The INENSUS team introduces ELECTR!FY, a real-data simulation game that allows players to run a virtual mini-grid company and experience the real-world trade-offs operators face every day. Stepping into the role of a mini-grid CEO, players navigate decisions around tariffs, site selection, staffing, digitisation, and financing—balancing profitability with customer satisfaction.
The episode explores how ELECTR!FY addresses talent gaps in the sector, challenges common misconceptions among policymakers and investors, and provides a hands-on learning tool for entrepreneurs, regulators, financiers, and mini-grid companies alike. By modeling real factors such as foreign exchange risk, diesel price volatility, demand elasticity, and clustering effects, the game offers a practical lens into what it truly takes to scale sustainable mini-grid businesses.
Play free of charge under the following link: Minigrid Game
LinkedIn: https://www.linkedin.com/company/inensus-gmbh/mycompany/
Visit www.inensus.com for more info.
הראה הערות 🔗
תעתיק 🔗
00:00:15.119 --> 00:00:18.640
We were there when mini-grid regulation was established.
00:00:18.640 --> 00:00:25.679
When financial transactions were closed, we saw new technology thrive and companies fail.
00:00:25.679 --> 00:00:28.480
This is where we tell the stories.
00:00:28.480 --> 00:00:30.800
This is where we discuss the future.
00:00:30.800 --> 00:00:34.640
The mini-grid business, powered by INENSUS.
00:00:36.159 --> 00:00:37.280
Hello, Vanessa.
00:00:37.280 --> 00:00:38.479
Hi, Nico.
00:00:38.479 --> 00:00:45.359
We're talking about Electrify, the mini-grid business game, which INENSOS developed.
00:00:45.359 --> 00:00:49.840
And I think we should start with where we're coming from.
00:00:49.840 --> 00:01:01.200
We saw over the last few years that uh there's a lack of um kind of high potential, high-quality staff in the sector.
00:01:01.200 --> 00:01:17.439
And we believe that we need to attract more high potentials, excellent African entrepreneurs, excellent university graduates to fill roles in the mini-grid companies' management levels.
00:01:17.760 --> 00:01:18.799
Yes, that's true, Nico.
00:01:18.799 --> 00:01:24.640
We notice in the sector that there is an abundance of international professionals.
00:01:24.640 --> 00:01:29.359
And we ask ourselves, where are all the African potentials?
00:01:29.519 --> 00:01:30.719
We need to see more of them.
00:01:30.719 --> 00:01:41.599
And my perception is that these high potentials graduating from universities or young professionals, they look at the sector and say, Well, there's no money to be made there.
00:01:41.599 --> 00:01:45.680
I don't want to go into a sector that is just after impact.
00:01:45.680 --> 00:01:48.799
I want to go somewhere where I can make a living.
00:01:48.799 --> 00:01:54.400
I want to go somewhere where there's good opportunity for a highly paid career.
00:01:54.400 --> 00:01:58.560
And at the moment, the mini-grid sector doesn't look like that.
00:01:58.560 --> 00:01:59.760
We need to change it.
00:01:59.760 --> 00:02:00.879
We need to change it.
00:02:00.879 --> 00:02:06.640
And uh I believe that there is potential in the mini-grid sector to meet that demand.
00:02:06.640 --> 00:02:07.760
Absolutely.
00:02:07.760 --> 00:02:15.599
And this is why we said we need a tool to communicate what potential there is in the mini-grid sector.
00:02:15.599 --> 00:02:28.080
We need to show people within the shortest time frame they have, give them a deep insight into what the mini-grid sector and what mini-grid companies are all about.
00:02:28.080 --> 00:02:31.840
And here it is electrify the mini-grid business game.
00:02:31.840 --> 00:02:33.599
That's what we developed.
00:02:33.599 --> 00:02:35.120
So that is one thing, right?
