Whereas in a design build model, if something happens on site, it's our fault.
00:00:03.839 --> 00:00:12.480
Um, and there's only one person to point the finger at, we can't say, Oh, well, the detail wasn't clear in the drawings because we did the drawings.
00:00:12.720 --> 00:00:26.239
Um, and so we only can point the finger at ourselves and and you know, we're you know, we're not perfect, and so we do sometimes end up pointing the finger at ourselves and say, hey, we we made a mistake and we're gonna step up and and resolve the issue.
00:00:26.559 --> 00:00:38.799
This week's episode is with Mike Patterson, the principal and vice president of construction at Marmol Radziner in Los Angeles, or at least they're base out of Los Angeles, they have multiple offices.
00:00:39.039 --> 00:00:40.960
So, first, uh a confession.
00:00:41.119 --> 00:00:53.200
Uh, before I was connected with Mike, I actually didn't really know the firm by name, but then I started reading and immediately realized that I've been looking at Marmol Radziner houses for years.
00:00:53.679 --> 00:00:59.520
The Kaufman House and Palm Springs for one, I think several others that I've seen across the country.
00:00:59.679 --> 00:01:06.000
Uh I went into the interview with Mike thinking that they were also design-build only.
00:01:06.079 --> 00:01:09.040
And as you'll hear, Mike's correct me appropriately so.
00:01:09.280 --> 00:01:13.280
They actually built for other architects too, and they will design exclusively as well.
00:01:13.519 --> 00:01:26.560
So I think that was actually potentially a really great thing for the conversation because it never became that cliche comparison of is design build better than a traditional model of architect and builder or vice versa.
00:01:26.879 --> 00:01:28.719
It was always that both work.
00:01:29.040 --> 00:01:35.519
And what I think ended up happening, though, as a result of it, is it became a conversation about what holds any team together.
00:01:35.680 --> 00:01:42.560
And that's, you know, including the cliche triangle of architect-builder client, whoever happens to just be in that room.
00:01:42.799 --> 00:01:49.760
But after the episode recorded and I was able to, you know, go back, I edit these things myself and kind of listen to it.
00:01:50.079 --> 00:01:57.680
Mike made me see that I'd kind of been skipping part of it, or at least in in terms of articulating it.
00:01:57.920 --> 00:02:13.280
I think what he did a really great job at saying was a team is really easy when the job is going well, and the measure of a project, or the measure of a team, I guess, is really going to occur when there are hard moments.
00:02:13.520 --> 00:02:17.759
And the truth is that there's going to be hard moments on every build, even the best build.
00:02:18.000 --> 00:02:23.439
Some of them are probably really healthy, and others potentially avoidable.
00:02:24.240 --> 00:02:31.120
Not everyone on a project does the same things the same way, especially when there's so many pieces that are going to be involved in it.
00:02:31.439 --> 00:02:42.400
But I think that what's important is that every single one of those entities can be an asset with the right approach, so long as every one of us is there to advocate for the client.
00:02:42.639 --> 00:02:58.240
Mike and I's conversation naturally kind of flowed into asserting that, you know, while it seems self-evident, saying it is really important, it can never become the client's problem to sort out how to advocate for the team.
00:02:58.479 --> 00:03:04.319
And that's whether it's under one roof or under three, the client is not meant to be the referee.
00:03:04.800 --> 00:03:06.800
So I hope you enjoyed the episode.
00:03:07.039 --> 00:03:11.039
I think Mike has a lot better job at articulating all of this than I can.
00:03:11.280 --> 00:03:13.280
But uh, here's Mike.
00:03:15.599 --> 00:03:21.680
Um, well, hey, Mike, I appreciate uh you taking the time to do this.
00:03:21.759 --> 00:03:27.919
It's I I know everyone in this industry in general is super busy and uh everyone's schedule is really valuable.
00:03:28.000 --> 00:03:30.400
So um it's greatly appreciated on my end.
00:03:30.719 --> 00:03:30.960
Yeah.
00:03:31.280 --> 00:03:37.680
Um thanks for having me, Alex, and always always enjoy uh exchanging great ideas with other talented builders.
00:03:38.000 --> 00:03:38.960
Appreciate that.
00:03:39.199 --> 00:03:47.919
Um in some of the past episodes I've done my best to introduce people, only to realize that the best people to introduce themselves are you yourself.
00:03:48.080 --> 00:03:53.280
Uh so why don't you just give us a brief rundown of who you are and uh we can start there?
00:03:53.680 --> 00:03:54.000
Sure.
00:03:54.400 --> 00:03:57.439
Yeah, so um, yeah, so I'm Mike Patterson.
00:03:57.520 --> 00:04:02.080
I'm the uh principal and vice president of construction here at Marmal Radzeater.
00:04:02.479 --> 00:04:15.759
And we are a uh a design build firm um kind of based in Los Angeles, but we have uh operations not only in Los Angeles, but also San Francisco, uh Aspen, and New York.
00:04:16.240 --> 00:04:20.319
And we we truly are a uh design build firm at heart.
00:04:20.480 --> 00:04:29.839
So we're we're architects, we're landscape architects, we're interior designers, but we also have a full service construction operation, which I oversee.
00:04:30.000 --> 00:04:33.199
Um, we also have our own metal shop and wood shop.
00:04:33.279 --> 00:04:43.680
And so we really we really do feel like uh you know the design build approach has been a big part of yeah, what what we see as our success over the last 35 years.
00:04:44.240 --> 00:04:44.879
Awesome.
00:04:45.120 --> 00:04:55.519
And um I know you guys have been super involved in the AIA over the years, a lot of the publications I saw, some award-winning homes published countless times.
00:04:55.759 --> 00:05:06.720
Um, you know, you
Load full transcript
definitely uh exist in a certain uh on a certain end of the spectrum in terms of residential home building, if I'm not mistaken.
00:05:07.040 --> 00:05:07.920
Yeah, absolutely.
