studies.
00:45:36.295 --> 00:45:45.766
In this particular case study we were subcontracted by a subcontractor who was contracted by the general contractor.
00:45:45.789 --> 00:45:49.056
The general contractor had an agreement with the subcontractor.
00:45:49.056 --> 00:45:52.664
Subcontractors scheduled commitments that they had to hit to the general contractor.
00:45:52.664 --> 00:45:56.067
Those are commitments that that subcontractor made without our involvement.
00:45:56.067 --> 00:45:59.337
That subcontractor came to us and said we would love to.
00:45:59.337 --> 00:46:01.994
We can't do this, so we need your help doing this.
00:46:01.994 --> 00:46:13.282
And we said okay, for the two things that you need, we can start on time for one of them, but for the other one you won't be able to start on time, or the time that you've dedicated you need to start on time.
00:46:13.282 --> 00:46:19.259
We can start on time X plus two, let's say so.
00:46:19.259 --> 00:46:24.127
We stated our what we could commit to very clearly to the client.
00:46:24.127 --> 00:46:29.362
The client said, okay, let's go, let's execute, let's do this Over time.
00:46:30.326 --> 00:46:41.501
There was some confusion on the project because the general contractor had not been informed that there were certain delays along this path and they wouldn't inform that of what we could or could not get to.
00:46:41.501 --> 00:46:48.201
When we approached this with our subcontractor, the subcontractor did not want us having this conversation with the general contractor.
00:46:48.201 --> 00:46:54.456
They wanted to own that very confident, that they wanted to own that relationship with the general and they did not want us to communicate anything to the general.
00:46:54.456 --> 00:47:06.355
It put us into a very difficult position because we knew what commitments we could make, how we could deliver to the project, but we weren't being enabled to communicate those commitments beyond the client that we were funding.
00:47:06.375 --> 00:47:13.871
Ultimately, what happened, obviously, is the construction project fell behind schedule and the general contractor wasn't getting the information they needed to understand the why.
00:47:13.871 --> 00:47:15.994
They were just seeing that it was running behind schedule.
00:47:15.994 --> 00:47:24.210
And in order to react to this or force that conversation forward, the general contractor back charged the subcontractor.
00:47:24.210 --> 00:47:25.873
There's delays, there's construction delays.
00:47:25.873 --> 00:47:28.177
That's one of the four reasons for litigation.
00:47:28.177 --> 00:47:33.507
And the sub went right back to us and said well, you guys are late, so we're going to back charge you.
00:47:33.507 --> 00:47:43.603
So again now we're in this kind of weird vortex of having told the client what we can do, but somehow we're getting back charged for delivering on what we actually could do.
00:47:43.603 --> 00:47:57.157
So our project manager went and collected all of the emails that I'd written the correspondent with, created a timeline and then showed both the sub and the general contractor exactly what happened and how it transpired.
00:47:57.157 --> 00:48:02.961
We ended up settling a no-cost settlement, just out-of-court settlement, to remove ourselves from that project.
00:48:02.961 --> 00:48:21.893
But it was a huge lesson to us to ensure that communication is documented and to set an achievable timeline in this documentation and to receive it as an alarm bell if your client doesn't want you talking to the general contractor to create a two-way communication path so
00:48:21.933 --> 00:48:24.860
that's case study one with court litigation.
00:48:24.860 --> 00:48:30.536
Case study two is that this is the laser scanning case study I referenced.
00:48:30.536 --> 00:48:40.282
So in this case study we had a basement area, a subfloor area that had a lot of equipment mechanical equipment that already existed.
00:48:40.282 --> 00:48:58.853
That equipment had been laser scanned not by us, but as a relevant had been laser scanned at the beginning part of the project, and that should have been given and handed over to the detailer and carefully managed and coordinated while we designed for what we were going to modify and improve in that area.
00:48:58.853 --> 00:49:14.226
Our contract was simply time and materials, so let's provide an expert over to this project, and that expert would be managed by an overall project, not necessarily by us as a firm A very simple time and material basis project.