00:02:35.120 --> 00:02:49.520
And then another is um regulators, regulators, governments, ministries of energy, they often have an understanding of the mini-grid sector and mini-grid companies that is not quite realistic.
00:02:49.520 --> 00:02:58.560
Just because they have never acted as uh a mini-grid company CEO, they have never actually experienced what the challenges are like.
00:02:58.879 --> 00:03:11.840
Yeah, we also often see in the sector that they want to provide smaller tariffs, thinking that people living in the communities do not really have the ability to pay.
00:03:11.840 --> 00:03:19.680
So there is a mismatch in understanding between the government's perspective and the mini-grid operators.
00:03:20.000 --> 00:03:20.240
Yes.
00:03:20.240 --> 00:03:25.439
And at the same time, if they increase the tariffs a little bit, mini-grid companies could be profitable.
00:03:25.439 --> 00:03:30.080
Mini-grid companies under this profitability could then acquire additional finance.
00:03:30.080 --> 00:03:38.479
And this additional finance would help them expand mini-grid electrification and minigrid rollout across the country very fast.
00:03:38.479 --> 00:03:44.080
But smaller tariffs actually retard the whole expansion.
00:03:44.080 --> 00:03:53.280
And then there's a third group which has probably some misperceptions about mini-grids, and that is financiers and investors.
00:03:53.280 --> 00:04:02.000
Well, oftentimes, financiers and investors don't understand the mini-grid sector the way they should to invest into a company.
00:04:02.000 --> 00:04:22.800
Of course, they can look into financial models and plans and everything, and they can look into historic data and so on, but all that data doesn't show them what decisions need to be taken, what they need to look for in a mini-grid CEO, what the right villages to be selected may look like.
00:04:22.800 --> 00:04:27.199
And that is exactly what we now want to change with this game.
00:04:27.199 --> 00:04:36.000
And we want all these three sector stakeholder groups to play this game and learn about the mini-grid sector and understand.
00:04:36.000 --> 00:04:45.920
And we hope that this will, after all, trigger communication, conversations between these groups that will be beneficial to the sector and help the sector grow.
00:04:45.920 --> 00:04:50.879
So now, Vanessa, what is Electrify the mini-grid business game all about?
00:04:51.279 --> 00:05:12.959
Electrify is a simulation of a mini-grid company where uh the player actually gets a chance to step into the shoes of a mini-grid CEO and gets to take all the decisions that affect the community, such as selecting tariff levels, digitizing the activities, acquiring equity and that.
00:05:12.959 --> 00:05:24.720
And the main goal is for the player to have the highest value of shares at the end of the game and make its mini-grid company profitable.
00:05:24.959 --> 00:05:32.879
Yeah, it's difficult to explain in a podcast without video what a video game may actually feel and look like.
00:05:32.879 --> 00:05:34.800
But let's try, right, Vanessa?
00:05:34.800 --> 00:05:46.560
Like we've played a lot, and um this game is basically on maximizing the profitability of your mini-grid company, right?
00:05:46.560 --> 00:05:54.560
As a player, there is a share value calculation based on the profitability of the company.
00:05:54.560 --> 00:06:01.360
And the more profitable you are, the more profit you make, the higher your share value.
00:06:01.360 --> 00:06:05.439
You can take decisions as a CEO on many things.
00:06:05.439 --> 00:06:09.199
And all these can make or break your company.
00:06:09.199 --> 00:06:14.639
One individual wrong decision can basically run you into bankruptcy, then the game is over.
00:06:14.639 --> 00:06:15.519
Over.
00:06:15.519 --> 00:06:17.279
Yeah, exactly.
00:06:17.279 --> 00:06:24.000
So, what decisions should we mention here that uh a mini-grid company player should take?
00:06:24.399 --> 00:06:27.839
Well, there are important factors to consider.
00:06:27.839 --> 00:06:29.920
One is site selection.
