00:00:03.369 --> 00:00:11.787
Besides from the title and everything, it's helped with implementation of new programs and software to our users in the office in the field.
00:00:11.787 --> 00:00:20.971
I also work on the operation team dealing with our process procedures, training etc.
00:00:20.971 --> 00:00:23.164
So this all came about.
00:00:23.164 --> 00:00:32.972
Our leadership team it's always had the vision of utilizing VDCs and BIM at our company for a while now.
00:00:32.972 --> 00:00:38.884
But with all the priorities and projects coming in, everything can busy.
00:00:38.884 --> 00:00:44.087
It's been an ongoing initiative for about as long as I've been at LS Black.
00:00:45.381 --> 00:00:54.448
So recently there's a reintegration of this idea and thought around BIM and utilizing it.
00:00:54.448 --> 00:01:08.789
So they asked me hey, can you go out there and find us some consultants that have experience in building out a BIM team from beginning to end?
00:01:08.789 --> 00:01:13.525
Our goal is in beginning we're going to be outsourcing the work.
00:01:13.525 --> 00:01:21.106
Have this partner if they have internal drafters and people, that technician that can do it good.
00:01:21.106 --> 00:01:25.966
If not, do they know people and can recommend people to work with us?
00:01:25.966 --> 00:01:33.688
Then eventually this consulting would eventually fade out as our team grows internally.
00:01:33.688 --> 00:01:35.503
So it's high-level view.
00:01:35.503 --> 00:01:35.944
That's that.
00:01:35.944 --> 00:01:44.712
Then I sent you the visions.
00:01:44.712 --> 00:01:50.465
I guess all of the categories that we want to focus on VDC and DEMON, and that email.
00:01:55.382 --> 00:01:55.683
Thank you.
00:01:56.441 --> 00:01:56.921
Excellent.
00:01:56.921 --> 00:02:08.948
Could you tell me a little bit more about your background with BIM, what more specific experiences and Gotcha.
00:02:08.967 --> 00:02:09.590
So good question.
00:02:09.590 --> 00:02:12.007
My background is actually in construction.
00:02:12.007 --> 00:02:16.590
I started in a field and then I moved into project management.
00:02:16.590 --> 00:02:18.780
I started with my old company.
00:02:18.780 --> 00:02:24.066
I used to work for Lifetime Construction, lifetime Athletic, lifetime Fitness, if you guys heard of them.
00:02:24.066 --> 00:02:32.025
So I worked with them for about 10 years and about five years ago.
00:02:32.025 --> 00:02:44.689
We want to integrate construction technology into the way we operate but we just have a really challenge of having that person that can connect technology to reality.
00:02:44.689 --> 00:02:50.161
Construction is more of a traditional old school approach to thing.
00:02:50.161 --> 00:02:52.468
It's just slower when it comes to growing.
00:02:52.468 --> 00:02:58.372
So they engage me with technology.
00:02:58.372 --> 00:03:02.645
So I have a little background on BIM, very basic stuff.
00:03:02.645 --> 00:03:09.646
I've been part of some
Load full transcript
BIM execution plan that we did on some of our projects.
00:03:09.646 --> 00:03:19.205
I've looked at models, how to operate a model and stuff like that Not actually build it out but can drive it in coordination meetings and stuff like that.
00:03:19.205 --> 00:03:28.967
But no, I do not have any drafting experience or any actual doing experience of BIM, more of like an oversee or management level.
00:03:29.919 --> 00:03:45.056
So, and when you say management level, are you participating in design coordination meetings or is it mostly just referencing the model in the field, or can you share?
00:03:45.076 --> 00:03:45.419
a little bit.
00:03:45.419 --> 00:03:47.067
Well, both I've done both.
00:03:47.067 --> 00:04:00.026
One in pre-construction I've worked with all these design teams and our self-contractors kind of lead the meeting to get everyone on the same page to go through those coordination meeting.
00:04:00.026 --> 00:04:07.507
And then we have our drafters and our tech that actually does the integrations and the class detection and the fixing.
00:04:07.507 --> 00:04:30.951
And then I also, once we get to the point of production, I've done meetings with self-contractors on site to kind of mostly age-back contractors for overhead ceilings and stuff like that in closure to help facilitate that piece of work, above ceiling MVP work, to get that into production.
00:04:32.459 --> 00:04:34.608
But never really went past that.
00:04:34.608 --> 00:04:39.689
We never really wrapped it all together to send out a complete as-built package.
00:04:39.689 --> 00:04:46.867
We never got to that point because there's always been section of this as project A and section B is like project C.
00:04:46.867 --> 00:04:48.665
So there's never been on one project.
00:04:48.665 --> 00:04:56.091
So on one project I just wanted all the design coordination up front, all the LFIs, all the self-gatherers fast, you can.
00:04:56.639 --> 00:05:06.288
And there's another project who the person that's only driving the model is our HVAC contractors and I was with the general contractor.
00:05:06.288 --> 00:05:10.846
So I kind of help facilitate that with them, with the other self-contractors.
00:05:10.846 --> 00:05:15.749
The other self-contractors that didn't really have a lot of firm experience.
00:05:15.749 --> 00:05:36.322
So it was a partnership between me and our HVAC contract that kind of drove those meetings and it was mainly just to get the age-backs equipment up above the ceilings, Because that company policy is we won't build anything unless we have a proof model and that was unique for us and that never did and it worked well.
00:05:36.322 --> 00:05:39.747
I said yes for the HVAC contractor.
00:05:39.747 --> 00:05:40.382
It worked well.
00:05:40.382 --> 00:05:44.764
It was a challenge for some of the foaming contractors and the electric contractors.
00:05:45.660 --> 00:05:49.204
But your experience with the mechanical contractor using it that part worked well.
00:05:50.480 --> 00:05:59.326
Yeah, it took us a little bit of time to get used to, because in past we've always approved 2D submittals, shop drawings, stamp it and then proceed.
00:05:59.326 --> 00:06:12.086
This go around, even if we get that, they wanted a approved Claxie section model that they put together before they could do so it was kind of a different, but it worked out well in the end.
00:06:12.086 --> 00:06:15.408
We didn't have a lot of rework when it comes to HVAC.
00:06:16.019 --> 00:06:16.523
You did not.
00:06:17.060 --> 00:06:17.762
Yeah, did not.
00:06:18.581 --> 00:06:20.940
OK, good, awesome, yeah.
00:06:20.940 --> 00:06:24.466
So my background is construction as well, construction management.
00:06:24.466 --> 00:06:46.908
I went to school in Colorado State their construction management program and then worked for Turner Construction for a couple of years and then Fleur, which is actually an EPC Engineering Procurement Construction Company, and built a very large mega project, mostly on the life science side, and so you don't really have a choice on those projects.
00:06:46.908 --> 00:07:12.129
It's complex enough that you have to use BIM and basically all the contractors have to use BIM because it's just that level of complexity and so that's and I kind of touched BIM a couple of times but on one project was the BIM manager for a billion dollar facility, multiple buildings.
00:07:12.129 --> 00:07:19.543
So I went from knowing nothing about BIM to knowing all of the things about BIM, at least in that point in time, just because I got to.
00:07:19.543 --> 00:07:32.319
When you have five different projects or buildings on the same site and over time you kind of get to rapidly learn from all your mistakes.
