TUNGKOL SA EPISODE NA ITO

Ingles
Estados Unidos
tahasang nilalaman

KOPYA NG SALIN 🔗

I-SEARCH ANG MGA NAKARAANG EPISODE

I-search ang mga nakaraang episode ng The ConTech Exec .

IBA PANG MGA EPISOD SA PODCAST NA ITO

Everybody thinks you plug these AI chips in like a toaster, flip the switch, and off it goes. It doesn't work that way. The new AI chips don't pull steady power. They spike and drop many times a second. Michael Wood III of DG Matrix tells me that at big-campus scale, those swings are cracking tur…
Projects don't blow up in one big moment. They drift. The master schedule says one thing, the job site is doing another, and nobody finds out until somebody walks into the Monday meeting and starts shouting. This week I sat down with Carlos Carvalho of Aphex, calling in from London. Carlos started …
Every project management software out there promises "real-time visibility." Hussain Arwani was managing 15 to 20 nuclear construction projects at once, and he'll tell you straight: he didn't have it. When the boss asked for a status, the honest answer was "let me get back to you." So he built M…
There's an excavator loading trucks on a live job site right now with nobody in the cab. Not a demo. Not a parking lot test. A paying job with 1.2 million yards of dirt to move, and that's just phase one. Rachael Ferrera leads innovation at Zachry Construction. Zachry, Sundt Construction and Cham…
Thirty-five years in this business and I've never seen this career path: DARPA robotics, then years leading Amazon's robot arms that pick and pack everything you order, then… go build houses. Felipe Polido, co-founder and head of technology at Reframe Systems, did exactly that. The plans an arch…
Paunawa: Ang podcast at artwork na naka-embed sa page na ito ay mula sa Robert Zimmerman, na pag-aari ng may-ari nito at hindi kaakibat o ineendorso ng Listen Notes, Inc.