All the companies that I've worked with that are successful have a degree of operator care wherein they participate in these cross-functional teams, operators, maintainers, maybe engineers, to bring uh an asset, you know, whether it's a pump or a pumping station or whatever it may be, where they work together to identify the defects and they work together to resolve those.
00:00:31.600 --> 00:00:38.640
You've said that expecting maintenance to own reliability is like expecting a mechanic to be responsible for a car's reliability.
00:00:38.799 --> 00:00:41.200
It ultimately comes down to how it's operated.
00:00:41.359 --> 00:00:45.920
How should organizations shift more responsibility for reliability onto operators?
00:00:46.000 --> 00:00:47.840
And what does that look like in practice?
00:00:48.240 --> 00:00:52.479
Well, uh, let's start with, you know, reliability itself.
00:00:52.560 --> 00:00:53.920
You know, what is it?
00:00:54.320 --> 00:01:06.400
Well, as you and I have discussed, reliability is the ability of a production system to deliver the maximum and quality product on time, in full, at the lowest sustainable cost.
00:01:06.480 --> 00:01:08.480
It's not just the equipment.
00:01:08.799 --> 00:01:21.680
And of course, operators would have a substantial responsibility for some of the losses associated with that, you know, in changeovers and shift handovers and the like.
00:01:21.920 --> 00:01:41.519
So I think the first thing you need to do is collect data about where your losses are, and collect information from the operators about where some of the issues and the problems are that are resulting in those losses, either production related or maintenance related.
00:01:41.760 --> 00:01:47.760
And then go talk to the operators and find out from them what's frustrating you, what's difficult for you.
00:01:48.000 --> 00:02:03.280
Now, here's some data, you know, share what you've learned and get them engaged in a conversation about what they might do, given all their other responsibilities, you know, what they might do to help mitigate some of those things.
00:02:03.519 --> 00:02:12.319
And then you let them help create, you know, the procedures, the processes, the changes that might need to be made.
00:02:12.639 --> 00:02:15.759
Because if they help create them, then they own them.
00:02:16.000 --> 00:02:25.439
Now, I've been in some plants that are highly unionized and really to some extent maybe too strongly unionized.
00:02:25.680 --> 00:02:45.120
And so in that situation, that's what I've suggested is look, you know, let's look at the issues and the problems, and let's ask ourselves, what is it that operators should, could do safely, right, and reliably, properly.
00:02:45.439 --> 00:02:52.319
Now, in doing that, though, we'll say, okay, we're we're gonna put the contract over here for a second.
00:02:52.400 --> 00:02:56.800
We're gonna come back to it to make sure that what we discuss is within the contract.
00:02:56.879 --> 00:03:01.919
But for the time being, let's just talk about what makes sense, what's appropriate for us to do.
00:03:02.159 --> 00:03:17.599
And you have a discussion a lot of times with maintenance and maybe even an engineer in the room, because you don't want them doing things that they're not skilled enough to do, or that might be unsafe that they're not aware of, and that sort of thing.
00:03:17.840 --> 00:03:21.039
And so you have this discussion about what makes sense.
00:03:21.280 --> 00:03:34.159
Well, let's presume you spent, you know, have a day or a day, you know, on a particular machine process, whatever it may be, and you've concluded this makes sense in light of all the other things I've got to do.
00:03:34.479 --> 00:03:40.879
Well, now you go back, if you're in a union environment, you go back and you say, Well, is that permitted by the contract?
00:03:41.039 --> 00:03:42.159
If it is, you do it.
00:03:42.319 --> 00:03:44.319
If it's not, you negotiate it.
00:03:44.560 --> 00:03:49.599
If you're not in a union environment, you just make a decision to go ahead and proceed with it.
00:03:49.919 --> 00:04:07.599
But the key here is act on data related to the business objectives and get the operations and maintenance people involved in selecting those tasks appropriate for resolution of those problems.
00:04:08.080 --> 00:04:13.199
And if you do that, you're much more likely to get pretty good implementation.
00:04:13.280 --> 00:04:17.199
You know, Margaret Wheatley said, people own what they create.
00:04:17.439 --> 00:04:25.439
Well, you have to get them involved in the creative process so they have a sense of control, of purpose, of ownership.
00:04:26.240 --> 00:04:29.040
And the data, by the way, substantiate this.
00:04:29.360 --> 00:04:36.720
The more operators are involved in taking care of, looking after equipment, the lower your cost, the better your performance.