00:05:08.079 --> 00:05:16.720
You know, I think I think our passion and what we uh what we like to do the most is yeah, high-end residential uh custom homes for clients.
00:05:16.879 --> 00:05:28.079
Um, you know, we really enjoy um the the process with clients and that kind of really personal connection that we all that we all establish throughout the life of a project.
00:05:28.240 --> 00:05:33.439
Um and we've also just found that yeah, projects with clients are better.
00:05:33.600 --> 00:05:48.800
You know, we we've also done some some speculative projects and development projects over the years, and those are great for what they are, but we really do love the kind of result that we get when we have that kind of client input uh throughout a project.
00:05:49.199 --> 00:05:49.839
Yeah.
00:05:50.560 --> 00:05:58.639
Um one of the things that I specifically am really interested to talk to you about, and I know we had touched on it on the phone call that we had had before this.
00:05:58.879 --> 00:06:04.480
So you'll be the first design build firm that I've had on the podcast.
00:06:04.639 --> 00:06:10.879
And it's something that the concept of design build has always been in my mind.
00:06:11.120 --> 00:06:14.879
And in full transpensary, we are just a GC company.
00:06:15.040 --> 00:06:16.639
We do not have in-house design.
00:06:16.800 --> 00:06:18.160
I have a design background.
00:06:18.319 --> 00:06:23.600
I've joked many a time that that makes me dangerous, but also a resource to some.
00:06:23.920 --> 00:06:38.480
Um but I think that the value add at a very high level is this the singular trajectory of design, construction, shaking hands.
00:06:38.639 --> 00:06:42.319
It it makes sense at a very high level to a lot of people.
00:06:42.639 --> 00:06:50.160
In my experience, a lot of design build firms have been contractor first and then transition into design build.
00:06:50.240 --> 00:06:53.759
But I I believe, if I'm not mistaken, you are is actually the opposite, correct?
00:06:54.079 --> 00:06:55.040
Yeah, we we are.
00:06:55.199 --> 00:06:59.040
So we are kind of an architect-led design build firm.
00:06:59.279 --> 00:07:11.279
And you know, I I think our story of coming into that, it's it's a bit interesting where you know we we kind of started our practice back in 1989.
00:07:11.519 --> 00:07:22.079
Um, and one of our first major projects was a renovation of the Coffin House in Palm Springs, which was a Richard Neutra home, uh, a beautiful project.
00:07:22.319 --> 00:07:28.560
Um, and the home was in in poor shape and and needed a lot of love, uh, to put it lightly.
00:07:28.879 --> 00:07:45.600
And we, you know, we began that project as the architect, but very quickly kind of grew into also being the contractor on the project to kind of solve what we felt
like were some deficiencies with what we were seeing with local contractors at subcontractors.
00:07:45.839 --> 00:07:52.399
So, in a way, we grew into the design build model to to kind of solve a problem that we were having.
00:07:52.560 --> 00:07:59.199
Um, we didn't, we didn't, I don't think on day one be like, oh, we want to be a design build firm, as if it's like a buzzword.
00:07:59.360 --> 00:08:14.800
We really kind of felt like design build improved some deficiencies in the process that we were experiencing as architects, um, which certainly isn't to say that there are many talented builders out in the desert and talented builders everywhere.
00:08:14.959 --> 00:08:15.920
It's not to say that at all.
00:08:16.000 --> 00:08:28.079
It's just that we we kind of felt like, oh wow, as we had control of the entire process, we felt like it would give us a bit better control over schedule and quality.
00:08:28.240 --> 00:08:34.720
And ultimately, I think our main goal is, you know, kind of giving our clients the most enjoyable process possible.
00:08:34.879 --> 00:08:48.399
And so uh having that single source of responsibility uh from the client perspective, I think we have found to be is something that our clients uh do enjoy and like about that design build process.
00:08:49.440 --> 00:08:57.840
Uh it's interesting to hear you say that because I actually uh yesterday did an interview with a friend of mine who's a very accomplished local general contractor here.
00:08:58.000 --> 00:09:00.480
Um an incredible resume.
00:09:00.639 --> 00:09:13.440
And we were actually talking, because we have a shared background and passion for design, on how every project, the requirements from the design GC scopes are a little bit different.
00:09:13.600 --> 00:09:17.279
And some, you know, some it's very important that the contractor stays in its lane.
00:09:17.519 --> 00:09:21.840
Design team is very, you know, forward thinking and able to take those reinforcements.
00:09:22.080 --> 00:09:25.840
There's other times when they actually rely on us to give that design input.
00:09:26.080 --> 00:09:41.200
And I thought that he did a really great job at articulating something that in today's day and age, it's so easy for people to think in just these blanket statements, in that design build is either good, bad, some high level, low level, you know, premium, not premium, GC.
00:09:41.679 --> 00:09:44.799
It the reality is that there's so many different ways to do this.
00:09:44.879 --> 00:09:49.360
And I think it's always a better approach to solve a unique problem.
00:09:49.840 --> 00:09:52.960
Um, you know, and every and and there's multiple ways to do that.
00:09:53.039 --> 00:09:59.039
And if people can have insight into that process, I think it oftentimes makes it more approachable for them as well.
00:09:59.360 --> 00:09:59.840
Right.
00:10:00.080 --> 00:10:13.919
Yeah, I think, you know, I think you bring up a really good point, which is, you know, there's kind of uh there's no one size fits all solution, I think, in in probably any industry, but certainly in construction, you know, each project is unique.
00:10:14.080 --> 00:10:21.120
And, you know, I think while while we love design build, it it's not necessarily the right approach for every project.
00:10:21.360 --> 00:10:31.759
We we actually have a number of projects where uh we are building for other architects, you know, we're building homes for Walker Warner and for Study and and other architects.
00:10:32.000 --> 00:10:39.440
And you know, we're we're happy to kind of bring expertise to projects in that capacity where it where it makes sense.