00:07:32.319 --> 00:07:35.509
So it was a great opportunity in that sense.
00:07:35.509 --> 00:07:46.629
And then mostly on the I've done project management, but also very closely tied to construction technology in general.
00:07:46.629 --> 00:07:52.889
So there's the BIM piece, there's the specifically, but then there's all kinds of other construction tech piece.
00:07:52.889 --> 00:08:04.627
So that's what led me to BIM designs actually was the interest in construction technology, and we tend to focus on the LOD 400, that's where most of our clients come from.
00:08:04.627 --> 00:08:10.805
But and then there's times where we get to play in other spaces and so it's always fun to.
00:08:10.964 --> 00:08:13.223
It's just it's honestly.
00:08:13.223 --> 00:08:16.764
There's so much opportunity and so much rapid change.
00:08:16.764 --> 00:08:33.846
It can feel even for myself this is all I do, right, but it still feels like I'm always on my back foot trying to learn the new technology, just because it changes so quickly, and so I'm super excited about the opportunity.
00:08:33.846 --> 00:08:35.626
You're not your experience is not.
00:08:35.626 --> 00:08:37.046
You're not alone in your experience.
00:08:37.046 --> 00:09:00.527
I
think all over the gamut you've got small companies, very large companies and folks lists kind of similar feedback that they did this on one project or this other thing on one project, but there wasn't that standardization or there wasn't that company-wide adoption on the construction technology side.
00:09:00.527 --> 00:09:23.412
And so what I wanted to do today is meet with you and kind of give you a high-level overview of our typical, the ways that we typically engage with clients that need a similar consulting that you've identified, and kind of get your feedback and see if that you know matches kind of what you had in mind.
00:09:24.085 --> 00:09:25.610
Gotcha, that works, thank you.
00:09:26.585 --> 00:09:27.847
Awesome.
00:09:27.847 --> 00:10:02.893
So typically what we would do is we would engage in there's usually a group meeting, we call it the kickoff meeting, and there's a particular exercise because the person who we're our counterpart right which I think would be you, our counterpart may have a list based on feedback you know, or personal experience or who knows as that starting point of what you're envisioning and to make sure that we have the full teams buy-in on the types of problems we're trying to solve.
00:10:02.893 --> 00:10:29.871
We like to start with that kickoff meeting and we run this exercise where everybody kind of brain dumps all the different you know solutions or problems that they want to solve and then as a team we kind of prioritize those and if your list and your vision is based off of feedback from your team, we would expect similar results, right, but it's kind of a touch point, it's a checkpoint.
00:10:29.871 --> 00:10:47.092
Maybe there's things that have shifted, maybe certain stakeholders weren't included, but it helps us really start set the tone with the team so that they feel that engagement right from the beginning, that they're able to contribute their thoughts or concerns or whatnot.
00:10:47.092 --> 00:11:03.692
And then obviously we would work very closely with you to shape that roadmap, if you will, to just make sure we're aligned on what you feel is the priority, because all stakeholders don't necessarily have that visibility right.
00:11:03.692 --> 00:11:15.414
But my point is that it's a group exercise and that really helps engagement and feedback and, you know, just kind of aligning on the overall goal.
00:11:15.414 --> 00:11:24.352
Really it just helps on the implementation side because people feel bought in from the very beginning versus a directive being handed down right.
00:11:25.365 --> 00:11:37.109
So once we have that kickoff meeting then you would have identified the stakeholders ahead of time and it's usually we usually like to talk to somebody from every department.
00:11:37.109 --> 00:11:51.572
So on the safety side, detailing side, project management side, we also like to talk with previous clients, you know, or end users, depending on which type of client we're working with.
00:11:51.572 --> 00:11:56.028
So there could be some external folks as well to get feedback from.
00:11:56.028 --> 00:11:58.942
And we're usually looking to.
00:11:58.942 --> 00:12:03.927
You know what worked well, what didn't work well, what information do you find yourself needing and not having?
00:12:03.927 --> 00:12:17.895
You know what inefficiencies are you seeing, because it all seems to relate back to construction technology in some way and more specific to really expected then.
00:12:17.895 --> 00:12:39.094
So in that stakeholder feedback we kind of usually there's some themes that come out of that and it usually acts as a good check on that initial kickoff meeting to say, okay, in the way that the team prioritized there is that also what we're seeing in these one-on-one stakeholder interviews.
00:12:39.094 --> 00:12:46.416
And then we have another group meeting at the tail end of that to basically confirm that roadmap.
00:12:46.416 --> 00:13:01.052
So we would have talked with you offline after that initial meeting, we would have you know, let you know kind of what that stakeholder feedback was and so you would have input going into that that second group meeting.
00:13:01.052 --> 00:13:06.730
And in that second group meeting we're basically kind of presenting this is what we found right.
00:13:06.730 --> 00:13:09.692
So this was the feedback initially.
00:13:09.692 --> 00:13:26.708
This is kind of this is what matched, this is what didn't match and this is kind of what we recommend from a roadmap perspective and in that they should be able to see their feedback incorporated at some level, even if it's on a roadmap.
00:13:26.808 --> 00:13:38.373
You know, on down the road and I'll just give you a quick for instance sometimes people say their starting point is we really wanna do 5D.
00:13:38.373 --> 00:13:41.373
You know that's our huge priority pain point, whatever.
00:13:41.373 --> 00:13:45.714
So sometimes people expect that to be priority number one.
00:13:45.714 --> 00:13:56.971
But depending on where the company is as a starting point, right, it's not priority number one because there's like three steps that need to happen before you get to that point right.
00:13:56.971 --> 00:14:00.629
So that's kind of the that's the type of detail that's laid out in that roadmap.
00:14:00.629 --> 00:14:06.472
Is that these are the things that we're gonna tackle in order to achieve that first priority.
00:14:06.472 --> 00:14:08.548
Does that make sense so far?
00:14:09.410 --> 00:14:11.436
Yep, nope, Awesome.
00:14:11.436 --> 00:14:16.899
So my only question is this typically happens after.
00:14:16.899 --> 00:14:23.150
I guess this, for my point is that this is what we're talking about right now.
00:14:23.150 --> 00:14:35.490
It's kind of like just understanding each other more, but what you're talking about is after we come to an agreement and we selected this team as, and then, from that point forward, Okay, I just wanna make sure.
00:14:36.192 --> 00:14:37.054
Yeah, yeah, absolutely.
00:14:37.054 --> 00:14:55.230
This is absolutely because we have getting a proposal together that I guess, if what I'm laying out to you as far as process, if it didn't match kind of your expectations or what you feel is needed, then I would need to know that now so that we incorporate whatever-.
00:14:55.852 --> 00:14:56.214
Gotcha.
00:14:56.684 --> 00:15:01.952
We need to into the proposal right, which is why I'm kind of presenting our typical.
00:15:01.952 --> 00:15:08.333
But obviously there's different needs, every client has different needs and so we can adapt.
00:15:08.333 --> 00:15:29.232
But that kind of fundamental layout that beginning, middle end of that first phase we found works really well in any sort of organizational change management, whether it's project controls, bim, doesn't really matter what the topic is, it's the overall approach to yeah.