00:04:37.040 --> 00:04:43.120
Can you share an example of a plant where shifting reliability responsibility to operators made a significant impact?
00:04:43.759 --> 00:04:55.199
Well, I would say not shifting it to operators per se, but shifting it to the production folks, the operating folks, which then promulgates down through the operators.
00:04:55.360 --> 00:05:04.560
But yeah, in in the um workshop I do, in the presentation I do, I talk about a company called Eastman Chemicals.
00:05:04.720 --> 00:05:08.399
Charlie Bailey was the VP of operations there.
00:05:09.040 --> 00:05:15.920
And he tried to get reliability by focusing on maintenance, and he got some improvement.
00:05:17.040 --> 00:05:33.519
But it wasn't until he went to the production folks and said, Look, I'm gonna hold you responsible for reliability, and let's give that some meaning for production schedule compliance, for maintenance schedule compliance, for maintenance and repair costs.
00:05:33.759 --> 00:05:36.720
But I'm still gonna hold maintenance responsible
Load full transcript
for those.
00:05:36.800 --> 00:05:40.720
So he created this environment where they had to work together.
00:05:40.879 --> 00:05:45.600
In fact, maybe they wanted to work together, and that's when he got the substantial improvement.
00:05:45.759 --> 00:05:53.680
Now, that same model I've applied in other organizations and gotten essentially the same result.
00:05:54.720 --> 00:06:02.879
So it it's it's an aligned, what, cooperative, collaborative environment that you get the best results.
00:06:03.279 --> 00:06:08.160
You mentioned that only about 30% of employees are truly engaged at work.
00:06:08.399 --> 00:06:13.439
What are the key factors that determine whether operators take an active role in reliability?
00:06:13.600 --> 00:06:17.279
And how can leadership increase engagement in reliability efforts?
00:06:17.759 --> 00:06:18.160
Yeah.
00:06:18.319 --> 00:06:20.879
Well, let's back up just a bit.
00:06:21.040 --> 00:06:39.439
Uh the data comes from a guy named Bob Kelleher, a really sharp guy in organizational issues, and he's done any number of surveys of any number of companies, and it's consistently year over year, it comes out that only about 30% of the workforce is engaged.
00:06:39.600 --> 00:06:42.160
That is, they truly want to work.
00:06:42.319 --> 00:06:46.639
They're looking for ways to improve, you know, they're actively engaged.
00:06:47.040 --> 00:06:51.040
And notionally around 50% are disengaged.
00:06:51.199 --> 00:06:58.160
Now, they do the minimum, they do a reasonable job, but they're not going to go out of their way to do much more.
00:06:58.639 --> 00:07:01.519
And then about 20% are actively disengaged.
00:07:01.600 --> 00:07:06.959
Now, these are the folks that are very unhappy with work, and they make sure everybody knows it.
00:07:07.199 --> 00:07:12.720
And so, you know, his view is kind of what what I alluded to earlier.
00:07:13.040 --> 00:07:21.120
You have to address the underlying issues that are creating the dissatisfaction or the lack of engagement.
00:07:21.360 --> 00:07:34.000
So in my work, what I found you do, you know, for example, I'm in a, you know, a plant of some sort, and there's a machine that's, you know, always breaking down.
00:07:34.480 --> 00:07:36.720
And so what do you do?
00:07:36.959 --> 00:07:40.959
Well, I pull together a cross-functional team.
00:07:41.360 --> 00:07:50.720
That cross-functional team sits in a room, you know, with me and and maybe an engineer, maybe even a vendor who knows that equipment well.
00:07:50.879 --> 00:07:57.199
And we discuss what's failing, how often is it failing, why is it failing, what's the consequence of that, and so on.
00:07:57.360 --> 00:07:59.439
We we identify a bunch of issues.
00:07:59.680 --> 00:08:03.439
Now, the next step, it kind of takes people aback sometimes.
00:08:03.600 --> 00:08:08.000
We actually, the next day, we go out and we clean the machine.
00:08:08.720 --> 00:08:12.480
And and you know, some people say, Clean the machine?
00:08:13.040 --> 00:08:14.160
Why would you do that?
00:08:14.399 --> 00:08:19.439
Well, the interesting thing is when you clean the machine, you have to get close to it.
00:08:19.600 --> 00:08:26.720
And when you clean it, you know, kind of like detailing a car, you find defects, problems, issues.
