In this episode of the Engineering Influence podcast, recorded live from the ACEC Fall Conference in New Orleans, host [Host Name] is joined by Darren Black, the National Practice Leader at Risk Strategies. Together, they delve into the innovative approach of Progressive Design Build and its potential impact on the engineering industry.
Darren explains how this relatively new project delivery method addresses the challenges faced in large-scale civil infrastructure projects. By ensuring that guaranteed maximum prices are set at a more advanced stage of design completion, Progressive Design Build aims to mitigate risks, reduce uncertainties, and enhance project outcomes.
The episode features insights into an upcoming panel discussion that will explore this topic further, with contributions from industry experts like David Hadam, Donna Hunt, and representatives from Kiewit and Gresham Smith. Darren also touches on the implications for professional liability and the insurance market, providing a comprehensive overview of how this approach could shape the future of engineering projects.
NÄYTÄ HUOMAUTUKSIA 🔗
TRANSKRIPTIO 🔗
00:00:00.000 --> 00:00:05.200
Music.
00:00:05.044 --> 00:00:08.784
Welcome to Engineering Influence, a podcast from the American Council of Engineering Companies.
00:00:09.104 --> 00:00:12.504
We're coming to you live from our annual talk conference in New Orleans.
00:00:12.764 --> 00:00:16.764
And I'm very pleased to be joined today by Darren Black, the National Practice
00:00:16.764 --> 00:00:20.344
Leader at Risk Strategies. Darren, welcome to the show. Thanks for having me.
00:00:20.824 --> 00:00:24.244
In terms of progressive design, Bill, we were talking a little bit before you
00:00:24.244 --> 00:00:26.764
came on the show, and you mentioned this panel that's coming up.
00:00:26.824 --> 00:00:29.944
Can you talk to that and give our viewers a little bit of information about
00:00:29.944 --> 00:00:33.364
what that looks like, who's going to be involved with that panel?
00:00:33.764 --> 00:00:38.764
Sure. Yeah, progressive design build is a relatively new alternative project
00:00:38.764 --> 00:00:44.104
delivery method that tries to speak to some of the major issues created,
00:00:44.404 --> 00:00:46.864
particularly on big, horizontal,
00:00:47.184 --> 00:00:52.624
heavy, civil infrastructure type projects, where many of those design builders
00:00:52.624 --> 00:00:54.464
had basically pulled out of that market.
00:00:54.464 --> 00:00:59.084
Our client constituency, much more engineering and architecturally driven.
00:01:00.144 --> 00:01:04.764
They're concerned about design build generally and more concerned the larger
00:01:04.764 --> 00:01:08.044
the project because those design builders.
00:01:08.044 --> 00:01:13.824
And in a nutshell, the issue is, particularly the larger, the more complex the
00:01:13.824 --> 00:01:15.544
project, the bigger the problem becomes,
00:01:16.104 --> 00:01:22.404
but owners were insisting on getting GMPs from the design builder at as little
00:01:22.404 --> 00:01:24.984
as 30% completion of the construction documents.
00:01:25.104 --> 00:01:28.144
And at that point, there's so many unknowns.
00:01:28.984 --> 00:01:34.284
And, you know, project outcomes and objectives aren't well defined. Neither is the scope.
00:01:35.424 --> 00:01:42.244
And so progressive design build is a more integrated delivery method within
00:01:42.244 --> 00:01:50.024
which the owner sits with constructor designer and it works in phases and the
00:01:50.024 --> 00:01:53.544
guaranteed maximum price isn't delivered until, say, 60%.
00:01:53.544 --> 00:01:59.204
So majority of the design is completed and hopefully that will alleviate because
00:01:59.204 --> 00:02:01.744
if you're doing it 30, they're going to be cost overruns.
00:02:01.744 --> 00:02:05.264
And when you're talking about huge projects, they tend to be huge,
00:02:05.304 --> 00:02:13.724
and the design builder has historically tended to look to the design team as its contingency.
00:02:14.622 --> 00:02:22.022
Which had implications, among which were the drying up of the project-specific
00:02:22.022 --> 00:02:23.482
professional liability market.