00:10:39.600 --> 00:10:57.120
And so um I think the point you bring up, I I appreciate a lot, which is yeah, thinking kind of openly and creative, creatively about the project at hand and how as a builder or a design builder, yeah, how do we bring value to this project for the client, for the team?
00:10:57.279 --> 00:11:04.159
Um, and and so for us, that that tends to be in a lot of different permutations as as maybe just a builder.
00:11:04.320 --> 00:11:12.320
We also are happy to have our cabinet shop build cabinets for other general contractors if that's kind of useful to a project.
00:11:12.480 --> 00:11:17.679
And so I think we're always kind of looking at do we offer kind of these this breadth of services?
00:11:17.919 --> 00:11:22.639
How do we deploy those in a way that's kind of most helpful to a project or a client?
00:11:23.519 --> 00:11:30.960
So I would assume you probably added the different divisions over a period of time, you know, the metal shop, the cabinet shop, and things like that.
00:11:31.679 --> 00:11:35.440
Was that almost a doubling down of the design build method working for you?
00:11:35.600 --> 00:11:39.360
The more control you could have, the better the product was, or what was the motivation for that?
00:11:39.440 --> 00:11:44.159
Because frankly, I think that sometimes people think, oh, having the cabinet shop is this giant money maker or something like that.
00:11:44.320 --> 00:11:49.360
And I can assure you it's not, you know, there's other problems that need to be solved.
00:11:49.679 --> 00:11:50.399
Yeah, yeah.
00:11:50.480 --> 00:11:52.320
No, like you're yeah, that's spot on.
00:11:52.399 --> 00:12:10.080
So I think, yeah, we similar to how we we grew into general contracting, it is how we grew into building cabinets, is is we we felt like maybe we weren't getting the quality and and control that we wanted uh on some of our cabinets.
00:12:10.320 --> 00:12:13.759
And so we're like, hey, let's let's let's build cabinets ourselves.
00:12:13.840 --> 00:12:22.799
And and I think to your point, I wouldn't even say that building our own cabinets is necessarily look, it's a lot more to manage.
00:12:22.879 --> 00:12:25.519
It's a whole nother business, and there's risk in that.
00:12:25.679 --> 00:12:33.279
And and um, so it it creates it creates a fair amount of of
work for us to do that.
00:12:33.440 --> 00:12:45.919
But we think that the we think that the benefit on the back end of having that control and really being able to control the quality is is kind of worth that that upfront headache of running a cabinet shop.
00:12:46.159 --> 00:12:52.639
And we we similarly do, you know, we've kind of grown into some other parts of the of the trade world as well.
00:12:52.799 --> 00:12:58.240
So we have our own concrete crew, either structural concrete and architectural concrete.
00:12:58.399 --> 00:13:03.279
Uh, we have our own finished carpentry crew, we have our own landscape installation crew.
00:13:03.440 --> 00:13:18.960
And I think all of those kind of internal trades, they did come about in the in the same way or for the same reason, which was just us trying to kind of solve or improve what we felt like could be uh uh a better part of the building process for us.
00:13:19.519 --> 00:13:21.440
How many people are on staff for you?
00:13:21.919 --> 00:13:26.799
Yeah, so we currently on the construction end have about a hundred staff members total.
00:13:26.960 --> 00:13:39.519
So that includes uh you know, that includes yeah, as a general contractor, project managers and site supervisors, but yeah, then all of our internal trades and our shops, it's yeah, it's about a hundred total.
00:13:39.759 --> 00:13:54.559
One one thing that I you know that's nice, you know, we have a kind of our own internal um skilled uh utility guys as well, which I think, you know, as you as you know, kind of the last the last month or two of a project is is kind of the hardest.
00:13:54.720 --> 00:14:05.919
Like, you know, closing a project out for us is like, wow, that's that's the time where we really need to be locked in and you know, everything has to happen on schedule, things need to get done.
00:14:06.159 --> 00:14:14.480
And so we really we really value, we have a a number of utility guys that they can do drywall, they can do painting, they can do concrete.
00:14:14.559 --> 00:14:25.039
And so when it comes time to be punch listing projects, we we really like having that uh internal capability to just kind of knock out the punch list and and and be done.
00:14:25.360 --> 00:14:26.080
Oh my gosh.
00:14:26.399 --> 00:14:34.320
I mean having that uh in your quiver uh uh tool belt is just that that's the ultimate at the end of a project.
00:14:34.399 --> 00:14:36.159
It that reduces stress tenfold.
00:14:36.240 --> 00:14:45.919
I've joked that the best site super I could ever have could also do a little bit of drywall work at the same time, you know, which is such a weird thing to ask of somebody, but it is such an important part of project closeout.
00:14:47.440 --> 00:14:59.039
I hear all these different phases, and I've talked to other builders, people in the business, you know, really focused on the business side of building that have made the opposite argument.
00:14:59.360 --> 00:15:16.159
And again, I don't think that
one is more right than the other, but what I do always find interesting is how the you know the Marmal Radzi inner model of everything in-house, or as much as possible, I guess, with an uh to a certain degree, caters to the user experience, in your opinion.
00:15:16.399 --> 00:15:23.039
Because I think from my perspective, I think that that's the biggest sell of everything that you're accomplishing.
00:15:23.679 --> 00:15:24.159
Yeah.
00:15:24.399 --> 00:15:28.399
Yeah, I think I I think that's exactly the way the way we view it as well.
00:15:28.559 --> 00:15:34.080
At the end of the day, this is all in service of uh providing service to a client.
00:15:34.159 --> 00:15:40.879
I think we're, you know, uh certainly with custom residential design and construction, it is a service-based industry.
00:15:40.960 --> 00:15:53.200
And I think, you know, clients are coming to uh reputable firms like yourself and and and Mom Radziner um because they know that the the project is going to be handled well.