00:08:26.879 --> 00:08:40.960
You know, maybe things aren't quite aligned, maybe they're slipping a little bit, maybe you know, things need to be tightened a bit, you know, just all kinds of defects, little bitty defects, you'll find those and you can correct them.
00:08:41.279 --> 00:08:43.840
And out of that comes this sense of what?
00:08:44.000 --> 00:08:53.679
Teamwork, you're all working together, no matter what functional area you're from, you're all identifying problems, and then you're working together to resolve those.
00:08:53.919 --> 00:09:04.480
And at the end of the day, you know, things work pretty well and they look better, they're cleaner, they're, you know, they look like they've been cared for and loved.
00:09:04.720 --> 00:09:09.120
And people take a great deal of pride in doing something like that.
00:09:09.360 --> 00:09:13.519
So now once you've done that, you pick another one.
00:09:13.679 --> 00:09:16.799
And when you get done with that, you pick another one.
00:09:16.960 --> 00:09:23.279
And by the time you get through all of them, you're probably gonna go back to the first one and do it again, you know.
00:09:23.519 --> 00:09:29.039
But it it does instill this sense of purpose, pride, ownership, you know, that sort of thing.
00:09:29.279 --> 00:09:33.759
And it's really, I think it's essential in any organization.
00:09:33.919 --> 00:09:38.480
If you want to have excellence, you have to get the people involved in delivering that.
00:09:38.879 --> 00:09:43.600
What's one simple way a plant can improve operator engagement in reliability tomorrow?
00:09:44.000 --> 00:09:46.080
Well, I think I've alluded to those earlier.
00:09:46.159 --> 00:09:53.679
You know, you know, one simple thing you can do is go talk to the operators about what's wrong.
00:09:53.840 --> 00:09:55.120
How might they participate?
00:09:55.279 --> 00:10:00.399
What solution do they see and get them involved in and support them in doing that?
00:10:00.799 --> 00:10:05.600
You know, there's just uh maybe an example of this.
00:10:06.240 --> 00:10:12.559
I had a call one time from a company to come and work on a device called a scarfer.
00:10:12.799 --> 00:10:19.120
They wanted to do what amounted to an RCM or failure modes and effects analysis on the Scarfer.
00:10:19.200 --> 00:10:38.399
It's a big box-shaped, you know, blowtorch that you slide steel through, and they got burners every centimeter or so, and it burns the top millimeter or so of steel off the top of that slab to minimize surface uh cracking and that sort of thing.
00:10:39.519 --> 00:10:49.039
So we went and we talked a bit, and I said, Well, before we do this engineering analysis, let's go talk
to the operator.
00:10:50.000 --> 00:10:55.840
So I talked to the operator and I said, Well, what's the problem with this scarf for breaking down all the time?
00:10:56.000 --> 00:10:57.919
He said, Well, we've got a couple of problems.
00:10:58.080 --> 00:11:11.759
One is the uh cooling water for cooling the you know the elements of this burner, uh a lot of times they fail, you know, the the cooling element doesn't keep it cool enough.
00:11:12.080 --> 00:11:17.279
And if we could just change the filter more often, that would resolve that problem.
00:11:18.799 --> 00:11:19.360
Right?
00:11:19.519 --> 00:11:21.840
I mean pretty simple solution.
00:11:21.919 --> 00:11:22.639
I said, what else?
00:11:22.799 --> 00:11:29.200
He said, Well, when I get steel to run it through the scarfer, it's sometimes it's crooked.
00:11:30.080 --> 00:11:35.759
You know, and so it rubs and bangs the you know, the scarfer and damages it.
00:11:36.480 --> 00:11:41.279
Okay, so we we go up to the rolling mill where they roll the steel to send it to him.
00:11:41.360 --> 00:11:42.240
And I said, What's the problem?
00:11:42.399 --> 00:11:44.480
You can't send them straight steel.
00:11:44.639 --> 00:11:52.559
He says, Well, we got a biggest problem is I get steel from the ovens that's not uniform temperature.
00:11:53.759 --> 00:11:55.120
Oh, okay.
00:11:55.440 --> 00:12:01.120
He said, So when I roll it, it tends to curl or crook and damages the scarf.
00:12:01.440 --> 00:12:02.240
I said, Oh, okay.
00:12:02.879 --> 00:12:04.960
So I go up to the ovens operator.
00:12:05.120 --> 00:12:06.159
I said, What's the problem?