00:15:29.253 --> 00:15:32.750
I agree, yeah, yeah, gotcha.
00:15:32.750 --> 00:15:59.869
So I just wanted to make sure, because Luke and the other partner I don't remember his name, mark Mark yeah, so we had this conversation and kind of what you're talking about is more of a next step, which totally I'm glad we were talking about this, but for the meeting next week, I just want to make sure that you have an understanding of that, what it is.
00:15:59.869 --> 00:16:29.225
So, pretty much what we want to do is sit down with some of our leaders in each team, stakeholders, and they're going to quickly go through kind of their vision for VDCs and BIM and hopefully by the end of that meeting, you can put together to us a proposal based on the list that was in that email, and then what you said makes a lot of sense about meeting with them again in a group and then individually, because you have to, that's.
00:16:29.225 --> 00:16:49.914
I agree that you need to be able to understand how we operate, not just through one meeting, but to multiple meetings and individual meetings as well, to really understand, and not only with us, but with our partners from design and subcontractors, because they're probably going to have a different perspective than a person who thinks we are what we are right.
00:16:50.765 --> 00:16:57.068
There's certain stuff that and issues and challenges that some people in my LSC that we can't.
00:16:57.068 --> 00:17:01.389
So no, I like the game plan After we sign up for goals.
00:17:01.389 --> 00:17:05.230
I just want to make sure we're not skipping the part before the proposal.
00:17:05.230 --> 00:17:06.930
Does that kind of make sense?
00:17:07.944 --> 00:17:09.249
Yes, so it is.
00:17:09.249 --> 00:17:11.605
I'm glad that we're doing that it's.
00:17:11.605 --> 00:17:20.891
I always love hearing the feedback and just trying to understand what problem they're trying to solve, and obviously, the better we understand that, the more accurate our proposal can be.
00:17:20.891 --> 00:17:28.630
We've done this enough times,
though that we have a, it's not necessarily blocking us from giving you a proposal.
00:17:28.630 --> 00:17:36.009
Okay, right, that type of feedback, because it's sort of just inherent to the plan, the overall plan.
00:17:36.009 --> 00:17:41.035
But so, yeah, so no issues at all for having that meeting.
00:17:41.035 --> 00:17:51.371
Love that we're doing that, and if you needed any sort of clarity beforehand or if you had any questions from us, feel like the team might have questions.
00:17:51.371 --> 00:17:54.393
Then we can also be prepared to answer those.
00:17:56.505 --> 00:18:23.816
The one thing I would say is our leadership team is very new to BIM and VDC, so it will be good if you can somehow use your experience and your expertise and I'll do the same to kind of guide the meeting to something that's more obtainable versus some stuff that they've visionary 20 years from now is something that's really not applicable to our business.
00:18:23.904 --> 00:18:29.292
At the end of the day, we want BIM to help improve our profit.
00:18:29.292 --> 00:18:30.651
I'm just gonna be straight out.
00:18:30.651 --> 00:18:48.173
It's to help improve efficiency, which includes right, which will bring us more profit, more projects and grow the company right, and sometimes people's vision or the agenda might always not relate to growing the company.
00:18:48.173 --> 00:18:49.727
Okay.
00:18:49.727 --> 00:18:55.512
So I kind of want to use your expertise, based on kind of the size of our company.
00:18:55.512 --> 00:19:01.571
We do 100 mil, 150 mil a year, a lot of federal projects, some commercial.
00:19:01.571 --> 00:19:12.211
So kind of using your expertise to kind of help guide that meeting as far as helping them what typically other companies do and what we should do versus what they want to do.
00:19:12.211 --> 00:19:20.356
Okay, and then from that point you can have enough information to give us a proposal.
00:19:23.376 --> 00:19:24.085
Yeah, they won't have the idea.
00:19:27.390 --> 00:19:32.097
The idea is it's very similar to that category that I gave you the 1-5 year plan or something like that.
00:19:32.097 --> 00:19:39.297
Yeah, but those are really industry standards and you can Google and find those categories.
00:19:40.808 --> 00:19:46.252
Yeah, absolutely, and those are what I would call solutions, right, like the map that you sent us.
00:19:46.733 --> 00:19:51.691
Super helpful to see kind of where your head's at as to what you feel is important in the timing of those.
00:19:51.691 --> 00:20:02.537
That's great to have going into any of those meetings and in that let's see how do I say this.
00:20:02.537 --> 00:20:19.939
And ultimately it's still a solution, and you want your stakeholders to be bought into the solution, and so usually I think the first step is identifying a problem statement, and you just did that.
00:20:19.939 --> 00:20:20.179
Right.
00:20:20.179 --> 00:20:29.894
You said, hey, we want to find a way to employ construction
technology in a way that helps us maximize profitability, right.
00:20:29.894 --> 00:20:46.136
So having that problem statement and starting out whether it's this next meeting that we're in or the first meeting after a proposal would be agreed to, right, meeting with that problem statement to keep people focused, and it's okay.
00:20:46.136 --> 00:20:55.813
I'm used to people throwing out all kinds of solutions that are like I want to fly to the moon, like crazy things that would be, that are so far down.
00:20:55.813 --> 00:20:56.547
That's okay.
00:20:56.547 --> 00:21:06.314
People feel heard because their idea or their solution to solving that problem of how to maximize profitability still makes it on the roadmap.
00:21:09.951 --> 00:21:12.136
It just may be like on the far end of the roadmap, right?
00:21:12.136 --> 00:21:15.574
I think what you said in the beginning there is perfect.
00:21:15.574 --> 00:21:21.076
I think we should start out with a meeting saying, hey, identify a problem that we need to solve.
00:21:21.076 --> 00:21:24.211
I think what you just said, what you told me, is perfect.
00:21:24.211 --> 00:21:36.277
To kick off the meeting, to set the expectation how the rest of the meeting will go, is that we're not trying to understand things that you dream up and driving road trip over Thanksgiving or something.
00:21:36.277 --> 00:21:40.534
It's something that we can actually apply and see results.
00:21:40.534 --> 00:21:45.234
Not this year, next year, but at least we see results and we have a goal.
00:21:45.234 --> 00:21:51.297
Not something you thought of when you were driving six hours home to Thanksgiving with your family.
00:21:53.067 --> 00:21:53.690
So what you said?
00:21:53.750 --> 00:21:54.250
is perfect.
00:21:54.952 --> 00:21:55.595
Oh, good, good.
00:21:55.595 --> 00:22:01.276
And if you don't have another agenda for the meeting, what I would actually?
00:22:01.276 --> 00:22:12.601
Because I am tempted, just naturally, when you're getting all those folks in the room, I'm tempted to jump into that first step, right where we are doing that idea dump.
00:22:12.601 --> 00:22:16.153
And it's any idea, I mean, it's just like word vomit, right?
00:22:16.153 --> 00:22:24.147
And if you're not ready to go there, if you don't want to, you're not ready for that type of engagement.
00:22:24.147 --> 00:22:45.037
The step before that one, then I would say it's still helpful to get their pain points and so keep it focused on the pain they're feeling and not a solution, right, so that we get better alignment going in, because the problem statement may be slightly different from, you know, maximizing profitability.
00:22:45.037 --> 00:22:50.195
Maybe there's a different problem statement we need to tackle.