00:15:53.600 --> 00:16:18.399
And and I think that we're always looking to make decisions about our operations and and how we approach projects through that lens is how do we how do we kind of deliver the client the most the most seamless experience that they can have because even you know, even I do think in its most perfect incarnation, construction is still construction and and things are going to happen and and mistakes will be made.
00:16:18.480 --> 00:16:35.360
And for us in many ways, it's you know, we obviously want to avoid those mistakes to the greatest extent possible, but it's almost more important how we how we deal with mistakes and move past them um more than than the mistake happening in the first place.
00:16:35.600 --> 00:16:38.399
So yeah, it's interesting.
00:16:38.480 --> 00:16:50.000
Um I did I did client work for a uh lawyer at one point in time, and we were just going over he he was, of course, asking how I execute contracts with subcontractors and things like that.
00:16:50.159 --> 00:16:53.360
And the concept of subrogation came up.
00:16:54.320 --> 00:17:10.640
And he actually conveyed to me that he didn't want like that much subrogation because that actually, you know, basically passing the liability and responsibility down the line to the next person, to the next person, to the next person, which if that was my lawyer, he wants all that subrogation.
00:17:10.799 --> 00:17:25.119
But him as the client, he wanted a single source, a single person to talk to, because everything else in his experience showed to be a heavy lift, aka a point of stress when those inevitable moments come along.
00:17:25.359 --> 00:17:28.480
And I think there's obviously multiple ways to uh handle that.
00:17:28.640 --> 00:17:35.440
But when everything is in-house, there is a serious sell to be like that is as self-evident of a process as possible.
00:17:35.599 --> 00:17:40.720
Um which in my mind also means efficiency, cost savings, schedule drivers, things like that.
00:17:40.960 --> 00:17:50.720
Um would you say that the approach that you have, I you know, the word cheap is never meant to be a part of this, but you know, I think efficient is an appropriate term.
00:17:51.200 --> 00:17:59.920
Um as time has gone on and you have brought these things in house, would you say that efficiency has become a part of it, or is it more so just solving a different problem?
00:18:00.319 --> 00:18:08.799
Yeah, I I think efficiency is certainly is certainly a part of I think our our belief in in the design build process.
00:18:08.960 --> 00:18:22.880
And you know, even from a financial perspective, if a client does come to us from day one and say, um, you know, we'd like to hire you for design and construction, we we actually lower our fees on both sides of the product.
00:18:23.039 --> 00:18:28.799
For our construction fee is lower and our architectural fee is lower because you know we're doing both.
00:18:28.880 --> 00:18:31.599
And for us as a business, it's a larger project.
00:18:31.680 --> 00:18:41.279
Um, so overall, the client ends up paying less architectural fee and less uh construction fee than they would if they were to hire, you know, two separate entities.
00:18:41.519 --> 00:18:50.640
And and the reason we do that and and justify with our clients is we're like there is an efficiency to the process when we're the architect and the builder.
00:18:50.720 --> 00:19:00.799
And so we maybe do spend a little bit less less time on circular communication or waiting for questions to get answered than we would otherwise.
00:19:00.960 --> 00:19:11.680
And we're gonna we pass those savings on to the client um uh because we're maybe spending a percentage less time on the project due to that, due to that efficiency.
00:19:11.839 --> 00:19:33.200
If if we're in the middle of construction and we have an issue that that really needs uh a quick conversation to solve to keep things moving on site, you know, I can walk over to the desk of the architect here in our office and say, hey, can we can we sit down and look at this real quick and um and we just kind of solve a problem that might otherwise you know linger for for a few days?
00:19:33.519 --> 00:19:34.559
Yeah, yeah.
00:19:36.480 --> 00:19:46.799
I have always been uh let's say jealous of the design community for their ability to be iterative in the geography that they can, you know, work in.
00:19:47.039 --> 00:19:58.400
You could be based out of San Francisco and do projects in Aspen, New York, anywhere in the world without the physical presence required in, say, if you were on the general contracting side of things.
00:19:58.640 --> 00:20:10.000
In a lot of the companies, a few, you know, exceptions, obviously, um, but most of the companies that I know that have national presence, I think it's always really hard for a builder to have that national presence.
00:20:10.079 --> 00:20:15.920
It's it it you have to have almost a commercial approach and be
really efficient with those systems.
00:20:16.000 --> 00:20:20.079
And I also think there's probably a scale of economy that's associated with it as well.
00:20:20.400 --> 00:20:35.440
I don't know really off the top of my head in the residential world, obviously a lot in the commercial, but design-build companies that have been able to iterate different locations in the United States, especially when you have as much in-house as you guys do.
00:20:36.000 --> 00:20:36.960
How does that work?
00:20:37.119 --> 00:20:40.160
So, you know, because I know I think some of your shops are in LA, right?
00:20:40.480 --> 00:20:40.799
Yeah.
00:20:40.960 --> 00:20:48.240
So our yeah, our our cabinet shop and metal shop are here uh in in Los Angeles, as well as our main office.
00:20:48.400 --> 00:20:54.880
Uh, and then we do have our satellite operations in Aspen, uh, San Francisco, and New York.
00:20:55.200 --> 00:21:08.960
And I I think you're uh uh I think that's a really good point you make, which is I think construction especially, it's a it's a unique industry that is it's difficult to grow into to new markets, at least quickly.
00:21:09.119 --> 00:21:18.960
I think because you know, I I I think our belief as a general contractor is you know, we're we're only as good as our relationships with our subcontractors.
00:21:19.119 --> 00:21:30.960
And good relationships take years and years and years to build and establish because there's so much trust that's required in construction uh between subcontractors and general contractors.
00:21:31.200 --> 00:21:43.599
And so, you know, I think as as we have grown into markets like uh New York and San Francisco and Aspen, we've done so yeah, over a long period of time.
00:21:43.759 --> 00:21:58.720
So that out of you know the model in Los Angeles of us building a lot of homes down here and really having a deep cut subcontractor pool and a lot of relationships, it's not it's not easy to just kind of clone that in other markets.