00:12:06.240 --> 00:12:10.159
You can't send them uniform temperature steel to roll.
00:12:10.320 --> 00:12:16.879
He said, Well, my supervisor told me to leave the tops off the ovens to get better throughput.
00:12:17.519 --> 00:12:20.960
And so cold air goes down the side and cools them off.
00:12:24.320 --> 00:12:25.360
Okay, then.
00:12:25.759 --> 00:12:39.519
So, you know, a lot of times these problems have to do with, you know, the sequence of events or the lack of understanding downstream of what you're doing to impact them, you know, a lack of a systems level understanding.
00:12:39.679 --> 00:12:55.279
And so going and talking to the operators very often gets you a fairly straightforward identification of the problem, and it makes it much easier to, you know, solve the problem, and they become involved in helping you create the solution.
00:12:55.600 --> 00:13:03.679
So, again, it's all about engaging the workforce and helping you identify the issues and being a part of the solution.
00:13:04.080 --> 00:13:10.799
In your experience, what are the most impactful reliability-related tasks that operators can take ownership of?
00:13:10.960 --> 00:13:16.320
Where is the line between operator care and what should remain within the maintenance team's domain?
00:13:17.039 --> 00:13:35.600
Well, certainly the things that should remain in the maintenance
team's domain is things that operators are not trained or qualified or competent to do, or things that are uh in what expose the operator to certain safety hazards or risks.
00:13:36.080 --> 00:13:40.159
And that's why the maintenance folks need to be uh a part of that.
00:13:40.639 --> 00:14:02.639
Now, what they can do has to do with in each site looking at the equipment, looking at what the simple tasks are, getting them involved and helping you identify those, and then setting a standard for doing those that's safe, you know, reliable, that they have competency to do.
00:14:03.279 --> 00:14:15.759
And as I sit here, I can't give you specific examples because it's going to vary, even within a plan, it's going to vary from machine to machine to machine.
00:14:16.320 --> 00:14:25.200
So, but again, it has to do with going to the operator and help letting them help you identify what makes sense for them to do.
00:14:25.519 --> 00:14:28.960
You've talked about operator care being the foundation of reliability.
00:14:29.120 --> 00:14:32.159
Can you share an example of a company that got this balance right?
00:14:32.559 --> 00:15:07.519
All the companies that I've worked with that are successful have a degree of operator care wherein they participate in these cross-functional teams, you know, operators, maintainers, maybe engineers, to bring uh an asset, you know, whether it's a pump or a pumping station or a saw or an injection mold or whatever it may be, where they work together to identify the defects, and they work together to resolve those.
00:15:07.600 --> 00:15:20.159
And then out of that comes a set of, you know, a set of procedures or standards or a checklist that fosters their continued, you know, addressing of those tasks.
00:15:20.720 --> 00:15:28.000
And it's it's kind of hard and difficult because it's going to be difficult to identify specific ones because it's going to differ.
00:15:28.159 --> 00:15:36.960
You know, if you're in a paper mill, that's going to be different from a steel mill, which is going to be different from a chemical plant, which is going to be different from a food plant.
00:15:37.440 --> 00:15:42.559
You know, it depends on the machine, the process, the issue that's at hand.
00:15:42.879 --> 00:15:48.720
Many organizations struggle with operators resisting additional responsibilities in maintenance and reliability.
00:15:48.960 --> 00:15:53.360
What are the biggest cultural roadblocks you've seen, and how can companies overcome them?
00:15:54.000 --> 00:16:24.000
Go to the operator and find out what are the tasks that they could do, given all the other things they have to do, such that they don't feel pressured to not do those that are important for them to do, and such that they feel like they're part of identifying, you know, what problems need to be addressed that will make their life easier, not your life, their life.
00:16:24.240 --> 00:16:35.759
Because I mean, they're most interested in their life and making it easier, making it more, you know, making it safer, making it more convenient, making it with less hassle.
00:16:36.080 --> 00:16:42.159
Now, but at some point you have to align that with what's the right thing to do for the business.
00:16:42.240 --> 00:16:51.360
So there's going to be some give and take in there about what makes sense to do, you know, all things considered.
00:16:51.600 --> 00:17:12.000
Uh, but it it all boils down to having these folks participate in helping create the processes and understanding the importance of helping improve the process and of having them them having some sort of reward in it, you know, maybe might be a little money.
