Google lands two power paths. Indiana regulators approved AES Indiana's $1.3 billion solar, storage and wires plan for its 390 MW Monrovia campus, the first test of the state's 80% large-load cost law. Separately, Constellation will spend $4.3 billion uprating 11 PJM reactors by 890 MW. In this epi…
NiSource signs a 20-year, 1,100 MW supply deal with Microsoft, funded by Microsoft, and NERC's computational-load standards clear their final ballot. Plus AEP's $4 billion fuel cell plant for Google in Wyoming and a 7.5 GW gas campus in a Utah water filing. In this episode NiSource Signs 20-Year M…
PJM filed a FERC study agreement to evaluate roughly 9.6 GW of new data center load and 10.2 GW of generation at SB Energy's Flagship site in Pike County, Ohio, outside its interconnection queue. Also: AEP, X-energy and Amazon eye 960 MW of Xe-100 reactors in Indiana, Texas's data center permit fre…
PJM cleared its first 2.1 GW of fast-track capacity, Engie batteries and an LS Power gas uprate, as a Senate Democratic report says hyperscalers resist paying for shared grid upgrades and Meta's infrastructure chief puts 2026 spend above $100 billion. In this episode PJM fast-tracks first 2.1 GW o…