TRANSKRIPT 🔗
WEBVTT
00:08.519 --> 00:11.567
Hi and welcome once again to the Renewable Roundup
00:12.067 --> 00:15.915
podcast from Schneider Electric. I'm Russell Redding, Head of Energy Markets at ZYGO.
00:16.380 --> 00:20.857
Each week I want to bring you a podcast with top stories, critical sustainability
00:21.113 --> 00:25.349
insights, and expert voices that really get you thinking. So please
00:25.943 --> 00:29.491
Hit the subscribe button and don't miss a thing. This week I'm really pleased
00:29.991 --> 00:33.585
to be joined by Jorge Aranillas of Encavis. Jorge has agreed to have a
00:34.085 --> 00:37.310
chat with me about how customers have become much more sophisticated
00:37.728 --> 00:41.276
and the shift from just renewable assets over to customer
00:41.776 --> 00:45.435
solutions, including why global capability and
00:45.675 --> 00:49.160
local expertise really matter. So how have customer
00:49.660 --> 00:52.772
needs evolved? What are energy producers doing to respond?
00:53.141 --> 00:57.161
And importantly, Will Jorge and I bet any money on
00:57.210 --> 01:00.335
the outcome of GHG? Let's find out.
01:03.843 --> 01:11.185
Hello,
01:11.588 --> 01:14.597
welcome, and once again thank you for joining me for
01:15.097 --> 01:19.349
this week's Renewable Roundup podcast. Today I've got Jorge
01:19.849 --> 01:23.356
from NCVIS and he is going to talk about the value there is in
01:23.856 --> 01:27.242
cross-country multi-technology portfolio
01:27.547 --> 01:31.179
and how those kind of solutions can really add value.
01:31.805 --> 01:35.084
But first of all, Jorge, thank you for joining me, and how are you
01:35.584 --> 01:39.288
today? Very well, thank you, Russell. It is great
01:39.788 --> 01:42.451
to be here, and thank you again very much for inviting me.
01:42.919 --> 01:45.906
Thanks a lot. Oh, thank you. I think, I think it's gonna be a really
01:46.406 --> 01:50.160
interesting topic, so thanks for coming and agreeing
01:50.434 --> 01:52.689
to share your experiences and your insight.
01:53.530 --> 01:57.397
Before we dive into the topic itself, would you like
01:57.414 --> 02:00.704
to give me an introduction to you and Encavis,
02:00.768 --> 02:04.219
please? Sure, of course. I'm Jorge
02:04.719 --> 02:07.573
Arenillas, Managing Director of Encavis Energy Solutions,
02:08.247 --> 02:11.842
the commercial and market-facing arm of Encavis across
02:11.858 --> 02:15.309
the countries in which we operate. I've spent
02:15.566 --> 02:19.241
my career across the energy sector, including roles at Cepsa,
02:19.401 --> 02:22.098
oil company, Acciona, and Sonetics, among others.
02:22.836 --> 02:26.539
And I've held different responsibilities there, right? Mainly around
02:27.039 --> 02:30.434
energy management, trading, origination, and often in businesses,
02:30.466 --> 02:33.752
right? Going through significant periods of growth
02:34.252 --> 02:37.663
and transformation. Around Encavis, Encavis is a
02:38.163 --> 02:41.734
pan-European
Load full transcript
renewable energy company with more than 25 years of
02:41.942 --> 02:45.677
experience. Since 2025, Encavis is backed
02:46.177 --> 02:49.652
by a KKR-led consortium with BizMan as co-investor as well.
02:50.502 --> 02:54.352
Today, our platform includes more than 300
02:54.852 --> 02:58.539
wind, solar, and battery plants, over 5 gigawatts of
02:58.603 --> 03:01.924
installed nominal capacity, and activities across 13 European
03:02.052 --> 03:05.164
markets. And again, as Encavis
03:05.664 --> 03:09.190
continues to grow, one of the most interesting opportunities is how we
03:09.254 --> 03:12.703
use that operational portfolio more intelligently, not only to
03:13.203 --> 03:16.585
maximize the value of our assets, right, but also to create better solutions
03:16.633 --> 03:20.161
for customers. That's fabulous. I think it's
03:20.661 --> 03:23.847
going to be really, really interesting because you've obviously got, like you say,
03:23.863 --> 03:27.598
Encavis is a wide scope geographically,
03:28.496 --> 03:31.863
but also that large portfolio and the linking of the market and the
03:32.363 --> 03:36.175
customers. And it's a bit like me, even with my history and being involved
03:36.271 --> 03:39.717
with customers and renewables. So with
03:40.217 --> 03:44.061
all of that in mind, here we're working with corporates
03:44.561 --> 03:47.075
and we're seeing that the needs of energy buyers are changing.
03:47.668 --> 03:51.562
With your background and experience, I would really love to hear your
03:51.594 --> 03:54.806
perspective on how those energy customers
03:54.838 --> 03:58.130
are evolving, what their needs are, and how they're changing, and what
03:58.630 --> 04:01.934
it means for a renewable energy producer like Encavis.
04:03.720 --> 04:07.183
No, I agree completely that customer requirements are changing.
04:08.326 --> 04:11.982
I often say that customers do not necessarily wake
04:12.482 --> 04:16.490
up in the morning wanting a PPA, right? What they actually need is electricity
04:16.523 --> 04:19.943
that is competitive, reliable, and I would say
04:20.443 --> 04:24.047
increasingly renewable. A traditional PPA can, of course,
04:24.240 --> 04:28.184
be a very effective instrument sometimes. It can provide long-term
04:28.684 --> 04:32.738
price visibility, support their decarbonization objectives, and connect a customer
04:33.238 --> 04:36.442
with a specific renewable asset. So, PPAs will therefore
04:36.942 --> 04:40.242
continue to play a significant role. However,
04:40.530 --> 04:44.299
customers' needs are becoming more and more diverse and sophisticated
04:44.799 --> 04:49.101
over time. Just to give a few examples, right? Some customers want long-term
04:49.601 --> 04:53.666
price certainty, while others require greater flexibility. Some want a strong
04:53.698 --> 04:57.341
connection with particular renewable assets, others with
04:57.841 --> 05:01.661
a project in the same country where they consume electricity, but
others are
05:02.161 --> 05:06.594
mainly concerned with managing their overall energy cost and exposure to market volatility.