00:17:12.160 --> 00:17:14.000
Sometimes it might be thank you.
00:17:14.160 --> 00:17:17.680
You know, sometimes it might be taking folks out for pizza.
00:17:17.920 --> 00:17:20.400
You know, it doesn't have to be a big, huge thing.
00:17:20.480 --> 00:17:33.279
It just has you just have to show a little appreciation and consideration for what they're doing and get them involved in hopefully doing it better.
00:17:39.519 --> 00:17:52.480
Well, let's go back to the you know, my my definition, the ability for a production process to deliver the maximum and quality of product on time and full at the lowest sustainable cost.
00:17:53.119 --> 00:18:02.160
Well, in in a I think in a good organization, there would be some sort of reward for the success of that business, right?
00:18:02.480 --> 00:18:09.200
Everybody knows that if we do well, we're going to get another 10% on top of our regular pay.
00:18:09.359 --> 00:18:09.680
Okay.
00:18:10.240 --> 00:18:18.559
And if not only if we do well, I'm going to be in an environment where I have less hassle, less stress, less risk of injury.
00:18:18.960 --> 00:18:38.720
And so if if you can engage the workforce in that and helping them minimize that fear that you're trying to impose something on them that they don't know how to do or feel like they're being oppressed with it, and all you've done is add another task.
00:18:39.200 --> 00:18:45.200
And the other thing to do is maybe they're doing tasks that don't add any value to the business.
00:18:45.920 --> 00:18:58.880
So you should ask them about those things that don't add any value, that maybe got established 10, 15 years ago that now no longer apply, that they're still doing.
00:18:59.519 --> 00:19:02.400
Well, let's stop doing that and maybe do this.
00:19:03.519 --> 00:19:23.200
But it all has to do with the leadership creating an environment where there's open communication, where there's consistency in the alignment to a particular set of objectives, and where there's a collaborative environment that engages the workforce.
00:19:35.035 --> 00:19:39.355
Well, it it's gonna vary from from plant to plant, okay?
00:19:39.755 --> 00:19:44.154
But there the things that come to mind in terms of leading indicators.
00:19:44.234 --> 00:19:48.634
Now let's let's back up and let's define leading
and lagging indicators.
00:19:48.880 --> 00:19:57.440
A leading indicator is something you do in a plant that results in improvement in a lagging indicator.
00:19:57.680 --> 00:20:02.480
So for example, and I'm going to give you a maintenance one, then we'll go back to operations.
00:20:02.880 --> 00:20:10.799
If I do precision alignment and balancing on a rotating machine, that will give me longer life.
00:20:11.039 --> 00:20:13.279
That will give me lower costs.
00:20:13.599 --> 00:20:20.559
Well, the leading indicator is did I do precision work, you know, precision alignment balancing on every machine.
00:20:20.640 --> 00:20:25.839
The lagging indicator is I got lower costs and I got higher output.
00:20:26.079 --> 00:20:26.400
Okay.
00:20:26.880 --> 00:20:29.839
So the same thing applies to, you know, operators.
00:20:30.000 --> 00:20:47.039
So and an operator, if for example, if I have lots of leaks in my process, well, that creates spills, which creates hazards, which creates work, which you know, and creates disruption to the process.
00:20:47.279 --> 00:20:52.880
Well, if if you've got 10 spills a month, you can get that down to one.
00:20:53.039 --> 00:20:54.319
That's a leading indicator.
00:20:54.480 --> 00:21:02.000
If you get rid of those spills, then likewise you're going to have, you know, better, you know, lower costs, better output, and so on.
00:21:02.240 --> 00:21:04.319
Another one might be alarms.
00:21:04.559 --> 00:21:14.480
You know, maybe, maybe the system originally set up and now, you know, now we're getting you know, you know, far more alarms than we otherwise should.
00:21:14.880 --> 00:21:36.000
Well, maybe we ought to go through and analyze all those and begin to change the alarm settings or eliminate the alarms or do something that minimizes the fact that after a while you just disable the alarm until it goes off again, then you disable it, and you and after a while it has no meaning.
00:21:36.319 --> 00:21:39.119
So, you know, talk to the operators about that.
00:21:39.359 --> 00:21:47.680
So things like you know, spills, alarms, maybe another one might be uh process excursions.
00:21:48.000 --> 00:21:53.759
Maybe from time to time you'll have an excursion in the process for one reason or another.