00:22:50.195 --> 00:23:03.676
And so if we, how does that sound, if we were to have that meeting where they could kind of brain dump the pain points that they have, what's creating issues in their day to day work life?
00:23:03.676 --> 00:23:06.965
What are your thoughts on that?
00:23:09.565 --> 00:23:21.897
Yes and no, because I don't want them to also be a venting session where they start looking outside of kind of our scope, which is what problem does BDC and BIM solve?
00:23:22.644 --> 00:23:27.395
They might go to some operational stuff that has nothing to do with them.
00:23:28.305 --> 00:23:59.994
So I would like to I mean understanding the problem they want to solve with them I think it's kind of the vision of that meeting so that it's enough for you at the end of the day, what I want to get out of that meeting is this team has enough information so you can help us come up, that you can come up with a proposal to help us grow or implement BIM right, and whatever the question you may need to ask you can ask.
00:24:00.244 --> 00:24:01.328
There's no limit to that.
00:24:01.328 --> 00:24:16.298
So, just as I'm thinking right now that's kind of where my head is at is that at the end of that meeting I really want you to have enough information to have a proposal ready for us.
00:24:16.298 --> 00:24:35.632
And if that has to do with you doing an issue dump where they're throwing up all kinds of visions and stuff at the board and then you use your experience to kind of guide them and put them into a quantum-erotic order to achieve it, that's fine, I kind of want to leave that up to you and the expert.
00:24:35.632 --> 00:24:37.096
How have you done it with all the companies?
00:24:37.096 --> 00:24:43.454
Because you have more experience than I do and it comes understanding enough to get a proposal ready.
00:24:46.067 --> 00:24:58.864
Yeah, honestly, based on what you're describing, I do think we have enough to have the proposal, because you're not describing anything that's atypical of a client or a company.
00:24:58.864 --> 00:25:03.686
We would engage with Anything that would help me.
00:25:03.686 --> 00:25:07.174
The only thing that would help me dial it in more are those pain points.
00:25:07.875 --> 00:25:08.037
Okay.
00:25:09.228 --> 00:25:12.220
I don't know what I thought in case I change on that.
00:25:12.220 --> 00:25:18.237
But if I heard, and honestly what I'd be looking for is, is there a broad consensus on the pain points?
00:25:20.476 --> 00:25:21.300
That's the thing.
00:25:21.300 --> 00:25:33.671
That's the thing that I'm afraid might happen, and an hour meeting might become two hours, because there might be a disagreement on what the pain points are, and then one thing led to another thing.
00:25:34.092 --> 00:25:34.452
Got it.
00:25:34.953 --> 00:25:35.295
Yeah.
00:25:36.244 --> 00:25:38.656
So the beauty of this, and we'll have to figure out how to do it.
00:25:38.656 --> 00:25:41.667
If we're doing it remotely, we'll have to figure out.
00:25:41.667 --> 00:25:54.778
I think maybe there's probably some pre-work where folks could, because the first thing, what I would normally first ask for is for them to give me all of their pain points.
00:25:54.778 --> 00:26:02.795
What are the things that just create a rub with them that every time they have to do it or they need a certain information or they have to talk to so-and-so or whatever.
00:26:02.795 --> 00:26:06.691
What are those points where it just makes them just go?
00:26:06.691 --> 00:26:10.211
I'm so annoyed and what are those things?
00:26:10.211 --> 00:26:14.807
And they could send those to me in advance and I could go ahead.
00:26:14.807 --> 00:26:21.730
And because we won't have enough time, it's not even time issue, because I have ways to manage that piece.
00:26:21.730 --> 00:26:23.125
It's more so.
00:26:24.229 --> 00:26:33.236
It's harder to do some of this when you're not in person, and then there's added pressure to make sure that I'm interpreting things in real time.
00:26:33.805 --> 00:26:55.971
So, having them send and I could send an email with this or send you an email with a specific language for them to create that list, and then I could come to them and say, okay, getting feedback from the team, and understand that, working with Chan, that these are the things that these are the pain points the team is feeling.
00:26:55.971 --> 00:26:59.532
And then usually I spend like a one minute.
00:26:59.532 --> 00:27:16.613
A timed it's not debate, or if there is a debate it's a very timed, strict debate, right, so you've got two minutes to feedback here, but before I have the job, because I can be really tough on people in those moments, so before I have the job, I usually don't try to get into that.
00:27:16.613 --> 00:27:21.476
I think it would more so just be a recap of this is what we've heard from the team so far.
00:27:21.476 --> 00:27:24.172
Is this, you know, or any surprises here?
00:27:24.172 --> 00:27:38.425
And I can kind of get a sense of that consensus from that conversation and then we can, we can prioritize later once we actually get going with the the, the, the.
00:27:38.445 --> 00:27:40.111
After we're past the proposal point.
00:27:40.131 --> 00:27:40.432
Gotcha.
00:27:40.432 --> 00:27:51.932
Yeah, it'd be nice to have, like the light version of, I think, what you said I agree with, but I think that's more of once we come to an agreement with each other that we're moving forward to yellow as partners.
00:27:51.932 --> 00:27:59.372
I think I really want you know you to dive in and have those hard conversations and challenge our leaders to get to that point.
00:27:59.372 --> 00:28:02.733
I just don't think this meeting is totally ready for that.
00:28:03.526 --> 00:28:04.490
Yeah, I might not get the job.
00:28:06.826 --> 00:28:12.230
The thing is that I don't want to waste your time right when we're still in the selection process.
00:28:12.471 --> 00:28:13.333
Yeah yeah, no, okay.
00:28:15.007 --> 00:28:22.576
I want to be fair to everyone, because time is money, right, and I don't want you to do this and then turns out there's other things.
00:28:22.576 --> 00:28:25.172
You know that we went with someone else, blah, blah, blah.
00:28:25.172 --> 00:28:35.796
Right, I don't know what the reason is, but I just want you to have enough information to get the proposal and then we can, that leaders can make a decision on who to move forward with.
00:28:35.796 --> 00:28:38.432
And from that point on, I agree with you 100%.
00:28:38.432 --> 00:28:48.250
We need, we need to go to that granular level to get to understand what we really need and the problem that we're trying to solve.
00:28:48.250 --> 00:29:00.430
Okay, we're doing the technologies to solve a problem, right, right, and at some time we don't understand what that problem is, unless we have an outside voice challenging us on what those problems are.
00:29:01.352 --> 00:29:02.474
Absolutely yeah.
00:29:02.474 --> 00:29:07.394
And when you speak to the selection process, what is your decision criteria?
00:29:10.951 --> 00:29:12.615
I'm not trying to hide information from you.
00:29:12.615 --> 00:29:13.627
I actually don't know.
00:29:13.627 --> 00:29:17.425
Okay, I actually do not know, I know.
00:29:17.425 --> 00:29:34.419
Talking to our leadership team, I think it's about finding the right partner, and for us, for them too, it's not only the resources, but have you done this before?
00:29:34.419 --> 00:29:44.209
I think that's the other big cut here, for have you successfully shown that you've done this with other best construction companies before too?
00:29:44.209 --> 00:29:56.740
Then I'm pretty sure, before we select, there's going to be another meeting where, most likely, one of our leaders will probably lead that meeting.