00:21:58.880 --> 00:21:59.680
You kind of have to grow it.
00:22:00.240 --> 00:22:04.640
in the same in the same kind of slow way and that's the way that's the way we approach.
00:22:05.440 --> 00:22:12.000
Was there any I mean was it that you guys went design first into a market and then had the construction teams follow behind?
00:22:12.160 --> 00:22:16.640
Is that you know because I'm assuming that you need some capital, some presence, some networks, right?
00:22:16.720 --> 00:22:21.279
I was just I just got an email yesterday to do a project in Summit County.
00:22:21.359 --> 00:22:24.319
And I was like, I don't even know who I would call for a foundation.
00:22:24.400 --> 00:22:26.480
I like I I can't be doing that project.
00:22:26.559 --> 00:22:26.880
Right.
00:22:27.039 --> 00:22:29.599
Um so I I'm fascinated by how you've done it.
00:22:29.839 --> 00:22:30.240
Yeah.
00:22:30.480 --> 00:22:49.440
Whereas you know I think on the design side you kind of can, you know, if if a project comes up in a market that's that's in outside of your normal region, you know, as long as you learn the local building codes and and kind of understand the zoning laws, then I think architecturally it's maybe a bit easier to grow quickly into other markets.
00:22:49.519 --> 00:23:01.839
Whereas I think construction is so rooted in people and materials that that you know they're just not it's not a matter of this kind of just digital reproduction of a of a business operation.
00:23:02.000 --> 00:23:08.240
It's very people heavy and and people you know and relationships take take time to grow.
00:23:08.480 --> 00:23:17.119
But to answer your question about kind of growth into new markets and and kind of what leads with us, we've actually done it both ways.
00:23:17.279 --> 00:23:29.599
So uh New York and San Francisco, we did grow grow into those markets primarily as as architects and then you know got into the building side of it out in those areas as well.
00:23:29.839 --> 00:23:38.079
Whereas in Aspen we we actually are grew into that as a builder andor a builder only operation in Aspen.
00:23:38.319 --> 00:24:06.400
So we we only have a construction office in the Rocky Mountains and all of our projects out there are building for other architects which we also very much enjoy you know get getting exposure to building for other architects you see different materials different ways of drawing just fresh ideas and and I think the value we bring to other architects as a builder is they can kind of have that design build process or language without having to start a construction company.
00:24:06.559 --> 00:24:16.079
They can just have us come in we kind of speak an architectural language I myself am I'm an architect by training I've just always enjoyed the construction side of the profession.
00:24:16.319 --> 00:24:28.799
But I think that when we start working with other architects as a builder they I think they kind of appreciate that we speak the same language and there's a synergy of of of the way we work with them.
00:24:29.200 --> 00:24:39.119
I think that that's actually because you know Aspen's such a unique place and I'm sure there's other markets that you guys exist in as well where people have access to the world market if you are building in a place like that.
00:24:39.359 --> 00:24:48.960
As you guys have grown to a hundred people I'm assuming there's benefits that happen then for a market like Aspen that you're able to bridge those gaps.
00:24:49.200 --> 00:24:55.519
I'm sure that there's also some that I'm not even thinking of um in your experience is that kind of the case?
00:24:55.680 --> 00:24:58.880
Because it scares me to try to build in a place like that.
00:24:59.200 --> 00:25:46.640
Yeah it it definitely you know I think some of these Rocky Mountain markets Aspen Boslitt uh Jackson Hole they're they're they're interesting markets and there's kind of some similarities between them in that there are some very very talented subs
and and great craftsmen in all these areas but they're limited um and whereas in a market like Los Angeles we there's there's 20 great electricians in any given time that we could rely on if we had to you know whereas in a in a market like aspen you maybe have have one or two that you really you would would want and and so there's just limited resources and I think that um we do we do very much supplement our construction operations in aspen with our own internal trades.
00:25:46.799 --> 00:25:59.599
So uh you know with with cabinetry and finished carpentry we'll oftentimes yeah build the cabinets in our shop and either send our guys out to install them or partner with a local installer to install cabinets.
00:25:59.920 --> 00:26:59.839
We'll oftentimes send our finished carpentry crew out or in the yeah in many cases uh our concrete crew will send our concrete foreman out to aspen to kind of help oversee and manage the the subcontractors on site uh to make sure that the level of quality is being executed uh in the way that we would like and so we do yeah we do see a benefit of having you know kind of a robust number of tools as you mentioned to draw from uh so that we could kind of deploy those to some of these markets where the the local resources are a bit more limited you said something on our call that I found absolutely fascinating you mentioned that a lot of your clients actually had built before but maybe in the design uh you know builder architect model not and then are transitioning to the design build model and there is some kind of rationale from their perspective as to why to transition specifically over to the model.
00:27:00.480 --> 00:27:11.039
I'm fascinated to know more about that have you elaborate on it but I I I want to just contextualize that by saying that I don't think that that in any way shape or form is a commentary on one model versus the other.
00:27:11.119 --> 00:27:24.640
If anything there's probably tons of takeaways that me as a GC can be more aware of like what is the mechanism there that one model is maybe a little bit more prone to come short on versus another and then I'm sure that that works in both directions.
00:27:24.960 --> 00:27:30.559
Right totally yeah and I I want to preface yeah this as well by echoing exactly what you said.
00:27:30.720 --> 00:27:44.319
I I don't think we don't view this as a as a zero sum game where because design build works it doesn't mean that other models don't work like everything everything can work and when they're done well it all does work.