00:02:23.722 --> 00:02:28.742
And it's our hope that progressive design build will alleviate some of the concerns
00:02:28.742 --> 00:02:32.842
on the part of the underwriting community, as well as bring back more competitiveness
00:02:32.842 --> 00:02:35.802
because so many of those large design build firms just said,
00:02:35.822 --> 00:02:37.242
there's too many unknowns,
00:02:37.442 --> 00:02:39.602
too much business uncertainty, too much risk.
00:02:39.742 --> 00:02:42.622
And so there wasn't much competition for those projects, which,
00:02:42.762 --> 00:02:46.782
you know, with infrastructure money sitting out there, hopefully Progressive
00:02:46.782 --> 00:02:49.662
will solve a lot of solutions, will bring a lot of solutions.
00:02:49.662 --> 00:02:54.182
And we put together a panel that will include David Hadam, kind of the godfather
00:02:54.182 --> 00:02:58.322
from a legal perspective in terms of teaming agreements on big tunneling and
00:02:58.322 --> 00:03:02.162
roads and bridges projects, head of Kiewit's infrastructure division,
00:03:02.602 --> 00:03:05.762
our own Donna Hunt, kind of representing the underwriting community,
00:03:05.982 --> 00:03:07.562
because until becoming a broker,
00:03:07.822 --> 00:03:13.122
she had served as an underwriter on large projects for I think two decades,
00:03:13.302 --> 00:03:16.542
probably, and then representing the engineering perspective will be the head
00:03:16.542 --> 00:03:18.382
of risk finance from Gresham Smith.
00:03:18.682 --> 00:03:22.862
So we've got a number of different perspectives that will be represented and
00:03:22.862 --> 00:03:25.462
we hope it'll drive some good conversation. Sure. Sure.
00:03:25.802 --> 00:03:30.582
So, you know, thinking about that, that process and you're saying 60%,
00:03:30.582 --> 00:03:33.242
right? Do you want to get there 60% of the growth?
00:03:34.374 --> 00:03:37.234
What what was saying i mean the starting of getting
00:03:37.234 --> 00:03:40.254
where it's like it just is the cost structure we're looking at and
00:03:40.254 --> 00:03:44.574
then you would get changes along the way this is a big shift i guess where i'm
00:03:44.574 --> 00:03:49.654
going it's a pretty big shift yeah yeah you you had less owner involvement design
00:03:49.654 --> 00:03:58.994
builder would sub out design services to a design team and design builder that's ultimately selected,
00:03:59.834 --> 00:04:02.954
with traditional design build is selected based on
00:04:02.954 --> 00:04:06.134
in large part on that gmp right at a
00:04:06.134 --> 00:04:09.214
time where it's very early in terms of the design development
00:04:09.214 --> 00:04:12.274
and again that's what brings about
00:04:12.274 --> 00:04:15.394
so much uncertainty and nobody really
00:04:15.394 --> 00:04:18.234
knows if that gmp is going to hold until you get much
00:04:18.234 --> 00:04:21.154
further into the cd process and
00:04:21.154 --> 00:04:24.154
the commitment on the part of owners to move towards progressive design
00:04:24.154 --> 00:04:27.674
build have that more integrated approach collaborative approach
00:04:27.674 --> 00:04:31.814
but the big thing again is to wait to
00:04:31.814 --> 00:04:34.934
reach a joint consensus as to
00:04:34.934 --> 00:04:40.274
what the guaranteed maximum price should be once the cds are a majority complete
00:04:40.274 --> 00:04:48.874
typically 60 plus percent do you think that's the shift are you coupled what
00:04:48.874 --> 00:04:52.694
does the future look like right is this going to become more of a stable within
00:04:52.694 --> 00:04:54.274
the industry or is this, hey.
00:04:55.354 --> 00:04:57.874
You said there's a lot of infrastructure money around, right?
00:04:58.094 --> 00:04:59.054
Yeah. Sitting there, we're waiting.
00:04:59.394 --> 00:05:04.014
Is this a way to unlock some of that in people's contracts?