00:29:56.740 --> 00:29:59.156
They go through like an interview process.
00:29:59.156 --> 00:30:14.700
Really, my thought behind this whole process is okay, I meet individually with the consultants to give them overall view of what we need and then have a meeting with our actual leader.
00:30:14.700 --> 00:30:18.599
You have enough information to come up with a proposal.
00:30:18.599 --> 00:30:24.998
Then, after that, I'm pretty sure there'll be an interview process and then a selection.
00:30:24.998 --> 00:30:30.520
Does that sound fair, because I don't want to use too much of your time either.
00:30:33.596 --> 00:30:49.319
No, that makes sense to me, because if the decision when we submit a proposal, who would you say the decision maker is for deciding whether whoever it is that's submitting proposal which one?
00:30:50.451 --> 00:31:22.034
It'll be a team of probably me, pain or VP of operations and our VP of business development, because, at the end of the day, every other team you learn that meeting coming up next week or the week after you meet with our pre-con team, the head of our pre-con, you meet with the head of estimating, you meet with our business development VP, you meet with the operation VP, this marketing.
00:31:22.034 --> 00:31:27.400
There's our corporate control which controls our technology and accounting.
00:31:27.400 --> 00:31:42.115
But
at the end of the day, those accounting, it, estimating, we all fall up to VP, which is VP of business development and VP of operations.
00:31:42.115 --> 00:31:52.933
Then the interviewer's expulsion will be a little bit smaller but at the end of the day, those are the decision makers at that level.
00:31:58.512 --> 00:32:04.811
Okay, excellent, in that case, I appreciate the opportunity to be in the room and hear.
00:32:04.811 --> 00:32:17.454
That cements my feel that I wouldn't like to hear from them if the same folks that are making the decisions are going to be in the room are roughly the same folks.
00:32:18.096 --> 00:32:18.258
Yeah.
00:32:18.450 --> 00:32:24.758
I think, making sure I understand their pain points, because that way I can make sure the proposal reflects that and they feel heard.
00:32:25.339 --> 00:32:25.559
Yeah.
00:32:26.711 --> 00:32:28.438
I think that would be really important.
00:32:28.438 --> 00:32:37.800
Then it would be helpful if you could give some thought, maybe get with the team to just try to understand.
00:32:37.800 --> 00:32:49.440
Is it about exhibiting that past performance and what does the right partner look like?
00:32:49.440 --> 00:32:51.718
You spoke to finding the right partner.
00:32:51.718 --> 00:32:53.194
What is that right partner?
00:32:53.194 --> 00:32:58.801
What traits does that right partner exhibit?
00:32:58.801 --> 00:33:02.239
That would be really helpful to us just to make sure.
00:33:02.239 --> 00:33:04.597
Just honestly, make sure we are the right fit.
00:33:04.597 --> 00:33:12.858
Depending on what you define as the right fit, it may not be the right fit and maybe we know that before we even get to the proposal.
00:33:12.858 --> 00:33:20.057
I sense that it definitely could be for sure just in the interactions that Luke had described.
00:33:20.057 --> 00:33:33.700
But I think getting more definition around that would be helpful just to making sure that we have what we are putting together is meeting your team's expectations.
00:33:34.411 --> 00:33:43.113
Yeah, gotcha, I guess you have more of a actual questions, or do you want us to?
00:33:43.113 --> 00:33:51.577
Just because I honestly I don't know if they know the answer to that, because this is something that's new to a lot of us.
00:33:51.577 --> 00:34:16.516
I think it might be based on the proposal, what's in the proposal, how well you understand the company, but the thing is there's always going to be that phase two, which is we define a partner and you're going to come in and spend the next I don't know how many months understanding who we are.
00:34:16.516 --> 00:34:22.911
A lot of stuff right now is going to be based on your resume, really.
00:34:23.213 --> 00:34:25.614
Yeah, it sounds like that, for sure.
00:34:27.275 --> 00:34:30.552
Yeah, if I can answer that question right now is what I would say Right now.
00:34:30.552 --> 00:34:34.478
For me, it's like interviewing someone to join our company.
00:34:34.478 --> 00:34:36.235
We don't know until we know.
00:34:36.235 --> 00:34:41.835
All we can do is look at the resume at that point and decide who we want to interview with.
00:34:42.550 --> 00:34:43.655
Yeah, no, that's super helpful.
00:34:43.655 --> 00:34:58.994
I'm glad I asked that question because I'm glad that you're offering such transparency as well, because normally we would focus our proposal on basically saying this is what we're going to do for you.
00:34:58.994 --> 00:35:04.001
We don't spend a lot of time capturing what we've done in the past.
00:35:04.001 --> 00:35:21.780
But, knowing that that's important, that you'll want to be able to see that Super helpful because I can make sure, whether it's part of the proposal or presentation or a conversation, I can make sure that we are able to show you Similar engagements that we've done and how those are forked out.
00:35:23.152 --> 00:35:25.561
Yeah, Then I sent the email.
00:35:25.561 --> 00:35:33.338
I sent the different categories, that we want them, but I also sent the second half of it.
00:35:33.338 --> 00:35:38.016
I know with our VP of operation he put that part together.
00:35:38.016 --> 00:35:42.635
I know that's important to him making sure that the proposal include all those items.
00:35:49.833 --> 00:35:51.840
Would you say for the team that we'd be meeting with?
00:35:51.840 --> 00:35:53.858
Has that what you sent us?
00:35:53.858 --> 00:35:57.956
Has that been pretty much socialized with all of them, or is it going to be a surprise to any of them?
00:35:59.090 --> 00:36:03.742
No, because the five-year plan has been talked about for like 12 months now.
00:36:03.742 --> 00:36:11.141
It's something they've all seen the bullet points of consultant service we're looking for.
00:36:11.141 --> 00:36:17.302
So that was it 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12.
00:36:17.302 --> 00:36:23.996
So that 12 bullet point is something I know of VP of operation really wants to be part of the proposal.
00:36:29.353 --> 00:36:30.338
Luke the bullet points.
00:36:30.338 --> 00:36:33.378
Those were on the other screen we looked at right.
00:36:33.849 --> 00:36:36.518
Yeah, the email I sent, I think, last Friday.
00:36:36.518 --> 00:36:49.760
Yeah, the test file is what we put together of needs and wants with BIM, then the bullet points of what we're looking for in our consultant service.
00:36:49.760 --> 00:36:53.777
I know what the resume we talked about.
00:36:54.510 --> 00:36:55.956
Do you want me to pull them up real quick, Ashley?
00:36:55.956 --> 00:36:56.954
I have the email here.
00:36:57.891 --> 00:37:07.355
Yeah, Because if you feel like that's well socialized with the group already, that's essentially probably the same feedback I would hear from the pain points.
00:37:07.355 --> 00:37:21.240
I would imagine I'm just thinking on the fly here but probably what it makes sense to do pull up the five-year plan real quick, and then we'll come back to this part.
00:37:21.731 --> 00:37:23.717
Sure
Should be here here.
00:37:24.570 --> 00:37:30.862
Yeah, so probably what I would.
00:37:30.862 --> 00:37:37.682
Let's see I may end up having.
00:37:37.682 --> 00:37:42.717
When Luke and I looked at this yesterday, it made sense.