05:08.374 --> 05:11.849
We also see considerable differences in customers' experience
05:12.045 --> 05:16.366
and internal resources. Some large industrial companies have sophisticated
05:16.866 --> 05:20.797
energy procurement teams and well-defined hedging strategies, while other
05:21.297 --> 05:24.875
companies genuinely want to procure renewable electricity but might not
05:25.375 --> 05:29.275
have the resources to evaluate every aspect of,
05:29.628 --> 05:33.321
let's say, profile risk, negative prices balancing, or the
05:33.821 --> 05:36.741
different contractual structures available, right?
05:37.479 --> 05:41.220
I would also mention that there's also a fundamental physical
05:41.332 --> 05:44.655
challenge, right? Customers consume electricity according to their
05:44.784 --> 05:48.556
needs of the business, while renewable assets produce according to
05:49.056 --> 05:52.072
the weather. A solar plant might produce heavily during
05:52.104 --> 05:55.491
the middle of the day, while an industrial customer might consume
05:55.991 --> 05:59.809
electricity throughout the day and night, right? Wind generation often
06:00.309 --> 06:03.902
provides a better fit with industrial consumption profiles, which makes
06:04.402 --> 06:08.022
it a key component when structuring products that more
06:08.087 --> 06:11.452
closely reflect customers' needs. Battery storage,
06:11.549 --> 06:15.432
that is, as you know, right now in
06:15.594 --> 06:19.468
every forum, in every conversation, can add part of flexibility by
06:19.968 --> 06:24.016
shifting, right, part of this renewable production between hours and helping
06:24.289 --> 06:28.138
to reduce a specific mismatch. However, I see
06:28.154 --> 06:31.536
batteries primarily as a flexible optimization tool rather than
06:31.827 --> 06:35.795
as a single solution for shaping. An entire customer load profile.
06:36.773 --> 06:40.572
So the objective is not to make, I would say, one technology
06:40.684 --> 06:44.387
replicate the customer's entire consumption curve. That's almost impossible. But it's
06:45.397 --> 06:49.260
to combine complementary technologies and market capabilities for
06:49.760 --> 06:52.883
the team to achieve an overall better fit, I would say.
06:53.572 --> 06:57.644
So this is why I would say customers are increasingly interested in solutions
06:57.676 --> 07:00.690
that look beyond the output of one individual asset.
07:00.802 --> 07:04.794
They want combinations of assets that better reflect their consumption while
07:04.810 --> 07:08.547
still, of course, delivering the cost, risk, and the sustainability
07:08.579 --> 07:10.985
outcomes that the customers might require.
07:12.188 --> 07:15.845
And on the other side, from our side, Russell, for renewable producers,
07:15.942 --> 07:19.808
right, this means becoming more customer-oriented. Instead of
07:20.308 --> 07:23.594
beginning with the product that we have in our desks and we
07:24.094 --> 07:27.315
need to ask the customer and adapt to it, we should begin
07:27.347 --> 07:30.684
by understanding them, what they need, their consumption profile, objectives,
07:30.860 --> 07:33.751
risk appetite, et cetera, et cetera. We can then,
07:34.090 --> 07:37.778
with all the pieces on the table, determine which is the combination
07:38.278 --> 07:42.232
of generation, contracts, market procurement, storage, and risk management that
07:42.732 --> 07:46.479
is more appropriate. So customers should not have
07:46.592 --> 07:50.512
to adapt their business solely to the production profile of pure
07:51.012 --> 07:54.903
renewable assets. Our role is to use the portfolio to build a
07:55.403 --> 07:58.684
solution for them. Jorge, I knew
07:59.184 --> 08:02.316
there was a really good reason I wanted you on, and I think that was
08:02.462 --> 08:06.176
it. I think we think so alike on this, and I completely agree
08:06.241 --> 08:09.710
with you. In the past, I can remember
08:10.210 --> 08:13.975
a time when corporate energy strategy was just what day did I
08:14.475 --> 08:17.341
fix my price on because I want it to be, you know, the lowest possible.
08:18.100 --> 08:21.980
That's, you know, that's evolved so much over time through sort of flexible
08:21.996 --> 08:25.361
purchasing and risk management, and now it's so much more.
08:25.522 --> 08:28.822
It's kind of what am I buying, when am I buying it, what else am
08:28.871 --> 08:32.040
I doing. So, you know, as you say, you've got, yeah, you know,
08:32.120 --> 08:36.115
what are you taking from a utility, but also what might you be self-generating,
08:36.692 --> 08:39.708
or what's coming from a PPA and when and how,
08:39.836 --> 08:43.782
and how is that structured? Even then out into how am
08:43.830 --> 08:47.295
I using it, you know, and the interplay
08:47.795 --> 08:51.770
between what I'm buying and that might be, you know, the generation shapes of
08:52.270 --> 08:55.765
any PPAs you have and any flexibility, any batteries.
08:56.101 --> 08:59.407
How am I optimizing the plant on site to either
08:59.907 --> 09:03.308
not use it or use it at the right time. It's such a big piece
09:03.420 --> 09:06.760
now, and it really has, you know, moving on,
09:06.936 --> 09:10.115
and we see it moving on even further with the use of AI and people.