00:49:25.509 --> 00:49:32.518
As this project unfolded, though, these laser scans and clashes were not heavily discussed in these normal coordination meetings that happen at the general contractor level.
00:49:32.518 --> 00:49:34.860
So we actually had been applying the laser scans.
00:49:34.860 --> 00:49:39.706
We just didn't catch everything and everything that should have been.
00:49:39.706 --> 00:49:42.269
That actually created some challenges.
00:49:42.269 --> 00:49:49.836
The electricians went in to try to install it and they said, hey, there's this existing stuff in the way and we're going to have to reroute it in the field.
00:49:49.836 --> 00:49:57.262
It's going to cost a lot of money and so we need to talk about who's paying for these costs, because this was clearly documented and physical here before.
00:50:00.061 --> 00:50:19.112
As this escalation occurred and money was started you know, figures were started to point at who's going to pay what we noticed that our sub very similar to the last story had backed away, had leaned out of the conversation, had leaned out of the relationship with us, and we started to dig into where's the contractual obligation here.
00:50:19.112 --> 00:50:23.827
Number one this is time and material, so it needed to be managed at the level of us.
00:50:23.827 --> 00:50:24.108
Number one.
00:50:24.108 --> 00:50:34.289
Number two in the BIM execution plan that I referenced earlier, it clearly outlined that the general contractor was responsible for coordinating and coordinating laser scans and clashes.
00:50:34.289 --> 00:50:38.940
So it was their responsibility to make sure that clashes had been detected.
00:50:38.940 --> 00:50:48.012
Gc was not wanting to take that responsibility and the subcontractor was not wanting to push that responsibility onto the GC to protect the relationship between the sub and the GC.
00:50:49.398 --> 00:50:58.612
So again it was a conversation of will dev designs ultimately pay for that because of this relationship that needed to be protected at the GC and the sub level.
00:50:58.612 --> 00:51:33.228
And I noticed the subcontractor leaving out and I spoke at many different levels up to the president of that subcontractor, and ultimately we had some in-depth conversations and we both got ourselves to lean back in and ultimately settled, based on the relationship, at a no cost settlement where we, even though contractually I think we would have won, we did want to avoid the cost of litigation and so we didn't pursue that and we just took both costs out of our straps, so all of our costs covered and moved on.
00:51:33.228 --> 00:51:37.280
And that's the relationship management side.
00:51:37.280 --> 00:51:42.502
And so a takeaway from this is look for the red flags and communication breakdowns.
00:51:42.502 --> 00:51:47.159
Maintain strong communication and partnership focus.
00:51:47.159 --> 00:52:01.603
Also, we learn to be proactive and draw upon resources like the brokers and legal community Companies and counsel and then document, how others react and put them on notice in a professional relationship and then relationship oriented manner.
00:52:02.393 --> 00:52:10.721
So, even as our clients were leaving out, we had to lean into that relationship to help them feel safe and secure that we are still working with them towards the ultimate goal.
00:52:10.721 --> 00:52:20.398
And so, just to wrap it all up together, if you remember, on the first slide I let you know that I had educated me about the two most important things to avoid litigation.
00:52:20.398 --> 00:52:22.605
It's about documentation and communication.
00:52:22.605 --> 00:52:24.072
So you see both of those outlined here.
00:52:24.072 --> 00:52:24.914
It's a case study.
00:52:24.914 --> 00:52:27.905
I want to thank you all for so much for your time.
00:52:27.905 --> 00:52:38.315
Just as a summary, bim Designs helps visualize the architect's and the engineer's original vision and provides the visual representation to our clients for their review and feedback.
00:52:38.315 --> 00:52:56.175
We avoid critical field misses and change orders to achieve clarity on project installation and through building information modeling, each project is assisted in avoiding possible litigation due to lack of documentation, communication, planning and visibility, and I want to thank you all so much for your time.
00:52:56.175 --> 00:52:59.728
Thank you very much.