00:27:44.480 --> 00:29:28.799
So these are just different ways of approaching the same problem and and and so I think for us yeah we do we have a number of clients who you know maybe have gone the traditional route with a separate architect and builder and ended up coming back to us because I think they sometimes would see that they would you know get pulled into almost being a mediator uh in in conflict in a project if if there's an issue on site you can sometimes get into the traditional you know the contractor blaming the architect the architect blaming the contractor and the owner gets pulled into that to have to make a you know a decision on on on who they feel the problem is whereas in a design build model if something happens on site it's our fault um and there's only one person to point the finger at we can't say oh well the detail wasn't clear in the drawings because we did the drawings um and so we only can point the finger at ourselves and and you know we're you know we're not perfect and so we do sometimes end up pointing the finger at ourselves and say hey we we made a mistake and we're gonna step up and and resolve the issue um and so yeah some some of our clients have have definitely kind of you know come back to us with that with that perspective but but as you said um it there's absolutely nothing wrong with with the separate architecture and contractor and some of our clients appreciate the separation of of those two parties and and um we we have no kind of um mandate about how we work we have you know we have the things we enjoy to do and if if we can do both design and construction wonderful but we're just as comfortable working you know in a in a more traditional setup as well.
00:29:29.839 --> 00:29:34.319
If you don't mind me asking do you operate on a cost plus contractual basis or fixed?
00:29:34.400 --> 00:29:49.440
Because majority of the design build companies I I've been aware of are transitioning to that fixed yeah so our you know I would say the bulk of our projects we work in cost plus fee uh probably 75% of our construction work is cost plus fee.
00:29:49.599 --> 00:30:04.559
We're always open to doing stipulated sum uh projects um and you know we we just discuss with the client at the time uh so it's kind of bidding is you know what are what what's important to you because there's pros and cons to both.
00:30:05.359 --> 00:30:13.440
We we approach the estimating process the same either way whether it's uh going to be a stipulated sum or a cost plus fee.
00:30:13.680 --> 00:30:30.400
Our goal in estimating the project is to build it on paper in our heads really understand what all the costs are and give a budget that we feel is comprehensive, accurate, honest, whether we're gonna bill stipulated sum or cost plus fee.
00:30:30.559 --> 00:30:46.000
And so then the question just comes down to the client we which we'll always ask was you know is it is it more important to you to just not have to worry about cost and just you know you're gonna write off X amount of dollars for the project and and just not worry about it.
00:30:46.240 --> 00:30:54.640
Or would you like you know the opportunity to possibly save some money and and only pay the actual costs incurred our budget is kind of the same either way.
00:30:54.799 --> 00:31:08.400
We're never gonna we don't take the approach of of you know kind of trying to estimate a project to present the
lowest number we possibly think the project could be we're always looking to present what we think is the realistic budget.
00:31:08.559 --> 00:31:33.119
Even if that number is is a tough pill to swallow we would rather have that conversation at the beginning of a project with a client and be be open, set a realistic expectation otherwise I think we always find that we'll be chasing that problem through the a low budget from the beginning can just be something you have to chase through the whole project and it rears its head in in a number of of unsavory ways throughout a job.
00:31:34.079 --> 00:31:57.680
Everything is about managing expectations in this business um would you say that you're more inclined to do uh or offer a fixed if the design is in-house as opposed to it being a third party um I I I would say we're happy to offer fixed as long as the drawings are are what we feel like is complete and and kind of accurate.
00:31:57.839 --> 00:32:07.119
So you know I think the projects we do stipulated some more often than not are new construction projects where you know they're it it's it's easier to to see the scope.
00:32:07.200 --> 00:33:07.839
Everything is new we know that it's not a renovation where we you know we're going to get into the project and yeah find out that there's things working in the walls as there always are um so most of the projects we do stipulated some are new construction that have really good you know full complete construction documents whether we're the architect or not as long as we have that kind of um set of drawings to go off of then we're happy to go stipulated some and in many ways we we like the simplicity of stipulated sum as well from a billing perspective um you know cost plus B bills are you know they're 200 pages of backup and there's administrative uh uh support that is required to put those very very long detailed bills together whereas the stipulated sum billing is just billing percentage of progress on the pre-agreed upon numbers and so yeah there is there is a nice simplicity of stipulated sum that when we do those projects we're like oh yeah this is this is nice.
00:33:08.079 --> 00:33:23.759
Yeah so I've only worked with an owner's rep one time but any time that there's a potential for one to be you know involved I actually lower that bookkeeping admin number because I know that there's somebody that has that expertise bringing into the position and is interpreting that information with that lens for the client.
00:33:24.799 --> 00:33:45.599
The other is you know kind of segueing off that owner's rep model that's the other big sell for me of a design build approach because I a word I love I'm you know trying from a business model standpoint but I also think that the industry could maybe do a little bit better job at adopting is being a steward of these projects for people.
00:33:46.079 --> 00:34:00.640
And you know at a certain point in time you know I I I try to convince people that I'm not just
my job is not to build like I'm not a contractor let's just pretend my job is to advocate for you as my client the way that I'm going to do that is by building you a home.
00:34:00.799 --> 00:34:03.759
That's just the mechanism I use to do that.
00:34:04.720 --> 00:34:40.719
Communication is the biggest part of that for you when you're in that design build model is it more so a central point of communication that the client is receiving because for me that that means that you know to put it in easy to interpret, easy to digest you know, information or documents for a client is just so much easier and uh better for the user experience than would be one set of documents coming from the construction team, one set of documents coming from the architecture team we're hoping that they are cohesive and in perfect alignment um you know but oftentimes that's not a realistic expectation given deadlines.
00:34:41.119 --> 00:35:37.440
Yeah yeah for sure so with yeah when we are doing a project in in the design build scenario really the construction project manager does become the the the tip of the spear the point of contact for the for the owner or the owner's rep throughout construction and you know certainly you know like all projects you know the owner may want to change things or for yeah make make alterations to the design during construction if they do then we have the architectural team involved in in helping um make those make those decisions but the construction uh PM really is the the single point of contact for kind of all things related to the project and you know I think as as you know having built built for a long time and done done very big projects it is it's it's just always staggering to me how you know how much of a teamwork kind of profession construction is.