09:10.163 --> 09:14.240
So they say, well, we're going to actually concentrate on how we're using it and
09:14.321 --> 09:17.050
how we align with it. But I think you're absolutely right, you know,
09:17.451 --> 09:21.127
it's moved away from a sort of very
09:21.159 --> 09:24.707
simple offer, you know, like, well, a bit of an offer
09:24.771 --> 09:28.595
and to a degree simplicity to be much more complex. And much,
09:29.175 --> 09:32.432
much more solution-focused, which I think is why,
09:33.061 --> 09:36.335
you know, what Enkavis is
doing just makes so much sense.
09:38.082 --> 09:41.269
So having talked about that massive kind of increase in,
09:41.447 --> 09:45.007
should we say, complexity and needs and the different strategic
09:45.507 --> 09:48.855
looks and how we're thinking about it very differently when we're buying energy,
09:50.283 --> 09:53.775
obviously you've got a really varied operational energy
09:53.904 --> 09:57.478
portfolio and it's across multiple countries, multiple technologies. You've got battery storage and
09:57.978 --> 10:02.282
everything else. What would you see as the value
10:02.830 --> 10:06.168
of that for both NCARBIS and the energy
10:06.297 --> 10:09.852
customer? Good question,
10:09.868 --> 10:14.461
Russell. So, I think the first obvious advantage is diversification,
10:14.478 --> 10:17.939
right? If you consider an individual renewable asset,
10:18.036 --> 10:21.408
its performance is influenced by the weather conditions, market prices,
10:21.522 --> 10:25.577
grid situation, even regulatory framework in one particular
10:26.077 --> 10:30.048
location. When you operate across several countries and technologies,
10:30.144 --> 10:34.378
you are less dependent on that single production profile, or one weather pattern,
10:34.570 --> 10:37.826
or one regulatory framework, or one market environment.
10:39.141 --> 10:43.054
Solar and wind provide a good, good, good example. They generate
10:43.554 --> 10:47.208
at different times and are affected by different weather conditions. They are not perfectly
10:47.304 --> 10:51.778
complementary, and simply combining solar and wind does not remove intermittency.
10:52.532 --> 10:56.270
However, I believe it gives you more options than relying on
10:56.366 --> 10:59.574
only one technology. Battery storage, we mentioned that
11:00.074 --> 11:03.970
before, introduces another source of flexibility. It can shift energy between hours,
11:04.082 --> 11:06.938
help manage specific production and market exposures. Again,
11:07.595 --> 11:11.670
not a universal solution, but it provides an additional tool for optimizing
11:11.702 --> 11:15.841
the portfolio. This is one, but geographical diversification
11:16.338 --> 11:20.893
creates to me another dimension. Weather conditions,
11:20.925 --> 11:24.916
market prices, renewable generation, grid constraints, and customer
11:25.416 --> 11:29.084
demand, I would say, are not identical across Europe or different
11:29.584 --> 11:34.021
countries across the globe. A portfolio across several countries therefore provides
11:34.133 --> 11:37.291
broader market experience and greater resilience.
11:38.061 --> 11:41.411
However, the value of the portfolio does not emerge automatically
11:41.539 --> 11:45.419
simply by the assets existing. The portfolio needs
11:45.435 --> 11:48.993
to be actively understood and managed. You need reliable production
11:49.041 --> 11:51.912
forecasts, market access, portfolio management capacity, probabilities,
11:52.666 --> 11:56.517
pricing modeling, and of course, the ability to actually manage the
11:57.017 --> 12:00.689
resulting exposures. The way I see
12:00.705 --> 12:03.898
it is that you need to understand not only how much electricity the assets are
12:04.398 --> 12:07.813
expected to produce, but when and where that production will occur,
12:07.893 --> 12:10.300
and what is the value that you might have in the market.
12:11.182 --> 12:14.889
The operational nature of the portfolio is also very important.
12:14.969 --> 12:18.435
Sometimes we don't give the value for it, but there's
12:18.499 --> 12:22.780
a minimum difference between discussing a theoretical future pipeline
12:22.972 --> 12:27.525
and managing renewable assets that are already today producing
12:27.573 --> 12:31.725
electricity. For Encabis, for example, the portfolio creates
12:32.225 --> 12:35.732
value in 2 directions, right? One, for the company, it provides a platform
12:36.232 --> 12:39.403
for diversification, active risk management, and optimization. But for
12:39.903 --> 12:43.475
our customers, it gives us a broader set of, I would call,
12:43.828 --> 12:47.338
building blocks, right? And greater flexibility than we would
12:47.838 --> 12:53.135
have if we were offering production from only one individual technology or country.
12:53.200 --> 12:56.069
So as a quick summary, right, the value— the way I see it, the value
12:56.569 --> 12:59.937
is not simply in owning more and more and more assets. The value comes
12:59.970 --> 13:03.662
from understanding how those assets interact
13:03.695 --> 13:07.173
and managing them as one single portfolio.
13:09.162 --> 13:11.952
That makes a lot of sense. And I think, yeah, it does,
13:11.969 --> 13:15.840
Jorge. It makes a lot of sense because I think the,
13:16.018 --> 13:18.873
the 2 things that leap out for me is, is one, at some point down
13:18.905 --> 13:22.691
there in the future, we we're not just going to keep building forever. We're eventually
13:23.191 --> 13:26.489
going to get enough renewable assets that, you know, there's going to be build and
13:26.761 --> 13:30.623
repowering and kind of churn. But, you know,
13:31.232 --> 13:35.110
things are going to be reasonably balanced. And then the way that you use operational
13:35.610 --> 13:39.003
assets will be the most important thing. It won't be just, oh, I stuck another
13:39.019 --> 13:42.464
asset on and I matched it. Exactly. And secondly,
13:42.849 --> 13:46.150
my experience has been that even, you know, looking at the sort
13:46.650 --> 13:50.613
of technology match, Um, even looking at a relatively
13:50.645 --> 13:54.099
baseload consumption customer, even with an oversized wind
13:54.599 --> 13:58.083
farm, might only match sort of 50% of the time on
13:58.131 --> 14:02.099
an hourly basis. And, and yet, if, if you stir in some other technologies,
14:02.195 --> 14:06.050
you know, you, you, you, you get appropriately sized solar,
14:06.372 --> 14:10.291
maybe some battery, you know, even maybe some other technology like a small run
14:10.323 --> 14:13.729
of river if it's available or something like that, you can suddenly kick that into
14:13.761 --> 14:16.171
the 80-85%. Um, which then isn't,
14:16.669 --> 14:20.508
isn't, isn't a huge leap to sort of think, well, actually, what we've
14:21.008 --> 14:24.475
got, like 15% now, that's not, that's not like not matched.