00:06:29.920 --> 00:06:57.759
Like we need to consider sites that are closer to major um hubs to have the highest number of PUEs that would then be able to consume electricity during daytime and also have fixed revenues, also would potentially boost income uh within the community, and then we can have like a good overview of revenue growth.
00:06:58.079 --> 00:06:59.120
Yeah, exactly.
00:06:59.120 --> 00:07:02.560
And you can take decisions on digitization.
00:07:02.560 --> 00:07:04.240
Do you want to go for smart meters?
00:07:04.240 --> 00:07:06.000
Do you want to go for prepaid meters?
00:07:06.000 --> 00:07:08.160
Do you want to go for remote monitoring?
00:07:08.160 --> 00:07:11.839
Do you want to introduce a ticketing system for customer service?
00:07:11.839 --> 00:07:13.519
All these kinds of things.
00:07:13.519 --> 00:07:17.600
Um, you need to take decisions on your number of staff.
00:07:17.600 --> 00:07:25.680
And I think that is one of the aspects that many mini-grid companies struggle with because they do both.
00:07:25.680 --> 00:07:37.120
They do construction and implementation of new mini-grids and mini-grid operation at the same time in the same company under the same management, and usually with the same stuff.
00:07:37.120 --> 00:07:42.560
So, therefore, they design their staff size and number for the construction times.
00:07:42.560 --> 00:07:46.560
But when construction is over, basically what do they do with their staff, right?
00:07:46.560 --> 00:07:51.040
Oftentimes they just keep the staff, but that reduces their profitability.
00:07:51.040 --> 00:07:59.519
And with that reduced profitability, they cannot convince investors to invest and provide the finance they need to scale faster.
00:07:59.519 --> 00:08:09.920
So, therefore, yeah, um staff management and staff level management is one of the core features here in this game.
00:08:09.920 --> 00:08:11.279
But there are many more.
00:08:11.279 --> 00:08:18.720
You set tariffs, PUE tariffs and residential tariffs, and you acquire equity and debt.
00:08:18.720 --> 00:08:25.360
Equity and debt is available only once you can show that you can run a profitable company.
00:08:25.360 --> 00:08:31.199
If you're unprofitable, then well, no chance to actually acquire any finance, like in real life.
00:08:31.199 --> 00:08:34.480
There is interim finance available for grants.
00:08:34.480 --> 00:08:42.159
So grants come usually as performance-based grants exposed, like results-based funding or results-based finance.
00:08:42.159 --> 00:08:48.159
And uh, in the meantime, you can pre-finance that grant to a certain extent.
00:08:48.159 --> 00:08:50.879
Then you can size your systems, right?
00:08:50.879 --> 00:08:59.919
You can say, I want a renewable fraction of 100%, or I want a renewable fraction of 70-50%, whatever, meeting the remaining demand with diesel.
00:08:59.919 --> 00:09:02.399
And that brings us to all the assumptions.
00:09:02.399 --> 00:09:08.879
Let me quickly run through the assumptions, and then you can also come in, Vanessa, and explain other assumptions.
00:09:08.879 --> 00:09:20.559
So, for example, we are taking care of foreign exchange risk, diesel price development over time, price elasticity of demand when it comes to tariff setting.
00:09:20.559 --> 00:09:22.720
We consider economies of scale.
00:09:22.720 --> 00:09:31.360
So if you import larger numbers and deploy larger numbers of systems, your specific price of the individual component gets reduced.
00:09:31.360 --> 00:09:37.440
We have impacts of digitization on staff requirements.
00:09:37.440 --> 00:09:39.919
We consider customer satisfaction.
00:09:39.919 --> 00:09:56.639
So if electricity customers are unsatisfied because your staff level is too low or your system doesn't deliver electricity reliably because the system is too small or whatever, then the willingness to pay and your revenue after all will go down.
00:09:56.639 --> 00:10:15.519
We calculate the average revenue per user on a continuous basis, and we basically simulate the whole game over 20 years, like the whole mini-grid company over 20 years, and those that have the highest share value in their company will rank highest on the leaderboard.