00:05:04.374 --> 00:05:09.994
Yeah, those projects have to be led. It's our hope that particularly on the large, complex,
00:05:10.654 --> 00:05:17.294
projects that progressive design and build will facilitate less risky outcomes,
00:05:17.474 --> 00:05:22.054
more predictable outcomes with better defined objectives and scope
00:05:22.494 --> 00:05:29.734
and more mutual understanding the traditional design build delivery method was just a setup for.
00:05:30.574 --> 00:05:33.714
Antagonism if you will and that created issues in
00:05:33.714 --> 00:05:36.654
our industry when it came to professional liability with the
00:05:36.654 --> 00:05:40.194
drying up the hardening of that project specific market
00:05:40.194 --> 00:05:46.834
owners and design builders were insisting on engineering and architectural firms
00:05:46.834 --> 00:05:53.074
carrying much higher limits than they used to at a time when the insurance market
00:05:53.074 --> 00:05:56.754
was reducing available capacity at the same time.
00:05:57.394 --> 00:06:03.314
So hopefully, Progressive Design Build will give rise to a softening of that
00:06:03.314 --> 00:06:04.874
hard project market, and that
00:06:04.874 --> 00:06:09.894
will have implications beneficial for our clients as well. Sure, sure.
00:06:10.094 --> 00:06:14.354
So is there an entry point where you would introduce the Progressive Design
00:06:14.354 --> 00:06:19.974
Build? it's interesting it's my hope and I've had conversations with experts
00:06:19.974 --> 00:06:24.394
that come from different perspectives within the AEC community right um.
00:06:27.082 --> 00:06:32.242
The benefits of progressive design build can be seen on vertical construction as well.
00:06:34.182 --> 00:06:40.482
Now, the more onerous burden on the part of owners to be integrally involved
00:06:40.482 --> 00:06:45.622
in that phased process causes some people to say,
00:06:45.802 --> 00:06:50.042
look, if the upside is only a $50,000 savings, they're not going to do it.
00:06:50.042 --> 00:06:56.902
But there are obviously some very large, complex design and build jobs that
00:06:56.902 --> 00:07:04.102
other than just horizontal construction, and we've seen it successfully delivered in that market.
00:07:04.902 --> 00:07:11.642
Question is, will private owners take it up as frequently as we think public's grow? Right, right.
00:07:11.982 --> 00:07:15.842
So in terms of the citizen, going back to 6% of its build.
00:07:16.502 --> 00:07:20.262
Not 60% build. 60% construction document.
00:07:20.522 --> 00:07:26.062
So the design is 60% by yachting. Is the coordination that's required to have
00:07:26.062 --> 00:07:27.882
all the parties come back together? You're saying product owner.
00:07:28.162 --> 00:07:33.322
Is there any concern there or is it it's a pretty easy process once you get to that point, you know?
00:07:35.022 --> 00:07:42.422
The difficulty is in getting buy-in on the part of the parties to the agreement
00:07:42.422 --> 00:07:47.482
to collaborate, to make it a collaborative process and therefore eliminate
00:07:47.862 --> 00:07:53.382
more unknowns that have existed within the traditional design build delivery method,
00:07:54.562 --> 00:07:59.942
you've got the benefits of quote-unquote integrated project delivery right without
00:07:59.942 --> 00:08:07.222
the pretense that there is no need for risk allocation right people still have
00:08:07.222 --> 00:08:11.782
their responsibilities under the contract one to design one to build so on and so forth but,
00:08:12.342 --> 00:08:19.922
it is all about collaboration and mutual agreement in phases that will hopefully
00:08:19.922 --> 00:08:21.082
eliminate some of those unknowns.
00:08:21.422 --> 00:08:25.862
And I think the phasing part is really important here. So I think we'll go really
00:08:25.862 --> 00:08:27.602
deep into the progressive design build.
00:08:27.762 --> 00:08:31.762
Would you like to continue to answer it? Is there more information that if someone's
00:08:31.762 --> 00:08:35.922
listening to this or watching this podcast, they can get more information about this process?