00:37:42.717 --> 00:37:47.601
Probably my only question I had in that meeting is why five years to do this?
00:37:47.601 --> 00:37:50.637
What's stopping you from doing this in three years?
00:37:52.672 --> 00:37:53.414
That's what we don't know.
00:37:53.414 --> 00:38:00.617
Okay, this list right here is based on the knowledge that we have internally right now.
00:38:00.617 --> 00:38:21.217
Okay, and it might be wrong, I can tell you that, okay, we don't have an expert BIM person that has done this for a company before, when they started at zero and grew it into a part of the process and part of the way a company conducts business and construction.
00:38:21.217 --> 00:38:22.750
I don't have the experience.
00:38:22.750 --> 00:38:24.938
I don't think anyone else in our company has the experience.
00:38:25.590 --> 00:38:29.597
They might say they have, but I don't believe we do, and I'm just being transparent with you.
00:38:29.597 --> 00:38:32.918
Right, some say they do, but when I talk to them they don't.
00:38:32.918 --> 00:38:36.599
So this is based on that.
00:38:36.599 --> 00:38:42.094
So there's no saying that, oh, this can't be done in a year, we don't have the experience.
00:38:42.094 --> 00:38:48.059
So we were being very conservative and I thought, yeah, so does that kind of answer your question?
00:38:48.059 --> 00:38:49.202
Yeah, absolutely.
00:38:49.510 --> 00:38:58.523
This thing can all be like using your expert opinion and you telling us that, hey, maybe fabrication and mechwood design can be done in three years if you do this and this and this.
00:38:58.523 --> 00:39:10.394
So we're open for it, when we're just looking for a partner that's really want to help us grow to that point understanding that they will be phased out at a certain point.
00:39:10.956 --> 00:39:13.380
Yes, yeah, no, we love being phased out.
00:39:13.380 --> 00:39:16.514
Yeah, I get bored if I have to stay around too long.
00:39:16.514 --> 00:39:22.940
Yeah, so I think that it's definitely a good fit from that standpoint.
00:39:22.940 --> 00:39:41.181
But, yeah, and it depends like the timeline, some organizations, the timeline this would be overachieving for some organizations because they're they really struggle to make decisions or they're really bought into their current processes or any number of things.
00:39:41.181 --> 00:39:47.202
Other organizations, they could probably do this in two to three years, no problem.
00:39:47.202 --> 00:39:50.338
And so it really just does depend on the team.
00:39:50.750 --> 00:39:59.900
So I probably I'll probably have some questions around that that would help me get a feel for how quick the team could, because that was my gut feel.
00:39:59.900 --> 00:40:09.231
Is that the team, that it could be, that it's a the team legitimately needs this much time just for the organizational change piece.
00:40:09.231 --> 00:40:12.253
And then there's a couple, and so I would.
00:40:12.253 --> 00:40:15.460
I'd have questions around like how do you do it now?
00:40:15.460 --> 00:40:18.996
Like the layout, how is that done now?
00:40:18.996 --> 00:40:28.181
And, particularly with the problem statement you laid out, how do you see that that would help your profit margin?
00:40:28.181 --> 00:40:35.061
Right, if you could maximize or optimize the way that you do layout, how would that help you?
00:40:36.110 --> 00:40:44.177
Yeah, no, that's kind of where the subject matter expert can answer that question a lot better than I can, right?
00:40:44.197 --> 00:40:44.378
now.
00:40:45.150 --> 00:40:46.556
Yeah, there'll be another one.
00:40:47.090 --> 00:40:51.059
Yeah, we'll have a director of estimating will be there.
00:40:51.059 --> 00:40:55.217
Director of field operation will be there as well.
00:40:55.217 --> 00:41:07.150
So we're going to have a lot of our mid-management and above people that will be there, and that's why I kind of it's kind of more people than I want to, but I don't have a choice.
00:41:07.150 --> 00:41:33.853
But that's why I kind of want to use your expertise to kind of guide the meeting, but without going into in depth, like we already agreed to our partnership enough, so you have information where we can effectively navigate the meeting, where you can have a proposal by the end of the meeting enough information to get a proposal by the end of the meeting without going way into depth.
00:41:34.155 --> 00:41:41.456
Like we already signed you guys up, that kind of makes sense and we're kind of on the same page on that.
00:41:42.452 --> 00:41:52.900
Yeah, absolutely To be honest with you, just to give you some feedback, you're already the fact that you'll have a roadmap and that you've been talking about this for 12 months.
00:41:52.900 --> 00:41:58.780
You're already really far ahead of a lot of people that we start engagements with.
00:41:58.780 --> 00:42:01.096
They don't even have this list.
00:42:01.096 --> 00:42:17.155
So you've already made a lot of progress and the next step is just vetting the list, really figuring out what tweaks need to be made, either because of capability or priority, or there are a couple of different factors there.
00:42:17.155 --> 00:42:25.976
But you'll have done a lot of great work already, even without a consultant, so that's something to celebrate for sure.
00:42:25.976 --> 00:42:33.463
I probably will start the meeting with that acknowledgement to the team, because that is really helpful.
00:42:33.463 --> 00:42:58.380
That's why I already have so much clarity of what's needed for the proposal just from this, so I can focus that meeting and just kind of asking some questions specific around this and then managing the time in a way that we don't get stuck into anything, any one specific
thing, and focus on whatever clarity that will improve the proposal.
00:42:59.032 --> 00:43:00.431
Gotcha and then.
00:43:00.431 --> 00:43:06.262
So, as of right now, what I've told them this is what I told them before I even talked to anyone.
00:43:06.262 --> 00:43:09.056
It's like kind of the meeting is based on.
00:43:09.056 --> 00:43:15.233
So marketing, what is your vision for BIM Estimating what is your vision for BIM Fuel operation?
00:43:15.233 --> 00:43:16.295
What is your vision for BIM?
00:43:16.295 --> 00:43:22.072
Is that the right agenda or do you have something else in mind?
00:43:22.072 --> 00:43:29.463
Because my agenda right now is just going down each team and have them lay out what they want.
00:43:29.463 --> 00:43:31.842
What does good look like in them?
00:43:31.842 --> 00:43:37.782
That's the question I laid out to them and I don't know if that's the right approach.
00:43:37.782 --> 00:43:40.722
I'm leaning on your expertise here.
00:43:40.722 --> 00:43:44.182
Is that the right agenda or do you want to go through this list?
00:43:48.858 --> 00:44:06.561
Typically I would really push off solutions and even this is a solution Because it's so easy to argue about the solution but most people and it's very easy to find consensus when it comes to the problem or the pain point.
00:44:06.561 --> 00:44:11.987
Understanding those pain points help me understand.
00:44:11.987 --> 00:44:13.320
Is this the right list?
00:44:13.320 --> 00:44:23.599
So, for example, if I were to go into that meeting and just say, okay, estimating, tell me what your biggest pain points are in estimating or operations.
00:44:23.599 --> 00:44:24.784
What are your biggest pain points?
00:44:25.536 --> 00:44:44.663
Say, estimating, says, oh, my biggest pain point is I have no idea what benchmarking I should use or what our average, whatever it is, then I'm going to look at this and I'm going to because I see proposals there and I see question mark.