00:10:15.519 --> 00:10:16.240
Right?
00:10:16.240 --> 00:10:29.279
And we have seen players who actually turned $1 million of starting capital into $100 million, $300 million over 20 years.
00:10:33.840 --> 00:10:44.399
Yeah, definitely it's a very interesting game to play since you get to see how your decision making affects your profitability in real time.
00:10:44.399 --> 00:10:50.879
And uh, you've already mentioned a few of the assumptions we make in the game.
00:10:50.879 --> 00:11:13.759
And I wanted to just jump back on the relationship between the number of staff and the digitization, because I think it's interesting that you mentioned that, since we can also see in real time in the game how digitization, like adopting ticketing, for example, would help reduce the amount of staff by a certain percentage.
00:11:13.759 --> 00:11:21.840
So these additions, I would say, that a mini-grid company could adopt that would on the long run reduce its OPEX.
00:11:21.840 --> 00:11:22.960
Exactly.
00:11:23.200 --> 00:11:28.000
Yeah, and another effect that I have not mentioned yet, is uh clustering of sites.
00:11:28.000 --> 00:11:33.600
Like if you select sites all across the country, then your travel costs will be very high.
00:11:33.600 --> 00:11:35.440
We could we calculate travel costs.
00:11:35.440 --> 00:11:39.360
Yeah, meaning that uh your profitability is probably lower.
00:11:39.360 --> 00:11:50.240
If you cluster properly, if you select large sites, if you select sites that are close to trade-ups, your demand, electricity demand will increase, your ARPU will increase quite rapidly.
00:11:50.240 --> 00:11:52.559
That will help you become profitable.
00:11:52.559 --> 00:11:57.200
We're selection of sites is definitely the core of any mini-grid company.
00:11:58.000 --> 00:11:59.039
Yeah, definitely.
00:11:59.039 --> 00:12:00.000
I agree.
00:12:00.000 --> 00:12:04.159
Also, for the sites, the data used from uh Vida.
00:12:04.159 --> 00:12:09.039
So the sites actually have their own characteristics.
00:12:09.039 --> 00:12:15.360
You see the wealth indication, for example, you mentioned the distance to trade hog and all of this.
00:12:15.360 --> 00:12:33.279
So as a player, you kind of already have a feel of what the site could be like, how maybe profitable in terms of number of connections, in terms of the demand overall per year that the site would consume.
00:12:33.279 --> 00:12:47.120
And also you mentioned the renewable energy fractions where you get to choose if you want more diesel, if you want more renewable energies, if you want to oversize your system to account for potential growth.
00:12:47.120 --> 00:12:52.240
All of this you can see how it affects your investment, it affects your system size.
00:12:52.240 --> 00:13:01.679
And also talking about diesel, like we have fluctuating prices of diesel overall uh during the simulation time, so the 20-year simulation time.
00:13:01.679 --> 00:13:10.799
And you also see how the rise and fall in diesel, if you have a highest share of diesel, would then affect your overall profitability.
00:13:10.799 --> 00:13:12.320
Yeah, exactly.
00:13:12.559 --> 00:13:22.320
And um, what we need to say is that this game is currently simulating using the Nigerian data.
00:13:22.320 --> 00:13:25.200
If you go there, you will see a map.
00:13:25.200 --> 00:13:33.759
A map of Nigeria with thousands of dots, and each of these dots is an actually unelectrified village.
00:13:33.759 --> 00:13:43.840
And that makes it most exciting from my point of view, because it's not some artificial game where you play in an artificial environment.
00:13:43.840 --> 00:13:47.840
It's basically real data that you're playing with.
00:13:47.840 --> 00:13:54.320
It is actual village data, and we try to keep it as close as possible to reality.
00:13:54.320 --> 00:14:07.840
Uh, we are using the data from the Darius planning activities that we had supported earlier a few years back, and we now converted it into this game.