00:08:36.242 --> 00:08:39.582
This program that I referenced, we're actually doing it to junction with ENR.
00:08:40.122 --> 00:08:43.522
And so it'll be actually delivered on their platform because it's more robust
00:08:43.522 --> 00:08:44.662
than what we could do internally.
00:08:46.401 --> 00:08:50.481
Risk-strategies.com. There will be plenty of information as it comes out,
00:08:50.681 --> 00:08:55.361
the program itself, and we will record it and make it available to anybody that can't make it live.
00:08:55.501 --> 00:08:58.321
But December 11th, I believe, is the date that's selected. Yeah.
00:08:58.921 --> 00:09:02.401
And make sure to drop us a line. We'll make sure to get it posted on our website as well.
00:09:02.601 --> 00:09:05.921
And we'll write a blog post about it and get it up so that our audience can
00:09:05.921 --> 00:09:08.141
certainly access it. I appreciate it. That would be wonderful.
00:09:08.661 --> 00:09:11.141
Is there anything else you'd like to cover while we have you here?
00:09:11.761 --> 00:09:16.761
No, it's an interesting time. You know, insurers are still citing social and
00:09:16.761 --> 00:09:20.241
economic inflation as having increased claims costs.
00:09:20.401 --> 00:09:23.021
That's one of the things I'll be doing in our rapid fire session tomorrow.
00:09:23.401 --> 00:09:28.341
But the fact of the matter is, is that our world is largely driven by professional liability.
00:09:28.561 --> 00:09:33.201
When we, that's what keeps engineering and architectural firms up at night.
00:09:33.921 --> 00:09:38.221
And we tend to handle all of the other coverage lines kind of ancillary to that
00:09:38.221 --> 00:09:41.781
because that's where they need advice and counsel, whether it's on workers and
00:09:41.781 --> 00:09:45.461
acquisitions or contracts or loss prevention, education.
00:09:46.141 --> 00:09:50.481
So I think mostly about professional liability, not that cyber and employment
00:09:50.481 --> 00:09:51.881
practices aren't important.
00:09:52.501 --> 00:09:58.041
But so it's funny, there are a number of insurers here that are certainly specialists
00:09:58.041 --> 00:10:05.281
and they continue to cite increased claims costs as necessitating increasing rates.
00:10:05.281 --> 00:10:08.661
If they're not going up 5%, they're going backwards.
00:10:08.981 --> 00:10:13.601
But the fact is, is that as respects the annual practice policies,
00:10:13.641 --> 00:10:16.401
as opposed to the project specific that we talked about earlier,
00:10:16.721 --> 00:10:20.521
there's enough competition in the market right now that good firms that are
00:10:20.521 --> 00:10:24.501
willing to really communicate what they're doing from a centralized risk management
00:10:24.501 --> 00:10:27.381
protocol perspective. That was a mouthful. I apologize.
00:10:27.801 --> 00:10:32.441
We're seeing rate decreases. We're seeing premiums go down. And this is the
00:10:32.441 --> 00:10:34.281
first year we've seen that in some while.
00:10:34.481 --> 00:10:38.141
So there's good news out there from firms when it comes to professional liability
00:10:38.141 --> 00:10:39.141
coverage. Oh, that's great.
00:10:39.321 --> 00:10:42.901
Yeah. So anytime you get a decrease in rates, I'd like to be able to do a good
00:10:42.901 --> 00:10:46.861
sign to shop around maybe if you're not sure and see what's up there.
00:10:47.421 --> 00:10:51.041
Well, Darren, thank you so much for joining the show and for attending Fall
00:10:51.041 --> 00:10:52.921
Conference and also being a sponsor, exhibitor.
00:10:53.101 --> 00:10:57.001
It means a lot to ACEC or the Council of Engineering Companies and all of our
00:10:57.001 --> 00:10:59.441
members. I really appreciate it. Thanks for having us here.
00:11:00.041 --> 00:11:04.741
This has been another episode of Engineering Influence podcast from the American
00:11:04.741 --> 00:11:06.661
Council of Engineering Companies. See you next time.
00:11:08.400 --> 00:11:16.136
Music.