14:24.555 --> 14:27.575
So, um, it is amazing and actually very interesting,
14:27.591 --> 14:30.932
like you say then. Um, and I think what we, what we don't always
14:30.980 --> 14:33.695
immediately think of, but I know we see a bit more here at Schneider,
14:33.711 --> 14:36.634
is that, that kind of, you know, pan-European bit,
14:36.811 --> 14:40.088
like what have I got, where is it, how does it relate to things?
14:40.184 --> 14:43.524
Because You've got a mix now, a more complicated
14:43.572 --> 14:47.345
potential mix of locality depending on what GHG and SBTi
14:47.845 --> 14:51.792
are saying, but actually different demands, different things. Is Polish
14:52.065 --> 14:55.533
wind a really good fit for some Spanish solar, and where
14:56.033 --> 14:59.273
does it best fit into that? Or actually, might some Italian,
14:59.948 --> 15:03.480
you know, might some Italian solar fit well with some German wind?
15:03.624 --> 15:06.899
It is, it's all a question of working
15:06.915 --> 15:10.207
out where is that. That's really You know,
15:10.287 --> 15:12.989
I say it's, it's really where I think the next level of is, particularly with
15:13.022 --> 15:14.839
the operational stuff. Um,
15:16.110 --> 15:18.878
so I think as many,
15:19.539 --> 15:22.906
um, as many developers,
15:23.019 --> 15:26.547
as many, um, you know,
15:28.877 --> 15:32.316
IPPs will look at these things. Having a renewable asset,
15:32.413 --> 15:36.199
well, that's just one thing, but kind of maximizing the value through its operating
15:36.232 --> 15:39.295
life is another. Um, Do you think
15:39.795 --> 15:43.306
that relates to the value maximization? A,
15:43.516 --> 15:47.009
does it relate to solutions that better match how customers consume,
15:47.042 --> 15:49.879
which is kind of what you said in that one? And what do you think
15:50.120 --> 15:53.743
are the capabilities that a renewable producer
15:54.403 --> 15:56.769
really needs to have to achieve that?
15:58.750 --> 16:02.519
Yeah, I would say that
16:02.729 --> 16:06.023
everything begins with operational excellence.
16:07.338 --> 16:10.836
The assets must be available, efficient, and performing as expected,
16:11.012 --> 16:14.734
right? Commercial capabilities cannot compensate for
16:14.943 --> 16:18.360
poor technical performance. So obviously asset
16:18.408 --> 16:22.226
management, maintenance, engineering, and operational data remain the essential foundation
16:22.258 --> 16:25.788
to me. But having strong assets
16:26.288 --> 16:30.248
is only, I would say, the starting point to maximize their
value,
16:31.146 --> 16:35.224
A renewable producer, a PPP, as you said, needs several additional capabilities
16:35.256 --> 16:38.483
that work together through the commercial value chain.
16:39.286 --> 16:42.609
So there are a few ones. I'm going to mention
16:42.641 --> 16:46.173
just the ones that come to my mind. But I would say the
16:46.318 --> 16:50.235
first one is, I would say, origination, right? Origination is much
16:50.251 --> 16:53.767
more, in my view, than selling a predefined product. It is
16:53.799 --> 16:57.058
about understanding the market, identifying the right customers,
16:57.315 --> 17:02.049
and establishing the right relationships at the right moment. This is particularly
17:02.549 --> 17:05.960
important because not every customer is the right match for every renewable
17:06.136 --> 17:09.903
producer portfolio. The origination team needs to understand the customer's
17:10.403 --> 17:13.622
consumption objectives, decision-making process, and appetite for risk, among others,
17:13.687 --> 17:17.181
right? While at the same time understanding what
17:17.213 --> 17:19.746
the producer can continually deliver.
17:20.115 --> 17:23.914
So we can deliver the same for every customer. So in many cases,
17:24.042 --> 17:27.376
origination is what ensures that the right customer
17:27.876 --> 17:31.496
is connected with the right renewable portfolio at the right time, which is more complex
17:31.996 --> 17:35.422
than, than just mentioning it, but this is the core to me,
17:35.486 --> 17:39.738
right? However, I would say coordination can only make credible
17:39.770 --> 17:43.317
commitments when it is supported by strong capabilities behind it.
17:44.125 --> 17:47.660
And that leads me to the second pillar, I would say,
17:47.741 --> 17:49.290
that is portfolio management.
17:50.824 --> 17:54.591
Instead of assessing each asset or contract in isolation,
17:54.704 --> 17:58.277
portfolio management provides a consolidated view of expected generation,
17:58.342 --> 18:01.214
contract volumes, hedge positions, remaining market exposure,
18:02.256 --> 18:06.376
it helps as well to understand where the portfolio is naturally long
18:06.600 --> 18:10.367
or short, how concentrated it is by country, by technology, or production profile,
18:11.009 --> 18:14.631
and which new customer contract could best complement the positions
18:14.696 --> 18:18.751
we already have. So once a potential opportunity has
18:18.783 --> 18:22.759
been identified and assessed against the portfolio, the next capability to me is
18:23.753 --> 18:27.584
one that is getting more and more critical over time, is modeling pricing and
18:27.664 --> 18:31.033
structuring. We discussed earlier,
18:31.274 --> 18:34.468
Russell, but customers increasingly want solutions
18:34.484 --> 18:38.031
that better reflect how they actually consume electricity, right? To make the
18:38.531 --> 18:42.444
final proposition simple and understandable for the customer, the producer
18:42.944 --> 18:46.746
needs to analyze the underlying complexity in considerable detail.