00:44:44.663 --> 00:45:07.126
My question would be there are lots of areas that BIM can help in order to provide that benchmarking or to complement that benchmarking right to enable the benchmarking, but I don't see that listed as an item.
00:45:07.126 --> 00:45:08.802
So they may have benchmarking settled.
00:45:08.802 --> 00:45:17.925
In that case, I want to know more to make sure that the BIM plan basically executes in the way that they've already had set up.
00:45:17.925 --> 00:45:24.443
So I really do think it is, rather than, what solution do you see?
00:45:24.443 --> 00:45:29.123
Because they may not know, but they definitely would be able to speak to the pain points they have.
00:45:29.916 --> 00:45:33.463
Okay, so you want to focus more on the pain points?
00:45:35.737 --> 00:45:39.940
I really do what I've observed in the past.
00:45:39.940 --> 00:45:50.844
When you jump to the solution piece, I'd even be hesitant to pull this up to share it with the team, because it just becomes really easy to debate the solution.
00:45:52.277 --> 00:45:53.844
Yeah, no, that makes sense.
00:45:53.844 --> 00:45:57.083
Okay, no, that changed my mindset.
00:45:57.083 --> 00:46:07.206
No, I like the idea If you want to approaches as one of the pain points and then have you provide us what the solution looks like.
00:46:07.206 --> 00:46:11.264
Yeah, no, that does make sense.
00:46:12.157 --> 00:46:16.643
Well, and, believe me, I love coming up with solutions all by myself in a vacuum.
00:46:16.643 --> 00:46:36.985
But the approach we take is first to build that collaboration to basically facilitate the team to create their own solution, Because I'd have the same solution probably for everybody, but it's not always the right fit based on that organization.
00:46:36.985 --> 00:46:43.382
It's more so we're facilitating the process to help the team get to the solution.
00:46:43.382 --> 00:46:47.340
Then we're able to point some things like okay, you can do that.
00:46:47.340 --> 00:46:50.324
Here's some pros and cons to that.
00:46:50.324 --> 00:46:58.143
Ultimately, if the team needs this to weigh in, we have some clients that say, look, we have no idea at all whatsoever.
00:46:58.143 --> 00:47:01.885
You can ask us, but we're not going to know the answer.
00:47:01.885 --> 00:47:12.320
I still always ask Okay, Then ultimately, if I may need to make that decision because I think it's the right fit for what they are running into, then that's not a problem.
00:47:12.320 --> 00:47:16.644
But collaboration is definitely a focus of ours in the process.
00:47:17.327 --> 00:47:18.257
Okay, gotcha.
00:47:18.257 --> 00:47:49.681
Okay, then, based on how I have it in my head right now, based on our conversation today, we want to start out with you explaining we're here to what the statement that you made earlier I forgot what you said, I can't wait for a word, but to understand our pain points of each one of those teams and then, from that point on, I guess, do we go through this list.
00:47:53.143 --> 00:47:54.438
Let's see In that meeting is an hour.
00:47:55.677 --> 00:47:56.139
It's up to you.
00:47:56.139 --> 00:47:58.222
I didn't put a time to it.
00:47:58.222 --> 00:48:03.255
That's my next question after we have an over-high-level view of the agenda.
00:48:03.255 --> 00:48:04.498
It's like how much time do you need?
00:48:07.579 --> 00:48:09.626
I would start with an acknowledgement to the team.
00:48:09.626 --> 00:48:11.621
Set a common vision.
00:48:11.621 --> 00:48:12.920
What are we trying to achieve?
00:48:12.920 --> 00:48:14.842
A lot of times, that's the problem statement.
00:48:14.842 --> 00:48:22.242
We want to figure out how you can incorporate construction technology to improve your profit margin.
00:48:22.242 --> 00:48:31.027
In order to do that, I want to check in with everybody to understand their pain points.
00:48:31.027 --> 00:48:34.244
What are their biggest hurdles?
00:48:34.244 --> 00:48:39.286
They feel and not everybody can speak to that specific
problem statement.
00:48:39.286 --> 00:48:43.304
Pre-construction, for example, may not be able to.
00:48:43.304 --> 00:48:48.405
I'll give that a little bit of thought and dial the common vision in.
00:48:48.405 --> 00:48:55.182
But then I would go around to each of the departments and I can ask them their pain points.
00:48:55.182 --> 00:49:01.748
Typically I ask them to write it down on stickies because it can get pretty lengthy.
00:49:01.748 --> 00:49:08.947
Some people like to talk and it'll get a lot of time with a couple of people.
00:49:08.947 --> 00:49:21.887
It would be good if they came prepped with those, if they could share them in advance, because then I can maximize the time in finding consensus between the groups.
00:49:22.135 --> 00:49:29.742
Is there a limit to what you want to put within three or five pinpoints, or do you want them to have an open-ended?
00:49:30.516 --> 00:49:31.780
Yeah, no, I like three to five.
00:49:31.780 --> 00:49:34.884
We'll do the open-ended after we do the engagement.
00:49:35.376 --> 00:49:41.242
That's where they can put all the pain points they ever want, but in this one, yeah, I think it makes sense to limit three to five.
00:49:41.242 --> 00:49:49.864
If they could send those in advance, then what I'll do is based on the feedback.
00:49:49.864 --> 00:50:02.081
I won't necessarily put this on, the wouldn't necessarily show this, but the questions I ask would be very much informed by what's showing up here and what I'm seeing in their comments.
00:50:02.081 --> 00:50:11.487
If I see complete consensus across the board, then I can show this right from the get-go Right.
00:50:11.798 --> 00:50:12.409
Got you.
00:50:12.409 --> 00:50:17.318
Yeah, Right now, what I have is introductions, problem statement.
00:50:17.318 --> 00:50:21.641
And you want to go by teams, by individuals.
00:50:23.617 --> 00:50:24.059
It's actually.
00:50:24.059 --> 00:50:26.284
If they could send the problem statement in advance.
00:50:26.284 --> 00:50:31.603
Okay yeah, then they could always read those aloud.
00:50:31.603 --> 00:50:35.603
We can have them read their top three.
00:50:37.398 --> 00:50:38.362
Okay, problem statement.
00:50:38.362 --> 00:50:42.021
Then the pinpoints.
00:50:44.077 --> 00:50:47.246
Are you saying problem statements are the same as pain points, Ashley.
00:50:48.778 --> 00:50:50.204
Yeah, that's where I'm trying to wrap.
00:50:50.204 --> 00:50:51.800
Is that one thing, or is that?
00:50:51.800 --> 00:51:03.907
Are you looking for a sense of the company's problem statement of why we need them and then go on to the pain points of each individual teams?
00:51:03.907 --> 00:51:10.420
Or is each of your teams supposed to come up with one statement of the problem and then the pinpoints?
00:51:10.420 --> 00:51:13.338
Or do we just skip the statement problems, go straight to the pain points?
00:51:15.900 --> 00:51:22.324
So we'll do introductions, I'll do an acknowledgement, we'll set a what we call set a common vision.
00:51:22.324 --> 00:51:24.382
So what are we trying to achieve from this?
00:51:24.382 --> 00:51:34.306
Okay, then pain points, and if I get their pain points in advance, then we should be able to build that problem statement closed with the problem statement.
