درباره این اپیزود

انگلیسی
ایالات متحده آمریکا

رونوشت 🔗

جستجوی اپیزودهای گذشته

اپیزودهای قبلی Constructive Thinking را جستجو کن.

قسمت های دیگر در این پادکست

This podcast session between PCA’s Paul de Jong and Bill Black, President and CEO of the Calgary Construction Association, unpacks the “Honour the Work” initiative. Honour the Work has been rolled out to over 950 Calgary area classrooms, in which students in grades 1-6 are provided with multidiscip…
B.C. says it wants to build more infrastructure and spend taxpayer dollars wisely. So why is it still using procurement rules that shut out so many qualified contractors and workers? In this episode, Darrel Reid sits down with PCA’s B.C. Regional Director, Dan Baxter, to talk about the province’s C…
In this episode, PCA's VP of Public Affairs, Darrel Reid, is joined by Paul de Jong, PCA's President & CEO, Dan Baxter, PCA's BC Director, and Ryan Bruce, Government Relations Director at CLAC. Together, they reflect on PCA and CLAC's recent lobby days at the BC Legislature, where they made the…
There's been a lot said about mental health and wellness in the construction industry - but what about financial wellness? How do the two relate? What steps can be taken to improve both, and foster a more productive, engaged workforce?Listen now as Kevin McCarthy, Head of Corporations and Instituti…
سلب مسئولیت: پادکست و آثار هنری تعبیه شده در این صفحه متعلق به Progressive Contractors Association of Canada است که متعلق به صاحب آن است و به Listen Notes، Inc وابسته یا تایید نشده است.