00:35:37.599 --> 00:36:21.760
And you know the I think the PM sometimes is maybe not not they saying get the gets credit isn't the right word, but everyone thinks the PM is is kind of the construction operation but it really is like an iceberg when you look below the water the number of people that it takes kind of moving in sync to make a project succeed is is kind of staggering from project engineers and our accounting staff and and um yeah you know in any given project there's probably 20 people behind the scenes who have a really important hand in in the success of the project and it all only works if that team is in sync and and kind of speaking the same language.
00:36:22.000 --> 00:36:48.559
So um yeah yeah I I I struggle with that in terms of the uh the client relationship side at times because I I'm sure you've experienced it as well where you almost want the client to feel the muscle behind everything and see every all the people all the hard work everything but it's almost you know overload for the client that also has their own life they're going they're you know they they have other things to be worrying about at the same time.
00:36:48.800 --> 00:37:00.480
And so you know it's this fine line that I'm always walking and I'm sure it is for you too where you're trying to show that muscle but then also make it perfectly digestible to where they feel confident have enough information to feel confident in that process.
00:37:00.639 --> 00:37:16.400
And I that you know that's where that PM um you know with you know that whether that person's trained in architecture or something else um I I think that architecture trade I've always thought that the best PMs I've ever worked along actually had their background in architecture not construction.
00:37:16.559 --> 00:37:25.360
And I say that growing up in the trades um but that point person being able to articulate that whole story is just such a pivotal piece of the client journey.
00:37:25.599 --> 00:37:57.760
Yeah yeah absolutely and yeah that that question you bring up right now we we we talk about this internally all the time and I'm not so sure we have have an answer one way or the other on on what we feel like is right but you know whether is the right approach to to really polish everything like perfectly for a client to see and so you know it's like oh this simple little thing or is it actually valuable for them to see all of the work and kind of things that were considered either ruled out one way or the other to come to this kind of suggestion for them.
00:37:58.480 --> 00:38:08.320
And I think we've we've kind of found over the years that we like to kind of learn but we'll learn early on in the process what the personality of our client is.
00:38:08.559 --> 00:38:15.599
We have some clients who you know they take the approach of we're paying you a lot of money to to handle this for us.
00:38:15.760 --> 00:38:16.639
So just handle it.
00:38:16.800 --> 00:38:38.639
And they kind of want, you know, when we come to them with whether it's a design or a construction issue, they just want the polished kind of suggestion and say hey we think we should do this um are you good with that whereas other clients want us to come and say we think you should do this but here's the four other things we considered in this process and we ruled them out for X, Y, and Z.
00:38:38.800 --> 00:38:49.280
And we have a few clients who who like to see that as well just to kind of understand that there was some the diligence and the and the decision making process on how we got to this suggestion.
00:38:49.440 --> 00:38:51.599
So I don't think there's a right or wrong answer.
00:38:51.679 --> 00:38:56.239
And it all kind of plays into the client's personality and they what they want.
00:38:56.639 --> 00:39:05.280
I think I'm up to 20 some episodes now over the last year and a half, two years that I've done this a few more that have been recorded that haven't been released.
00:39:05.599 --> 00:39:26.480
The one constant thread no matter who I am talking to that is always brought up maybe not articulated with this word but it is always brought up as being crucial to the process is the trust
mechanism that at the end of the day the successful project is based on there being trust between the people involved to actually make it and the client going through the process itself.
00:39:26.639 --> 00:39:36.159
And when I heard you just that that that is what that is about what what does trust look like for the client and the ability to cater to that specific need.
00:39:36.480 --> 00:40:00.559
Yeah yeah absolutely I mean I I think I I would I would echo that a hundred percent that at the end of the day you know uh general contracting construction is I mean it's there's a lot of contracts there's subcontracts there's prime contracts and there's a lot of language and jargon it no no contracts is is worth anything if there's not if there's not trust and a and a strong relationship.
00:40:00.719 --> 00:40:43.840
I think the culture of a project is such a such an important thing both to make the project work but I also think to make the project enjoyable for the client I uh it's important to us that not only does the client trust us but they that they like us you know we enjoy working on the project together and our our belief is yeah that that building a home should be a joyful uh joyful process it should be as fun as it was to design it um and and I think a huge part of that is you as you too is both trust but but yeah just also you know having that nice that nice culture around the project and and and the client seeing that everybody enjoys what they're doing.
00:40:43.920 --> 00:41:20.480
I think we like when a client walks on one of our job sites they see the passion and the joy that the team has for building the project it's not it's not just a job but yeah our finished carpentry team they they live and breathe wood and I think clients feel that well when they walk on a job site and and yeah hopefully they enjoy seeing that well Mike I want to be sensitive with your time um but I also there's one last question that I did want to touch on before I let you go just because it's something that I know I think it's unique that you guys are taking on as an endeavor but it's also something I'm personally very fascinated with.
00:41:20.719 --> 00:41:24.000
I know you have done some modular building if I'm not mistaken.
00:41:24.480 --> 00:41:25.039
Correct.
00:41:25.280 --> 00:42:18.880
I would love for you just to like touch on that what was the motivation to get into it because I do think that modular penalization whatever iteration of it it stands the test of time I do think it is going to have a very very large place in the future of building um especially when you take into consideration you the the shortage of trades uh people entering the trades uh resource uh you know issues that we have going on in the world today and all that kind of stuff um but I'd love to know why Marmal Radzinger chose to invest into those processes those types of projects yeah um yeah great question and yeah so we've been you know we've been doing prefab kind of modules uh uh construction you know since 2005 really um and where we kind of see prefab as really providing a lot of value to the industry is is exactly what you said in in areas that maybe the local resources are limited.