18:47.805 --> 18:51.159
This means assessing expected generation, consumption profiles,
18:51.272 --> 18:53.968
volume, shape, risk balancing, exposure, you name it.
18:54.450 --> 18:58.130
Negative prices, credit requirements, interaction between the proposed
18:58.630 --> 19:02.030
contract and the contracts in the existing portfolio, et cetera, et cetera.
19:02.530 --> 19:06.430
This becomes even more and more sophisticated when flexible assets
19:06.930 --> 19:10.910
such as battery storage assets are included. So, these batteries introduce valuable
19:11.410 --> 19:14.870
optionality, but that optionality needs to be
19:15.370 --> 19:18.890
properly understood and valued. Its contribution depends a lot on when it
19:19.390 --> 19:22.850
charges, discharges, the operating constraints of the asset, the market opportunities available,
19:23.350 --> 19:24.550
and how its flexibility interacts with the rest of the portfolio.
19:27.737 --> 19:30.733
So, although the customer proposition should be clear,
19:31.364 --> 19:34.959
to me, the analysis behind it cannot be at any point simplistic.
19:35.962 --> 19:39.355
And then we have the deal, right? We have the origination, the portfolio management knows
19:39.855 --> 19:43.342
exactly what it is, and the modeling pricing team just
19:43.842 --> 19:46.462
analyzing everything in detail. But once the solution is there,
19:48.291 --> 19:51.577
which is great, it's been structured, we know what we
19:51.593 --> 19:55.445
want, but now we approach to physical delivery. And to me,
19:55.509 --> 19:59.347
short-term trading— and there are several names for it— but short-term trading
19:59.379 --> 20:02.863
becomes critical. Forecast production will
20:03.698 --> 20:06.957
differ from actual production by definition. Market conditions will
20:07.005 --> 20:10.586
change continuously, right? Portfolio therefore
20:11.086 --> 20:14.760
needs to be managed through the day ahead, intraday, balancing responsibilities,
20:14.856 --> 20:18.662
physical power logistics must also be handled professionally.
20:19.288 --> 20:22.918
But short-term trading is not only about just correcting forecasts.
20:23.609 --> 20:27.256
As the portfolios grow and become more diverse, to me, it becomes
20:27.384 --> 20:30.463
increasingly important to capture the value embedded in our
20:30.963 --> 20:32.129
assets as market conditions evolve.
20:34.080 --> 20:37.913
Renewable producers have traditionally outsourced significant
20:37.994 --> 20:41.067
parts of the physical dispatch and short-term management of their assets.
20:41.714 --> 20:45.669
And I want to be clear, outsourcing can be great
20:46.169 --> 20:49.905
and can provide market access and operational efficiency, particularly while
20:50.405 --> 20:54.587
internal capacities are being developed. I mean, we all have done that, right? And that
20:55.087 --> 20:59.837
makes
full sense. But however, if the producer outsources the full decision-making
20:59.901 --> 21:03.754
process, it will also transfer part of the portfolio
21:04.254 --> 21:08.089
inside flexibility and optimization potential to a third party. So it's
21:08.589 --> 21:13.130
not something for the renewable producer, it's also something that we could get for
21:13.630 --> 21:17.770
the client. So this is why to me strong internal short-term trading
21:17.802 --> 21:21.480
dispatching capabilities are strategically important. They keep the
21:21.980 --> 21:25.210
producer closer to the assets and provide much clearer understanding.
21:25.780 --> 21:29.580
Just an example, and I'm giving you a very long answer,
21:30.080 --> 21:34.020
right? But Encavis already has significant operational
21:34.520 --> 21:38.040
experience in this case in Germany, where ES, Encavis Energy Solutions,
21:38.540 --> 21:41.960
has progressively expanded its activity to a portfolio of,
21:42.460 --> 21:46.500
I would say, more than 50 assets, more than 500 megawatts in 2026.
21:47.000 --> 21:49.080
And we aim to increase that figure to 1 gigawatt by the end of the
21:49.580 --> 21:53.050
year in Germany. So we do have those capabilities, but on top
21:53.550 --> 21:57.330
of that, we are now building these capabilities and developing the
21:57.830 --> 22:01.490
infrastructure required to extend the model that we have right now in Germany progressively
22:01.990 --> 22:05.710
into additional markets. I could mention
22:06.210 --> 22:10.070
Spain, for example, or Italy. And finally,
22:10.570 --> 22:13.510
the last lever, and I just put it with this because we talk about,
22:13.810 --> 22:17.310
let's say, technical teams, and this has been in the market, let's say,
22:17.810 --> 22:21.277
forever. The market has evolved, but this has been forever. But now the last one
22:21.309 --> 22:25.290
that to me is even more relevant is
22:26.670 --> 22:29.993
reliable data, robust systems, strong commercial operations,
22:30.041 --> 22:33.605
you name it before, Russell, AI, etc. This becomes
22:33.669 --> 22:37.249
increasingly important as the portfolio grows across markets, technologies,
22:37.345 --> 22:40.860
countries. And this rapid development of AI and automation,
22:40.973 --> 22:44.793
the quality and accessibility of the underlying data will
22:44.825 --> 22:48.692
increasingly determine how effectively we can analyze
22:48.836 --> 22:51.482
positions, automate process, and at the end of the day,
22:52.108 --> 22:55.251
getting more value of our assets and transfer part of that value to
22:55.751 --> 22:59.020
the clients as well. So maximizing value
22:59.520 --> 23:03.141
in general does not mean taking more risk. It means understanding
23:03.189 --> 23:06.397
the portfolio in more detail, making better informed decisions,
23:06.461 --> 23:09.460
and managing risk more intelligently.
