Projects don't blow up in one big moment. They drift. The master schedule says one thing, the job site is doing another, and nobody finds out until somebody walks into the Monday meeting and starts shouting. This week I sat down with Carlos Carvalho of Aphex, calling in from London. Carlos started …

Nuclear Visibility

· अनुलिपि
Every project management software out there promises "real-time visibility." Hussain Arwani was managing 15 to 20 nuclear construction projects at once, and he'll tell you straight: he didn't have it. When the boss asked for a status, the honest answer was "let me get back to you." So he built M…
Thirty-five years in this business and I've never seen this career path: DARPA robotics, then years leading Amazon's robot arms that pick and pack everything you order, then… go build houses. Felipe Polido, co-founder and head of technology at Reframe Systems, did exactly that. The plans an arch…

Autonomous Excavators

· अनुलिपि
There's an excavator loading trucks on a live job site right now with nobody in the cab. Not a demo. Not a parking lot test. A paying job with 1.2 million yards of dirt to move, and that's just phase one. Rachael Ferrera leads innovation at Zachry Construction. Zachry, Sundt Construction and Cham…

The New Age of Power

· अनुलिपि
Everybody thinks you plug these AI chips in like a toaster, flip the switch, and off it goes. It doesn't work that way. The new AI chips don't pull steady power. They spike and drop many times a second. Michael Wood III of DG Matrix tells me that at big-campus scale, those swings are cracking tur…