00:14:07.840 --> 00:14:12.720
Well, similar data is available nowadays uh for other countries also.
00:14:12.720 --> 00:14:20.559
And the main player here is of course Vida, uh, which collects all these data, and um, thanks a lot to Vida.
00:14:20.559 --> 00:14:25.039
We can use this data for our game.
00:14:25.039 --> 00:14:28.320
So, yeah, it's almost like in real life.
00:14:28.320 --> 00:14:30.399
Yeah, almost yeah.
00:14:30.399 --> 00:14:39.120
Vanessa, let's look into the use cases of the game a little bit more closely.
00:14:39.120 --> 00:14:46.240
So we already talked about the three types of user groups that we foresee.
00:14:46.240 --> 00:15:00.559
On the one hand, the regulators and policymakers, on the other hand, the entrepreneurs and graduates from university, and the third is investors and financiers.
00:15:00.559 --> 00:15:04.879
And I would say the fourth is, after all, the mini-grid companies themselves.
00:15:04.879 --> 00:15:09.919
Let's start with the mini-grid companies themselves, and then maybe we can come back to the other three.
00:15:09.919 --> 00:15:16.320
So, mini-grid companies nowadays actually train their management staff on the job.
00:15:16.320 --> 00:15:31.440
You hire a person, and there is not much experience in mini-grid management in the talent market, you basically just onboard that person and give him exposure to the challenges while he's actually taking decisions.
00:15:31.440 --> 00:15:36.639
Which may not be such a good idea in the long run.
00:15:36.639 --> 00:15:40.159
Maybe it's better to provide some upfront training.
00:15:40.159 --> 00:15:56.240
And now with this simulation that we developed, any mini grid company could just pick a talent, expose her or him to the game, tell that person, play.
00:15:56.240 --> 00:16:12.399
If you're unsuccessful, come back to me, ask me questions why you're not succeeding, I will tell you how to improve, and then step by step make that talent understand what it actually takes to run a mini-grid company successfully.
00:16:12.399 --> 00:16:18.480
So I believe that this could change the way staff training is happening in mini-grid companies.
00:16:18.879 --> 00:16:27.279
Yeah, definitely I agree with you, Nico, also because the game gives you the opportunity to actually lose.
00:16:27.279 --> 00:16:34.879
And by that I mean that we know that when we're playing a game, we always want to have the highest possible score.
00:16:34.879 --> 00:16:40.720
But in real life, we know that we might be confronted to unforeseen circumstances.
00:16:40.720 --> 00:16:50.879
So, for example, by selecting the community with the highest number of customers, you are sure that you have a substantial demand.
00:16:50.879 --> 00:17:10.000
Whereas you could also decide to test what happens if you select a community with a low number of customers and try to play around with the parameters to eventually see how far you can go with this community, if you can eventually make it profitable at some point or not.
00:17:10.000 --> 00:17:13.839
And if you can't, what are other things to play around with?
00:17:13.839 --> 00:17:26.799
So it's not just about winning the game or playing the game for the pleasure of it, it's also a learning experience to know what to do when things don't really align with how you want them to go.
00:17:26.960 --> 00:17:29.119
So yeah, that's very nice indeed.
00:17:29.119 --> 00:17:40.880
And what we have to say here is that in this simulation of the Nigerian mini-grid market, not only MetroGrid strategies can be successful.
00:17:40.880 --> 00:17:54.799
Um, the Nigeria Daris program provides higher ground levels for smaller villages, and that makes smaller villages also financially feasible to a certain extent.
00:17:54.799 --> 00:18:00.319
But of course, we must admit that MetroGrid strategies are always the most profitable ones.
00:18:00.319 --> 00:18:04.720
But yeah, you can try this out, you can test it and then see.
00:18:04.720 --> 00:18:11.599
And also for investors, this can be an opportunity to see what strategies they want to promote.