23:10.005 --> 23:13.933
So a very long answer, Russell, but there was a lot of
23:14.433 --> 23:17.620
different pieces to tackle here. It was, and it's a great answer.
23:17.765 --> 23:21.948
I've been sitting listening, trying to pick out some bits, and I think the
23:22.448 --> 23:26.405
bits that I picked out in terms of the technology,
23:26.517 --> 23:30.044
I think you're right. It's the technology, the data,
23:30.124 --> 23:34.099
the speed of response, having the right things. From my own background previously
23:34.131 --> 23:37.385
in a supplier utility and seeing that,
23:38.043 --> 23:42.034
you can have very knowledgeable traders, you can have access to everything, but actually
23:42.451 --> 23:46.638
that bottleneck is having the data at your fingertips. And having the right analysis,
23:47.023 --> 23:50.507
figuring out what's going on right now and what
23:51.007 --> 23:53.478
does it mean, what I need to do with that. And I do think the
23:53.978 --> 23:56.754
technology in that area is coming along, and I think we'll see a lot.
23:57.139 --> 24:00.382
Um, and I think, you know, that as you say, the way
24:00.430 --> 24:04.300
that you optimize, I, I think, you know, it's almost like NCAVIS really is putting
24:04.800 --> 24:08.571
the next-gen bit into next-gen IPP. And it's like, how are you
24:08.716 --> 24:12.694
evolving? You know, how In, in the old days,
24:12.710 --> 24:15.851
you know, oh well, build it, run it, see what happens. It's not like that
24:16.351 --> 24:19.442
at all. It's so much more proactive. And then I think, you know,
24:19.778 --> 24:22.199
coming right back to what you said at the beginning, there's a whole balancing act,
24:22.247 --> 24:25.837
isn't there, with understanding the customer and then trying to balance
24:25.965 --> 24:29.444
in, in that origination process. Well, we understand
24:29.476 --> 24:33.178
them really, really well, hopefully, and what they want. Can we deliver
24:33.226 --> 24:36.945
it? Do we have the flexibility or the capability in our portfolio?
24:37.009 --> 24:40.825
And by building that back part, that next-gen and
24:41.241 --> 24:44.448
IPP part, you've got a better chance of doing it. So I think that's,
24:44.544 --> 24:48.809
that's, that's a really interesting, um, kind of evolution.
24:48.874 --> 24:52.802
And it, you know, um, the whole thing is becoming— I
24:53.302 --> 24:55.624
don't want to say more decentralized, that's not what I mean. I think it's becoming
24:56.124 --> 24:59.424
more diverse. That's the word I'm looking for. You know, the energy
24:59.440 --> 25:03.513
sphere is more diverse, it's more technical, it's more complex, but people are rising
25:03.609 --> 25:05.934
to that and getting the benefits of it.
25:06.415 --> 25:10.005
Um, So, that's really good. So, to move along
25:10.037 --> 25:13.591
a bit, I think, to me, it feels like,
25:13.655 --> 25:16.853
for a while, we've been in a place where, you know, in EU,
25:16.902 --> 25:20.314
the scale has been key on PPAs. But I think with—
25:21.754 --> 25:26.284
well,
who knows exactly what GHG Protocol will come out with, and SBTi
25:26.784 --> 25:30.358
changes coming through, I feel, and I'm hearing more and more,
25:30.374 --> 25:33.752
that locality is becoming more important. So,
25:33.768 --> 25:37.294
looking ahead, Do you feel— what
25:37.585 --> 25:40.786
will be your kind of view and experience telling you
25:40.900 --> 25:44.440
that what's the right balance between the big European scale and
25:44.940 --> 25:48.266
the local market expertise for an energy producer?
25:49.057 --> 25:52.189
Yeah, I think success in general,
25:52.447 --> 25:56.454
I think successful renewable producers increasingly need both
25:56.842 --> 26:00.979
multi-country scale and strong local expertise.
26:01.746 --> 26:04.967
I do not see them as alternatives, right? So it's not black or white.
26:05.111 --> 26:08.349
I see them being one with the other.
26:08.413 --> 26:12.628
I see them complementary. So operating across multiple
26:12.644 --> 26:16.747
countries creates several important disadvantages. We already discussed
26:16.811 --> 26:20.032
about that, right? Scale is also relevant
26:20.532 --> 26:24.007
when working with large customers operating globally or across several countries.
26:24.359 --> 26:28.222
These companies might value having one strategic partner capable
26:28.302 --> 26:32.503
of understanding their wider energy requirements and then supporting
26:32.695 --> 26:35.072
a consistent, let's say, overall strategy.
26:36.550 --> 26:40.404
This is great, but at the same time, we must not forget electricity
26:40.904 --> 26:45.431
markets remain deeply local. So each
26:45.448 --> 26:49.174
country has its own regulation, market design, grid conditions,
26:49.238 --> 26:52.177
balancing arrangement, and contractual practices.
26:53.253 --> 26:56.770
The dynamics affecting a solar portfolio in Spain are not the same as
26:57.270 --> 27:00.689
those affecting wind assets in Germany or a customer supply solution in Italy.
27:01.845 --> 27:05.568
Customer relationships are also local. Understanding how
27:05.681 --> 27:08.794
a customer operates, how it procures electricity,
27:09.693 --> 27:13.336
what risks it is willing to accept requires proximity and market knowledge.
27:13.802 --> 27:17.172
Language and cultural understanding also matter.