00:42:19.039 --> 00:43:29.199
So we've done both panelized and prefab projects in you know in in Hawaii and Moab Utah and in these areas that that you know maybe the local trades one there's a limited number of them um and so they they maybe can't keep up with the demand but you maybe also do run into some areas um we saw this in Moab Utah where the local trades weren't really used to building high-end uh modern buildings and so if we can do a prefabricated approach where we build the modules in in that case we built them in Los Angeles we can tap into the local expertise here in LA and really execute on a high level but then ship those to to markets like yes you know Moad Utah and then you have this beautiful wonderfully built uh modern building in the middle of of the desert is is um I think kind of the advantage most recently where we're where we're kind of using prefabrication is is in the in the fire rebuild area like the Pacific Palisades because similarly um you know um obviously there's there's a huge tax on local subcontractor labor.
00:43:30.719 --> 00:44:03.920
Everybody's just very very busy and so by moving some of the work off site and building the modules in this case we're building them in Washington and and shipping them to the Palisades we're able to kind of take some of that pressure off of the local off of the local labor market and also uh get the homeowner in there back into their house quicker which is an important thing to many of our clients who are rebuilding as well is they kind of want to they want to move past this really Really warmable kind of event that happened and get back into their homes.
00:44:04.079 --> 00:44:11.679
And so prefabrication allows us to be doing all the site work and foundations at the exact same time that the modules are being built.
00:44:11.840 --> 00:44:19.039
And we find that we could kind of compress the construction timeline by, you know, 40 to 45% in most cases.
00:44:19.360 --> 00:44:19.760
Wow.
00:44:20.000 --> 00:44:21.760
Uh to what extent are you prefabing?
00:44:21.840 --> 00:44:25.360
I'm sure it's different on every project, but you know, since you I didn't know that you had the concrete division.
00:44:25.440 --> 00:44:28.079
So are you precasting foundations and things like that?
00:44:28.159 --> 00:44:30.480
And, you know, obviously, you know, settings that allow for it.
00:44:30.559 --> 00:44:35.760
And I'm assuming wall panels, how far does that modular approach panel go?
00:44:36.159 --> 00:44:36.480
Yeah.
00:44:36.559 --> 00:44:41.360
So right now we're we're doing we're not doing any concrete kind of prefabrication.
00:44:41.440 --> 00:44:51.920
All the foundations and concrete work is kind of traditional on-site uh construction, but we're fully
prefabricating the home in in modules.
00:44:52.000 --> 00:44:58.079
And so they're they're wood frame construction modules, and they're varying sizes depending on the design.
00:44:58.159 --> 00:45:05.519
But yeah, they come out in you know pieces that are 10 feet wide by 20 to 30 feet long, and we crane them into place.
00:45:05.679 --> 00:45:29.840
And uh the most recent project be completed, it it was actually part of the case study adapt program uh in the Pacific Palisades, which is kind of a a reboot of the the classic case study program from from um um you know back in the 60s in in Los Angeles, and we did a a prefabricated home for um a musician here in Los Angeles.
00:45:30.000 --> 00:45:33.599
Uh him and his wife both play the violin and cello.
00:45:33.840 --> 00:45:51.599
And so we did this really great little prefab house for them that came out on semi-trucks in about 10 pieces and was set in a day, and they got to see their home kind of um uh come together and over the course of a of a of a morning and an afternoon, which is exciting.
00:45:51.679 --> 00:46:04.960
It for them, it was like there's something a bit performative about prefab in a way, you know, the choreography of the crane and the event of the crane day that I think really tapped into their personalities in a in a in a in a cool way.
00:46:05.119 --> 00:46:05.519
It was fun.
00:46:05.760 --> 00:46:07.280
Oh, what an interesting analogy.
00:46:07.599 --> 00:46:12.320
Yeah, uh, you know, because it's this calm cumulative or moment of culmination rather.
00:46:12.559 --> 00:46:17.280
Um what what percentage of the projects you guys are doing is prefab?
00:46:17.840 --> 00:46:21.760
Pretty it's a pretty small, I'm gonna say maybe five percent of our projects.
00:46:22.000 --> 00:46:22.239
Oh, really?
00:46:22.320 --> 00:46:22.400
Okay.
00:46:22.880 --> 00:46:32.079
So it's not yeah, you know, like I said, I think we kind of deploy it like all things, like in prefab isn't inherently right or wrong or good or bad.
00:46:32.159 --> 00:46:33.599
It's about how it's deployed.
00:46:33.679 --> 00:46:44.800
And so we kind of find that there's you know, there's specific projects and like these ones in the Palisades that makes it does make sense to to kind of suggest to the client maybe we should do this prefab.
00:46:45.119 --> 00:46:52.960
Um, and so yeah, we're just always looking to kind of uh deploy the the solution that that makes the most sense for the problem.
00:46:53.280 --> 00:46:54.079
Yeah, yeah.
00:46:54.320 --> 00:46:55.360
Uh that's fascinating.
00:46:55.519 --> 00:46:58.239
Well, hey, I like I said, I want to be sensitive with your time.
00:46:58.320 --> 00:46:59.920
I really, really appreciate this.
00:47:00.159 --> 00:47:09.199
Um, I find this topic of you know, everything with the end goal of just building the best product and having the best relationships possible with the great clients that we have.
00:47:09.280 --> 00:47:16.480
It's just such a vast, you know, experience and you know, pool of knowledge to be pulled from.
00:47:16.559 --> 00:47:21.760
And so, you know, specifically hearing it from your perspective was uh was very interesting, specifically to for myself.
00:47:21.840 --> 00:47:23.039
So I really appreciate it.
00:47:23.280 --> 00:47:28.239
Yeah, well I I I appreciate you having me and I really appreciate your perspective and insight.
00:47:28.320 --> 00:47:38.800
It it's kind of fun to hear yeah, how other builders are approaching the approaching the problem and and and have kind of um found the solutions that work best for that.
00:47:39.119 --> 00:47:40.880
I appreciate the conversation.
00:47:41.519 --> 00:47:42.000
Awesome.
00:47:42.159 --> 00:47:42.960
Well, thanks a bunch.
00:47:43.679 --> 00:47:44.639
Yeah, thanks, Alex.