00:18:11.599 --> 00:18:15.440
Do they want to go more for impact-driven electrification?
00:18:15.440 --> 00:18:19.759
Do they want to go more for profit-driven electrification?
00:18:19.759 --> 00:18:21.039
What is their strategy?
00:18:21.039 --> 00:18:23.680
What risks are they actually taking?
00:18:23.680 --> 00:18:26.319
And which companies do they want to work with?
00:18:26.319 --> 00:18:31.359
They can find out for themselves by playing this game, learning more about how the sector works.
00:18:31.680 --> 00:18:32.720
Yeah, exactly.
00:18:32.720 --> 00:18:48.160
And also um having an idea probably of the types of investments and subsidies that would be required to electrify either one or the other communities where one is impact-driven or one is business driven.
00:18:48.160 --> 00:18:50.480
So, yeah, I guess they're gonna review.
00:18:50.799 --> 00:18:56.559
After all, the aim would be to create or improve the investor confidence.
00:18:56.720 --> 00:18:57.039
Yeah.
00:18:57.279 --> 00:19:04.960
To make sure that investors know what they're actually investing in, which at the moment may not be the case in all cases.
00:19:04.960 --> 00:19:16.640
So, all right, now we've talked about mini-grid companies as players or company staff as players, we've talked about graduates a lot, and we talked about investors and financiers.
00:19:16.640 --> 00:19:28.240
Now let's touch upon policy and regulation a little bit and how regulators and policymakers can benefit from this game.
00:19:28.640 --> 00:19:29.279
Yeah.
00:19:29.279 --> 00:19:41.759
Government and policy regulators are not usually aware of the realities of the terrain, if I can put it that way, of the environment.
00:19:41.759 --> 00:19:51.680
And there is quite a mismatch between what they expect as regulators and what uh mini grid operators actually experience on ground.
00:19:51.680 --> 00:19:59.519
So playing this game, which is, as we mentioned, based on real data and can actually simulate.
00:19:59.519 --> 00:20:10.160
real life events can help regulators and government entities understand actually the realities from uh an operator's point of view.
00:20:10.160 --> 00:20:34.880
And things like tariff settings, which are usually on the lower end and uh make it harder for the operators to actually reach break even, could then be pushed a little bit higher without affecting so much the customers and still making the mini grid business profitable while keeping good customer satisfaction.
00:20:35.200 --> 00:20:47.920
Yeah and there is still a subject that people think they know but oftentimes they don't really factor in the effects of price elasticity of demand.
00:20:47.920 --> 00:20:55.759
And I think this is another unique opportunity here to really experience what price electricity of demand actually means?
00:20:55.759 --> 00:21:01.440
Like what does it mean if you increase your tariff for residential customers?
00:21:01.440 --> 00:21:04.400
What does it mean to increase your tariff for productive users?
00:21:04.400 --> 00:21:15.920
What does it mean to increase your tariff for productive users beyond a level where diesel or petrogenerators could generate electricity at similar cost, even at lower cost?
00:21:15.920 --> 00:21:25.119
What does it mean to increase tariff levels to a range where the solar home system may be more affordable?
00:21:25.119 --> 00:21:49.119
These kind of things can be experienced here in this mini grid game because we put the assumptions from all our learnings over the last 20 years into this and seeing how it all plays out and how one aspect affects the other is actually a learning experience even for me right when playing the game I thought okay wow where is this effect coming from now?
00:21:49.119 --> 00:21:50.720
Where is it coming from?
00:21:50.720 --> 00:21:57.279
And I in some cases I even needed to think some minutes about okay hmm why did I lose what happened?
00:21:57.279 --> 00:22:18.319
And then after a few minutes I said ah okay well it was I don't know price elasticity or it was too much or not enough staff or it was a digitization decision that I took wrongly or it was the selection of sites or it was simply taking the wrong finance at the wrong point in time.