27:17.654 --> 27:19.869
We underestimate that, but they also matter a lot,
27:20.446 --> 27:25.133
particularly when discussing complex and financially significant
27:25.633 --> 27:29.482
energy contracts. So therefore, I do not believe that global scale should
27:29.530 --> 27:33.126
mean centralizing everything or offering exactly the same product everywhere.
27:33.929 --> 27:37.926
The model, I believe, is a combination. It combines strong
27:38.119 --> 27:41.217
central capabilities with empowered local teams.
27:42.036 --> 27:45.183
So certain capabilities benefit significantly from scale,
27:45.343 --> 27:49.084
right? We named it before, portfolio management, data systems,
27:49.260 --> 27:52.423
that's obvious, right? That you can clearly benefit of that.
27:52.551 --> 27:55.954
But at the same time, local teams are essential.
27:56.179 --> 28:00.574
Origination, customer relationships, regulation, understanding the practical
28:01.074 --> 28:04.295
realities of each market are key. Short-term market that we
28:04.795 --> 28:08.673
discussed, the short-term market execution, balancing, etc., requires deep
28:09.010 --> 28:12.121
knowledge of the country and its power market agreements.
28:12.217 --> 28:16.002
This is in general are super detailed and complex things that you need to treat
28:16.502 --> 28:20.525
it locally. So again, an example for Encavis,
28:21.038 --> 28:24.665
our presence across multiple European markets give us an
28:25.165 --> 28:28.954
excellent foundation, obviously. We have operational assets, people, and expertise
28:29.692 --> 28:33.049
in different countries. The opportunity is to connect those
28:33.161 --> 28:37.225
components more closely so the knowledge, capabilities, and portfolio
28:37.241 --> 28:40.308
advantages of the wider group can support
28:40.808 --> 28:43.858
effective local execution. As an example, right,
28:44.243 --> 28:46.604
our recent expansion in Spain is a good one.
28:47.520 --> 28:50.812
Only a few months ago, we opened our new office in Madrid and reinforced our
28:50.893 --> 28:54.805
local team. This was not simply about opening another location.
28:55.094 --> 28:58.733
It was about being closer to the customers, understanding the local
28:58.765 --> 29:02.468
market in greater depth, and building the origination,
29:02.532 --> 29:07.261
trading, commercial capabilities required to grow successfully in any
29:07.761 --> 29:10.980
country, in this case in Spain, right? But that local presence is great,
29:11.348 --> 29:14.907
but of course, super supported by the broader Encavis platform.
29:15.596 --> 29:19.107
Spanish team can draw on the group's traditional portfolio,
29:19.123 --> 29:22.602
portfolio management expertise, systems, experience, et cetera, et cetera.
29:23.115 --> 29:27.321
But then, You know, I would say I've been speaking from a company
29:27.821 --> 29:31.287
perspective, from an Encavis perspective, but from a customer perspective,
29:31.640 --> 29:34.739
this combination is particularly relevant for companies
29:34.915 --> 29:38.319
operating globally or across several countries. They may want
29:38.384 --> 29:42.157
a consistent strategic partner and a coordinated energy strategy,
29:42.558 --> 29:46.380
but the solution still needs to work locally in every
29:46.412 --> 29:50.610
single market. So Just
29:51.110 --> 29:54.370
changing a little bit the topic, right? From the potential changes that you mentioned,
29:54.610 --> 29:57.950
honestly, Russell, I would be careful not to
29:58.450 --> 30:02.130
predict the final outcome of these frameworks. They move, you know,
30:02.630 --> 30:05.349
they move so
many times that I might be even a little bit lost now,
30:05.849 --> 30:09.450
right? But I think— I'm not putting money on anything, to be honest with
30:09.950 --> 30:13.790
you. I'll just leave it there. Exactly. Me neither.
30:14.290 --> 30:17.003
But the broader direction is clear. Is clear.
30:18.047 --> 30:21.786
Customers are not looking for renewable electricity
30:21.818 --> 30:24.996
only. They increasingly want a clear connection
30:25.012 --> 30:28.238
between their consumption and the renewable sources supporting it.
30:29.121 --> 30:32.571
Whether that ultimately translates into stricter requirements
30:33.071 --> 30:37.226
around location matching, time matching, or other forms of carbon
30:37.726 --> 30:40.516
accounting, the underlying objective is similar, I would say, right?
30:40.757 --> 30:44.446
Maybe I'm oversimplifying, but establishing a closer and more credible
30:44.946 --> 30:48.823
link between the physical electricity consumption and the renewable generation.
30:49.898 --> 30:52.992
And in that context, local market expertise
30:53.025 --> 30:56.247
becomes even more and more important.
30:56.536 --> 31:00.048
So, yeah, just recap, right? The right model is neither
31:00.657 --> 31:04.265
centralized or completely decentralized. This multi-country
31:04.765 --> 31:08.241
scale gives you the platform, diversification capabilities that we discussed
31:08.257 --> 31:11.363
before, but local expertise. Ensure that those,
31:12.366 --> 31:15.976
I would say, capabilities are translated into solutions that genuinely
31:16.720 --> 31:18.695
work in each market, I would say.
31:21.047 --> 31:23.882
Yeah, I think that makes sense. And I think, you know,
31:24.768 --> 31:28.247
the link between having that deep
31:28.311 --> 31:32.433
local expertise, but the global scale, the global scale doesn't
31:32.933 --> 31:36.320
work without local expertise. It's just in my view. And I think, you know,
31:36.417 --> 31:40.810
I done some other podcasts where we've talked about the link between sustainability
31:40.826 --> 31:44.371
and success. And one of the things, and to be fair, we've not discussed
31:44.871 --> 31:48.701
in that, but we've seen is that, that there very much is that,
31:49.407 --> 31:53.032
you know, that link in, in many cases between the
31:53.532 --> 31:57.105
scale and, and multiple technology— multiple,
31:57.121 --> 32:00.105
sorry, geographies. Not even just a massive scale,
32:00.169 --> 32:03.457
you know, sometimes just 2 geographies, but that link between the
32:03.521 --> 32:06.896
deep understanding of those 2 places, for example,
32:07.363 --> 32:10.967
or saying, as you said, you know, I'm a multinational corporation,
32:11.546 --> 32:15.182
which is fine, I've got my centralized strategy, but we've got all the local teams
32:15.682 --> 32:18.539
working on it and we've got a link. So I can definitely see that.