00:21:54.000 --> 00:21:59.279
And so keep track of those excursions, identify the cause.
00:22:00.079 --> 00:22:29.200
Maybe it was a procedure, maybe it was an operating condition, maybe it was a piece of equipment, maybe it was instruments going out of calibration, and then get them involved in minimizing the disruptions of the excursions in the process that go above or below your, you know, your set points or your upper and lower control limits, and gradually over time, excuse me, minimize the number of excursions.
00:22:29.359 --> 00:22:33.279
So each each one of these is kind of a leading indicator.
00:22:33.519 --> 00:22:41.599
But if you do that, you're going to have better lagging indicators, lower cost, better output, better quality, that sort of thing.
00:22:42.160 --> 00:22:46.799
And by the way, it it depends on each site what those might be.
00:22:47.680 --> 00:22:54.720
Can you give an example of a plant that successfully tied operator performance to reliability without it feeling punitive?
00:22:55.279 --> 00:23:04.880
Well, you know, those plants, where we've been successful in doing that, then there's some sort of set of uh, you know, reward, right?
00:23:05.200 --> 00:23:14.720
Where somebody could be a simple reward, like I said earlier, like buying pizza or taking them out to dinner, or, you know, something real simple.
00:23:14.960 --> 00:23:28.480
In other cases, it could be, well, if we achieve 10% greater production output, there'll be another whatever form of you know remuneration, reward for you if we do that.
00:23:28.720 --> 00:23:47.200
And then that provides some incentive, but it can't be such that I still have to do all that other stuff, some of which doesn't add any value, and some of which I feel like is silly, unless unless they understand why it's being done, and then maybe it's not so silly.
00:23:47.519 --> 00:23:53.839
So you can you can tie in money or you can tie in just simple things like, thank you.
00:23:54.079 --> 00:23:56.240
I really appreciate what you did there.
00:23:56.559 --> 00:24:02.640
In discussions about reliability, we often talk about operations rather than just operators.
00:24:02.880 --> 00:24:04.640
Why is that distinction important?
00:24:04.720 --> 00:24:14.880
And how does looking at reliability from an operations-wide perspective, rather than focusing solely on individual operators, change the way organizations approach improvement?
00:24:15.279 --> 00:24:20.400
The you know operators are a part of the uh you know operational excellence.
00:24:20.640 --> 00:24:26.880
So one of the reasons you want to think holistically about the operation is this.
00:24:27.359 --> 00:24:32.559
And it's it's the causes of all the all the lost production capacity.
00:24:32.720 --> 00:24:41.440
So for example, an operations person would be looking at raw material supply, quantity and quality.
00:24:42.160 --> 00:24:45.680
That can impact your operation, right?
00:24:46.240 --> 00:24:58.319
An operations guy would be looking at sequencing of product changeovers, because that can impact your you know, your ability to produce and and your overall efficiency.
00:24:58.640 --> 00:25:16.640
An operations guy would be looking at uh things like shift no shows, right, when people don't show up for work, or would be looking at the training and the skills of the operators to do the work and do it effectively.
00:25:16.960 --> 00:25:24.480
An operations guy would be looking at process changeovers, which can affect your overall production.
00:25:25.279 --> 00:25:29.680
Uh an operations guy would be looking at things like short stops.
00:25:30.000 --> 00:25:37.839
You know, where you know some of these folks when they measure this so-called OEE, well, they don't measure anything less than 10 minutes.
00:25:39.039 --> 00:25:48.640
Well, sometimes what that induces is uh there's no not very many stops that are, you know, over 10 minutes.
00:25:48.799 --> 00:25:58.720
And so you hide a lot of lost production in that you know that arbitrary criteria of, you know, it's less than if it's less than 10 minutes, we don't count it.
00:25:58.799 --> 00:26:00.400
You need to count everything.
00:26:00.640 --> 00:26:11.680
So there, and there are other you know issues that can result in poorer operational performance that the operator doesn't actually control.
00:26:12.559 --> 00:26:16.400
And so it's really important that we take that view.
00:26:17.200 --> 00:26:23.519
But that said, operators are really essential for having a good and reliable operation.
00:26:23.920 --> 00:26:30.640
Red Talks features voices driving safety, reliability, and innovation forward in the industrial world.
00:26:30.799 --> 00:26:34.400
If your work challenges the status quo, we'd like to hear from you.
00:26:34.559 --> 00:26:37.279
Learn more at redtalk.comslashabout.