00:22:18.319 --> 00:22:22.400
Like there are so many mistakes you can make as a mini grid company CEO.
00:22:22.400 --> 00:22:27.920
But yeah you can learn how to overcome and to avoid these mistakes with this game.
00:22:27.920 --> 00:22:29.759
Yeah.
00:22:29.759 --> 00:23:02.880
Good now recently we've talked to World Bank SMAP AFDB CIFA and GetPro which is running getInvest and getTransform and they all really like the idea of this game and they like the game itself and they like playing it and they like the opportunities that this game brings along and they said they would love to support it and make it something that people actually use to the benefit of the sector.
00:23:02.880 --> 00:23:08.400
And one of the ideas that were discussed was to run a competition.
00:23:08.400 --> 00:23:31.680
A competition between players and there may be several groups maybe a group for professionals from mini grid companies there may be a group for university graduates and entrepreneurs that are new to the sector there may be a group for government and regulators and they may be a group for investors and financiers.
00:23:31.680 --> 00:24:07.359
And each of these groups may play with their respective perspective and maybe even we come forward with some group specific challenges that these groups may need to perform and then after all we will find those who perform best and those best performing players may potentially get a price of whatever that may be a service from getInvest or from AMAP 2.0 or some support for policymakers through SMAP or something like that.
00:24:07.359 --> 00:24:24.559
Let's see that that has not been decided yet we're all thinking about it we're brainstorming still but it's very likely that something like this will be developed and uh yeah to all our listeners get prepared maybe you want to take part in that competition.
00:24:24.880 --> 00:24:37.920
Yeah it would even be interesting to have a group with all three sectors playing together and seeing how uh each decision that it decides to make affects the overall results.
00:24:38.240 --> 00:25:03.680
Indeed yeah yeah very cool idea all right with that outlook let's jump into some recordings from an Inenzus internal electrify battle okay once I get the draw yeah are you learning I mean I'm I'm learning a lot from the side you're going bankrupt you're going bankrupt Silva you're going bankrupt yeah what shall I do?
00:25:03.680 --> 00:27:34.799
Well at the moment there's no option anymore what so I'm gonna post the game until someone else crash before me thanks everyone because I've been bankrupt already three times so without telling us without telling us now I see Emma you are cash flow positive congratulations thank you yeah and 900 connections you got an uh equity and debt offer what are you taking okay so if I look at the offer whoa what you're doing 57 dollar cents per kilowatt hour for productive users that's crazy that's what I charge keeping not 100% customer service but up to 80% customer satisfaction all right all right if the customers are paying hey who cares who cares there's no regulator here wow Hogar has a super cluster developed around Sokoto yeah 30 connections uh connections 6000 yeah but all small all small towns are all small villages uh jacob is cashing in grants is that a good strategy jakob for now yes let's see let's see how sustainable it will be oh 24 cents per kilowatt hour for households that's very kind of you yeah I'm uh very social many now you have that debt offers tiptoe yeah does that sound attractive to you it's a bit too the interest is a bit too high for the Nigerian one is only five years so I'm thinking if I should accept that or not to fire some people so customer satisfaction is going down revenue is even further going down but the cash flow is not going up yeah it's going up and also I would craft them yeah bankruptcy three months re to recover okay what's your thing wow Jacob you have one two three four five six villages under construction and your bank account is at bankrupt I'll try to Emma if you if you were a banker would you give a loan to someone who has a negative cash flow?
00:27:35.039 --> 00:28:30.960
Of course not alright oh Thomas game over oh what was what went wrong Thomas I think I got impatient and went yeah spent too much money yeah impatience is never good now Holger you're starting again yeah so Sokoto is challenging Sokoto is indeed very challenging game complete now you can put your name I did it this episode of the Mini Grid Business has been brought to you by INENSUS your one-stop shop for sustainable mini grids for more information on how to make mini grids work visit our website inensus.com or contact us through the links in the show notes the mini grid business powered by INENSUS