32:18.894 --> 32:21.945
And as you said, and there's no way I think anyone listening is
going to
32:21.961 --> 32:26.004
bet anything on what exactly is going to come out of GHG. So I
32:26.069 --> 32:27.950
think that's very fair.
32:30.047 --> 32:33.507
Before we wrap up, I really appreciate, you know, you joining
32:33.523 --> 32:36.643
me, but have you got any last thoughts before we close, please,
32:37.161 --> 32:37.419
Jorge?
32:40.475 --> 32:44.499
Perhaps just one that I hear over time, so maybe
32:45.303 --> 32:49.050
it's worth highlighting. So from a customer
32:49.550 --> 32:53.321
perspective, Russell, renewable electricity can sometimes appear relatively
32:53.434 --> 32:57.302
standard, right? An electron is an electron, but the company standing behind
32:57.304 --> 33:00.417
the contract, managing the assets and supporting the customer
33:00.483 --> 33:03.976
is not always the same. We named it before,
33:04.040 --> 33:07.317
energy agreements can be significant and long-term commitments.
33:07.734 --> 33:09.806
Customers should look, in my opinion,
33:10.706 --> 33:14.143
beyond the headline price and consider the strength of the
33:14.643 --> 33:18.223
partner they are choosing. That means looking for a company
33:18.320 --> 33:21.837
with strong operational assets, well-diversified portfolio,
33:21.934 --> 33:25.564
different technologies, what we have been discussing during the, the whole
33:26.064 --> 33:30.046
conversation, right? So it's important that they understand who
33:30.222 --> 33:33.992
stands behind that company. Strong and committed shareholders can
33:34.492 --> 33:37.569
provide additional stability and support investment and long-term growth,
33:37.938 --> 33:41.275
not just for the company, but also for the client that is getting into a
33:41.355 --> 33:45.623
long-term contract or a relationship with the
33:46.123 --> 33:49.714
producer, right? Customers should look at that. So what I would
33:50.214 --> 33:54.607
say is, yeah, in general, right, for customers to not look only at
33:55.107 --> 33:58.697
one of the points, it could be volume, electricity product, whatever, look carefully
33:59.259 --> 34:02.402
at the partner behind it. The right partner should have the assets,
34:02.450 --> 34:06.217
capabilities, diversification, a strong backing, and local
34:06.717 --> 34:09.808
expertise to support your businesses as
34:10.337 --> 34:13.736
your needs need the energy market continue to evolve, right? This is
34:13.752 --> 34:17.262
going to evolve. So having a partner next to you in general, in the long
34:17.294 --> 34:21.623
run, I think it's super, super relevant. So I mean, I could be talking
34:21.687 --> 34:25.390
with you for hours, Russell. Very interesting topic. And it's been a real, real,
34:25.454 --> 34:29.124
real pleasure. I, I've really enjoyed it. It's been really
34:29.237 --> 34:31.882
interesting, and I would agree. And the word I pulled out of what you said
34:32.382 --> 34:35.489
in that last answer, um, Jorge, was, was partner. And I think that's been really
34:35.989 --> 34:39.898
important, and that's been my experience in long-term contracts, because you don't
34:40.398 --> 34:43.874
know what's gonna happen. Okay. Um, and, you know, good or
34:43.890 --> 34:47.401
bad. And to be fair, nothing might happen and it's fine, but it's one
34:47.901 --> 34:51.617
of those things where whenever there is, you know,
34:51.681 --> 34:54.278
a barrier, a bump in the road, whatever you want to call it, um,
34:54.471 --> 34:58.566
working with a partner who's, you know, got got capability
34:59.066 --> 35:02.686
and flexibility, and let's be honest, we're people, is good to work
35:03.186 --> 35:07.347
with, is really worth, is really worth something because actually it's
35:07.411 --> 35:10.914
not just the fact that the deal works today, it's the fact that it works
35:11.203 --> 35:14.745
and works and continues to work for years to come. So I think, you know,
35:14.906 --> 35:18.087
that, that, that's, that's really important. I think so. Um,
35:19.750 --> 35:23.535
we could talk, uh, again, you know, for hours. I'm, I am
35:24.035 --> 35:26.375
hopeful that you will agree to come and do this again sometime with me.
35:27.022 --> 35:30.780
But for now, I just want to say thank you so much for joining me.
35:30.876 --> 35:33.783
It's been a great conversation. Thank you, Russell.
35:33.847 --> 35:37.171
Great conversation and I'm looking forward for the next one
35:37.204 --> 35:40.110
if you need. Thanks a lot, Russell. Oh, definitely.
35:40.335 --> 35:43.948
And if anyone's listening, if anything that we've raised today
35:44.045 --> 35:47.658
is of interest, you are welcome to reach out to Jorge
35:48.158 --> 35:51.641
directly through LinkedIn. You know, you can Google Enkavis
35:51.753 --> 35:54.772
and find him through there. You can reach out to us here at Zygo and,
35:55.286 --> 35:58.068
or me directly, and I can also put you in touch if that matters.
35:58.181 --> 36:01.755
So if there's anything of interest, um, feel free to get in touch. Um,
36:01.884 --> 36:04.396
Jorge, thank you very much again. Thank you very much,