00:51:34.306 --> 00:51:44.559
Okay, I would, because if I get their pain points in advance, I'm still going to have questions.
00:51:44.559 --> 00:51:56.163
So we'll build in when they're discussing their pain points, they'll present them and then I think we just need a little bit of time for me to ask questions and then the answer them.
00:52:00.155 --> 00:52:05.327
So what are you looking to define in the common statement from us?
00:52:05.327 --> 00:52:10.505
So I just want to prep our team for it, so that we're not fumbling around that agenda.
00:52:14.661 --> 00:52:19.643
If I get the pain points in advance, I don't know that they do need to create a problem statement.
00:52:20.757 --> 00:52:20.978
Okay.
00:52:22.235 --> 00:52:26.467
I think I would present a problem statement based on the pain points.
00:52:27.317 --> 00:52:29.664
Okay, so you would present that part I got you.
00:52:30.235 --> 00:52:33.625
And then get their feedback to make sure that I heard them.
00:52:35.297 --> 00:52:36.221
Okay, got you.
00:52:36.221 --> 00:52:41.547
Okay, that makes sense now.
00:52:41.547 --> 00:52:42.878
Thanks for doing that.
00:52:43.400 --> 00:52:44.083
Yeah, no problem.
00:52:44.135 --> 00:52:47.322
I appreciate that that helps a lot.
00:52:48.257 --> 00:52:48.657
Okay, good.
00:52:49.494 --> 00:52:50.780
I just want to be mindful.
00:52:50.780 --> 00:52:53.481
I think Chan has them two o'clock in four minutes Okay.
00:52:53.561 --> 00:52:55.106
Oh, yeah, I do yeah.
00:52:56.016 --> 00:53:03.648
So, Chan, sorry, should we schedule this meeting offline instead of right now?
00:53:03.648 --> 00:53:09.722
I was thinking we'd take some time to schedule it now, but what do you yeah let's schedule it offline I have to look at the calendars too.
00:53:11.858 --> 00:53:20.054
Okay, but based on this meeting, it seems like I have some homework to do with the team, so probably next week is not a good week anymore.
00:53:20.054 --> 00:53:24.034
It's probably be the first week of December, okay, great.
00:53:24.034 --> 00:53:30.804
Because a lot of people are not even working this week, so I can't help anyone and I'm thinking at least an hour.
00:53:32.134 --> 00:53:33.981
Okay, does that sound right, ashlee?
00:53:34.235 --> 00:53:35.900
Yeah, whatever time you need.
00:53:35.900 --> 00:53:38.340
If you need an hour and a half, let me know.
00:53:38.340 --> 00:53:39.402
I just need to know in advance.
00:53:40.215 --> 00:53:42.382
Should we do an hour and a half and then, if we don't need it, we could just-.
00:53:42.574 --> 00:53:44.842
Yeah, since we're doing introductions, yeah, let's do an hour and a half.
00:53:45.384 --> 00:53:47.740
Okay, oh, I think you lost them.
00:53:47.740
--> 00:54:00.043
Uh-oh, maybe I don't know if he meant to do that or it looked like he was I don't know if I can call him back in actually.
00:54:00.996 --> 00:54:03.516
It's okay, we can follow up with that piece, right Okay?
00:54:06.639 --> 00:54:07.563
Oh, he's trying to get back in.
00:54:07.563 --> 00:54:11.063
Okay, hey Chan.
00:54:12.094 --> 00:54:12.737
Hey, it's all right.
00:54:12.737 --> 00:54:15.884
My laptop died even though it was plugged in, no problem.
00:54:15.884 --> 00:54:21.320
My battery's just working, so I don't know why my laptop died, so I have to call you on my phone.
00:54:21.916 --> 00:54:24.610
No problem, teams sucks the energy out of my laptop.
00:54:24.610 --> 00:54:25.838
I don't know if you're on a Mac, but-.
00:54:26.994 --> 00:54:30.483
No, we're on a PC, but yeah, I don't know what happened.
00:54:30.945 --> 00:54:31.467
Okay, all right.
00:54:31.855 --> 00:54:37.161
But sorry, the last thing I heard was an hour and a half for now, and then something, something, and then it just died.
00:54:38.036 --> 00:54:44.878
Okay, so I was just saying let's schedule it for an hour and a half and then if we don't need it, we can call get the time back.
00:54:45.655 --> 00:54:46.318
Okay, gotcha.
00:54:46.318 --> 00:54:50.346
No, I know I really appreciate you helping define the agenda.
00:54:50.346 --> 00:54:51.958
That's really helpful.
00:54:51.958 --> 00:54:58.431
It's just really nice to know there's expertise in guiding this process.
00:54:58.431 --> 00:54:59.534
I really appreciate it.
00:54:59.534 --> 00:55:01.369
I know the reason why we're doing this.
00:55:01.369 --> 00:55:03.500
I'm being honest we just don't have the expertise.
00:55:03.500 --> 00:55:04.885
We just don't.
00:55:06.135 --> 00:55:06.657
Absolutely.
00:55:06.657 --> 00:55:11.501
It's honestly facilitating this type of thing is really challenging.
00:55:11.501 --> 00:55:16.804
It's something I really love doing, but most clients, most companies don't have the expertise.
00:55:17.215 --> 00:55:24.320
Yeah, it's just that we just have a lot of people who's experienced pieces and pieces of it and like, oh, this is what we want, and this is what we want, oh, this is cool to have.
00:55:24.320 --> 00:55:33.355
But then this is how it's really challenging putting it all into a true timeline and organizing it, and we just don't have that expertise.
00:55:33.355 --> 00:55:35.141
So I mean, we have a lot of opinions.
00:55:35.141 --> 00:55:38.389
I have my opinion about what you put it in the next guy.
00:55:38.389 --> 00:55:41.043
I have opinion and I can tell you it's not a line.
00:55:45.746 --> 00:55:46.389
So, this is nice.
00:55:46.389 --> 00:55:47.195
No, I appreciate it.
00:55:47.195 --> 00:55:48.483
Thank you for the conversation.
00:55:48.483 --> 00:55:49.268
Thank you for your time.
00:55:49.268 --> 00:55:52.184
If I don't talk to you again, have a happy Thanksgiving.
00:55:52.496 --> 00:55:55.500
Yeah, I'll follow up with you by email, shannon, and then we can try to aim.
00:55:55.500 --> 00:56:00.003
Maybe we could just put something like tentative on the calendar so it's blocked off for the four of us.
00:56:00.003 --> 00:56:09.282
So I think Marco will want to be here too, if he can, and then at least we have a hold, and then if it doesn't work, we can always move it around.
00:56:09.663 --> 00:56:10.324
Okay, perfect.
00:56:10.324 --> 00:56:13.083
And then I got some homework to do with our leadership team.
00:56:14.615 --> 00:56:15.277
Good luck with that.
00:56:15.277 --> 00:56:16.721
All right, shannon, thanks a lot.
00:56:16.721 --> 00:56:21.114
Thanks again for the opportunity.
00:56:21.114 --> 00:56:23.824
Hopefully see you meet you in person sometime in Minneapolis.
00:56:24.137 --> 00:56:25.195
Okay, definitely, thank you.
00:56:25.335 --> 00:56:26.340
All right, take care.