درباره این اپیزود
Hear our experts Fabian Hippe (from Menck, Acteon’s Marine Foundations business line) and Ben Andrew (from 2H, Acteon’s Engineering Consultancy) discuss how to manage installation risks for offshore wind foundations, from common challenges to practical solutions that keep projects safe, efficient, and on schedule.
انگلیسی
انگلستان
رونوشت 🔗
Are you the producer of this podcast?
Add a podcast transcript
Need Audio-to-Text?
Transcribe with Listen411 in Just 60 Seconds
جستجوی اپیزودهای گذشته
اپیزودهای قبلی Act on Energy را جستجو کن.
قسمت های دیگر در این پادکست
Offshore geotechnical engineering is a world of deep water, shifting soil and evolving technology. In this episode, Guste Kelly (née Cesnuleviciute), Marketing Campaign Lead at Acteon, sits down with Justin Carpenter, Sales and Business Development Director at UTEC, Acteon’s Geo-services business l…
Offshore projects generate terabytes of survey and inspection data - but is it ready for AI? In this episode, Tim Eyles, VP at Acteon, alongside Christopher Hillier, Head of Sales and Commercial and Greg Hammond, EA Digital Lead at UTEC, Acteon’s Geo-services business line, discuss how better data …
Mooring integrity management can be seen as an afterthought. Yet, the risks and costs associated with a mooring line failure can be catastrophic. In this episode, Tom Fulton, Global Director, Strategic Mooring Solutions and Kent Longridge, Senior Principal Engineer at Intermoor dive into a topic th…
Permanent mooring is one of those offshore operations where small decisions made early can have massive consequences over the life of a field. In this episode, Brian Boutkan, Director of Commerce at Jumbo Offshore, and Martin Kobiela, Value & Performance Authority at Intermoor, unpack why moori…
سلب مسئولیت: پادکست و آثار هنری تعبیه شده در این صفحه متعلق به Acteon است که متعلق به صاحب آن است و به Listen Notes، Inc وابسته یا تایید نشده است.
ویرایش
از کمک شما برای بروز نگهداشتن پایگاهدادههای پادکست سپاسگزاریم